Frequently Used Special Provisions (FUSP)

GENERAL NOTES  

NOTICE TO BIDDERS  

FUSP Code Title Date
 Modified
Pay
Item
 Notes
20PCProgress Clause12/16/2025N/AProgress Clause. For local let projects, rename file "ADMIN4_PCL".
20MOTMaintaining Traffic1/31/2024N/AEntire document has been updated. Read for pay items! 
MDOT MOTMDOT Traffic Typical Spreadsheet1/03/2023N/A

This spreadsheet was made from the Work Zone section of the Michigan Department of Transportation Traffic and Safety/Standards and Special Details.  It is a refined list of typicals RCOC would generally use with notes to help the user, including sign quantities.  It is a tool to use with the Maintaining Traffic SP.  This spreadsheet utilizes tables and can be filtered as needed. 

NB1Project Coordination (MDOT)11/24/2025N/AUpdate to include nearby projects. (FOR MDOT USE ONLY)
NB2 Utility Coordination3/26/2024N/AUpdate utility companies and conflicts per project.
NB3Response to Contractors Inquiry6/21/2021N/AUsed to clarify information that is not clear to the contractor.
NB5Project Special Provisions2/4/15N/AUse when two projects under one contract are similar but separate special provisions for the project/Contract.
SP812APermanent Signage
4/28/2022N/A
Requires the Contractor to provide shop drawings of all custom face layout permanent signage. Use on all projects with custom face permanent signage.

DIVISION TWO-EARTHWORK     

DIVISION THREE- BASES     

DIVISION FOUR-DRAINAGE     

DIVISION FIVE-HMA 

Use on all projects with HMA.    

DIVISION SIX-PORTLAND CEMENT CONCRETE PAVEMENTS     

DIVISION SEVEN - STRUCTURES     

DIVISION EIGHT - INCENDENTAL CONSTRUCTION 

FUSP
Code
TitleDate
Modified 
Pay
Item
Notes
SP802AConcrete Curb and Gutter, RCOC4/5/2021Curb and Gutter, Conc, Det_, RCOC (Ft)
Curb and Gutter, Conc, Det_, Roundabout (Ft)
To be used anytime standard curb is modified. (Examples: spill out, mountable, roundabout) Include detail in plans.
SP802BDriveway Opening Concrete Detail M4/5/2021Driveway Opening, Conc, Det M, RCOC (Ft)Use across commercial drive approaches. Generally not used on side street approaches unless one is needed to maintain drainage. Include detail in plans.
SP802CConcrete Spillway4/5/2021Spillway, Conc, RCOC (Ft)45 degree angle concrete spillway. Do not use shoulder gutter item with this. Include detail in plans.
SP803B Brick, Salv and Replace 4/5/2021Brick, Salv and Replace (Sft)Use with existing brick pavers to be salvaged and reinstalled. Include detail in the plans.
SP803E Detectable Warning Surfaces11/24/2021Detectable Warning Surface, West Bloomfield Township (Ft)
Detectable Warning Surface, RCOC (Ft)
Use with sidewalk (ADA) for all RCOC projects. Check with city, village, or township to verify correct use of color, material, etc..
SP805A HMA Gutter and Spillways  4/5/2021 HMA Gutter (Ft)
HMA Spillway (Ft) 
Do not use unless approved by RCOC. Clarifies to use materials as specified in the HMA Application Estimate. This may be applicable on PM projects.
SP807AGuardrail, Wood Back4/5/2021Guardrail, Wood Back (Ft)Use whenever guardrail is adjacent to sidewalk. Do not install on GR endings.
SP807BGuardrail Approach Terminal, Type 2M, MSKT2/13/2026Guardrail Approach Terminal, Type 2M, MSKT (Ea)Use whenever MGS type 2 guardrail approach terminal is in the plans. This spec ensures the selection of the MSKT option. MKST Sole Source letter is also necessary to include if using this spec. 
SP807CMSKT Type 2, MASH, Guaw/8684/RCOC20SP810A_PostFlexDelinrdrail Approach Terminal Sole Source Letter1/28/2021SOLE SOURCE LETTER for Guardrail Approach Terminal 2M, MSKT (Ea)This letter is required for all MDOT projects using pay item "Guard Rail Approach Terminal Type 2M, MSKT" in the plans. 
SP807DMDOT Form 304 - Sole Source for MSKT PAY ITEM10/19/2023SOLE SOURCE for Guardrail Approach Terminal 2M, MSKT (Ea) on MDOT ProjectsTo be included with Final Plan Submittal to MDOT - Not for proposal book. Do not use on local agency projects.
SP808AFence, Protective, RCOC 4/5/2021Fence, Protective, RCOC (Ft)Use on bridge/culvert projects with waterways used by watercrafts.
SP810APost, Flexible, Delineator4/5/2021Post, Flexible, Delineator, RCOC (Ea)Used at shoulder/curb transitions and to mark a drainage outlet. Changed from ASTM Type IV to ASTM Type XI. 
SP812B Temporary Barrier Floats and Buoys 11/17/2021 Regulatory Buoy, Closed Area, Temp (Ea)
 Regulatory Buoy, Danger, Temp (Ea)
 Barrier Float, Temp (Ft)
 
SP813ARiprap4/5/2021Riprap, Plain, RCOC (Syd) Riprap Plain, RCOC (Ton)
Riprap, Heavy RCOC (Syd)
Riprap, Heavy, RCOC (Ton)
Used for outlet protection and stream banks. Revised heavy riprap size to remove overlap in sizes. Also added language to include geotextile liner in the pay items.
SP813BRiprap, Natural Stone 4/5/2021Riprap, Natural Stone (Syd)Used in residential locations for aesthetics. 
SP814A Natural Channel Structures 4/5/2021 Cross Vane (Syd)  As required by EGLE permit. Detail required in plan set. 
SP814BDitch, Plain Cobble4/5/2021Ditch, Plain Cobble, RCOC (Syd)Similar to MDOT's with the following exceptions: Does not allow crushed concrete, and the minimum average size stone is 8 inches (up from the MDOT 3 inches).
SP816A Geocellular Confinement System  4/5/2021Geocellular Confinement System (Syd) Use on slopes with 1:2 or steeper for slope stabilization. This should be approved by RCOC prior to use. 
SP816BReinforced Turf Driveway5/22/2025Reinf Turf Driveway (Syd)To be utilized for temporary access driveways. Include detail in plans.
SP816CTurf Establishment, Performance, RCOC10/29/2024Turf Establishment, Sod, Performance, RCOC (Syd)
Turf Establishment, (Type) Seed, (Type) Mulch, Performance, RCOC (Syd)
Used for establishment of turf and restoration along roadways after completion of road construction. Note that final acceptance can not happen sooner than 60 days from day of placement. EMR (snake) friendly mix included as "special mulch". Verify acceptance (60days) with Progress Clause. Temp seeding and temp mulch blankets are paid for separately. 
SP823AFire Hydrant and Relocation4/5/2021Fire Hydrant Adjustment (Ea)
Fire Hydrant Relocation, Method _ (Ea)
Use this spec for all fire hydrant adjustments and relocations. Include detail sheet in plans if using spec. Coordinate use with the owner of the water main (township, utility, etc…). 
SP823BAdjusting Water Shutoff or Valve Box 4/5/2021Water Shutoff, Adj, Case _, RCOC (Ea)
Valve Box, Adj, Case _ (Ea) 
 Use spec for all valve box or water shuttoff adjustments.
SP823CAbandon Water Well 4/5/2021Water Well, Abandon (Ea)Use spec for all water well abandons. 
SP850AReconstructing Sprinkler Systems4/5/2021Sprinkler Head, Relocate (Ea)
Sprinkler Head, Replace (Ea)
Sprinkler Line (Ft)
Irrigation Control Box, Relocate (Ea)
Irrigation Control Box, Replace (Ea)
Include for reconstruction of impacted irrigation and control boxes. Site inspection is recommended, to apply appropriate quantities
SP850BTemporary Pavement Repair 4/5/2021Temp Pavement Repair (Syd)
Temp Pavement Repair, Mobilization (Ea)
Do not use on culvert replacements or PM Jobs. Its best used for staged construction or were you maintain traffic on poor pavements. Also include the MDOT pay item "HMA Patch, Rem"
SP850C Calcium Chloride 4/5/2021 Calcium Chloride (Gal)Used after HMA Crushing and Shaping, discuss with RCOC Project Engineer prior to use.  


DIVISION NINE - MATERIALS    

DIVISION 10 - CONCRETE MIXTURES     


WARRANTY INFORMATION    

TRAFFIC SAFETY (PAVEMENT MARKINGS AND SIGNING)    

FUSP
Code
TitleDate
Modified
Pay
Item
Notes
Traffic Safety General NotesTraffic Safety General Notes12/09/2024 N/AUse this in all projects requiring temporary or permanent traffic control. Update the relevant section in this Word document, create a PDF, and reference it in AutoCAD using external references (Xrefs). Transform this Word document to letter size when working on log plans.
SP810BPost Hole Through Conc for Steel Post, 10-inch dia 1/30/2025Post Hole Through Conc for Steel Post, 10-inch dia (Ea)Used when drilling post holes through concrete.

SP810D St Sign Post
1/08/2025 St Sign Post (Ea)  
SP811APermanent Pavement Markings2/09/2026
Pavt Mrkg, Sprayable Thermopl, _ inch, White, RCOC (Ft)
Pavt Mrkg, Sprayable Thermopl, _ inch, Yellow, RCOC (Ft)
Used on all projects using sprayable thermoplastic.
SP811BRaised Pavement Markers (RPM)N/ARaised Pavt Marker, Retrflec, Monodirectional (Ea)
Raised Pavement Marker, Retrflec, Amber, Bidirectional (Ea)
Raised Pavement Marker, Retrflec, Crystal, Monodirectional (Ea)
Used for installation of raised pavement markers, with iron castings and replaceable prismatic retroreflectors for reflecting light from single or opposite directions. 
SP811CCurb Pavement Marking, Waterborne 8 Inch12/08/2022Pavt Mrkg, Waterborne, Curb, 8 Inch, Yellow (Ft)Used in all projects where curb painting is required, as directed by RCOC Traffic Safety-Engineering.
SP811DCall Back, Mobilization12/13/2022Call Back, Mobilization (Ea)DO NOT USE, for use by TS-ENG county wide striping contract ONLY.
SP822B
Sinusoidal Centerline Corrugations
12/03/2024Sinusoidal Corrugations, Milled, HMA Centerline, RCOC (Ft) 
These are mumble strips, use at the request of RCOC. Verify all pavement marking quantities are included in the contract per TS order of operations if the specifier uses these items. The use of R-112 is not required as this spec has everything one needs.



TRAFFIC OPERATIONS CENTER (TOC) (TRAFFIC SIGNALS) 

FSUP 
Code
TitleDate
Modified
Pay
Item
Notes
TOC General NotesTraffic Operations Center General Notes 7/22/2025N/ATraffic Operations Center general notes for all construction projects involving signal work.  Modify for MDOT projects let after December 2023 using MDOT LRFD details.
TOC Std. Con. DetailsRCOC Traffic Safety Department Standard Construction Details 4/1/2014N/AIncluded in contract by reference in Traffic Signal Work - Construction Methods special provision (verify RCOCSP818B is included in proposal).  (Note:  For RCOC local let projects (Do not use with MDOT let projects after December 2023))
SP850BBTree Trimming - Traffic Signals3/19/2025Tree Trimming, RCOC (Ft)
Tree Trimming, Single Tree Top, RCOC (Ea)
May be needed for signal projects. Evaluate in the field.
SP818ATraffic Signal Inspection3/1/2025
N/AUse on all projects with traffic signals.  
SP818BTraffic Signal Work - Construction Methods4/21/2025
N/AUse on all projects with traffic signals.
SP818CConcrete for Traffic Signal Work 3/1/2025
N/AUse on all projects with traffic signals and signals concrete.
SP818EConduit, Directional Bore 3/1/2025
Conduit, Directional Bore, (number), _ inch, RCOC (Ft)Use RCOC version and not MDOT's. 
SP818F Handhole, Round5/5/2025
Hh, Round, 2 foot dia, RCOC (Ea) 
Hh, Round, 3 foot dia, RCOC (Ea)
Pay item specific to Oakland County signals projects. Pay item names have been revised. 
SP818J
Anchor Bolt Testing - Approved RCOC Independent Labs
10/1/2025N/ANotice to bidders for all RCOC maintained intersections.
SP820ATraffic Signal Backplate, Retrofit3/1/2025
Backplate, Retrofit, RCOC (Ea)
Backplate, Retrofit, (number) Section, RCOC (Ea)
Backplate, Retrofit, HAWK, RCOC (Ea)
Backplate, Retrofit, (number) Section, with case sign, RCOC (Ea)
Backplate, TS, Rem, RCOC (Ea)
Backplates - used on retrofit projects only. 
SP820B Traffic Signal Backplates3/1/2025
Backplate, TS, RCOC (Ea) Backplates - new installations; material is no longer incidental. 
SP820BBOptical Priority Control System - Infrared12/1/2025
Optical Priority Control System, Infrared, RCOC (Ea)
Optical Priority Control System, Infrared, Rem, RCOC (Ea)
Optical Priority Control System, Infrared, Salv, RCOC (Ea)
 Pay item specific to City of Novi
SP820CDigital / ITS Type NEMA TS2 Cabinet  8/1/2025Cabinet, ITS Type, RCOC (Ea)
Cabinet, ITS Type, Salv, RCOC (Ea)
Cabinet, ITS Type, Delivered, RCOC (Ea)
Cabinet - ITS type is the typical installation. RCOC does not maintain non-ITS type cabinets and should not be specified. 
SP820D Traffic Monitoring Camera 7/26/2025Camera, Traf Monitoring, RCOC (Ea)
Camera, Traf Monitoring, Salv, RCOC (Ea)
Camera, Traf Monitoring, Rem, RCOC (Ea)
Camera, Traf Monitoring, Cable Junction Box, RCOC (Ea) 
Traffic Monitoring/CCTV cameras. 
SP820ECase Sign (Non-illuminated)3/1/2025
Case Sign, __Way, __inch by__inch, Non-Illuminated, RCOC (Ea)
Case Sign, __Way, __inch by__inch, Non-Illuminated, Salv, RCOC (Ea)
Pay item specific to Oakland County signals projects. 
SP820EEGround Rod3/1/2025
Ground Rod, RCOC (Ea)Pay item specific to Oakland County signals projects.
SP820FDigital Traffic Signal Controller - Blue
3/1/2025
Controller, Digital Type, Delivered, Blue, RCOC (Ea) 
Controller - Centracs.  Pay item modified.
SP820FFHemispherical Video Detection3/1/2025
N/AUse with MDOT Special Provision for Hemispherical Video Detection (20SP-820N-01).  Presently not approved for use on RCOC maintained intersections.
SP820GDigital Traffic Signal Controller3/1/2025
Controller, Digital Type, Delivered, RCOC (Ea)
Controller, Digital Type, Delivered, SCATS, RCOC (Ea) 
Controller - Provides 2 options of controller manufacturers. 
SP820I Optical and GPS Priority System Control12/1/2025
GPS Priority Control System, RCOC (Ea)
GPS Priority Control System, Salv, RCOC (Ea)
Priority Control System, Rem, RCOC (Ea)
Pay item specific to City of Troy; City of Novi requires different special provision.. 
SP820J Pedestal, Alum  3/1/2025
Pedestal, Alum, RCOC (Ea)
Pedestal, Alum, Salv, RCOC (Ea) 
Pay item specific to Oakland County signals projects.  
SP820L Pushbutton Support Helix Foundation, Square Tube Adaptor and Post 3/1/2025 Pushbutton Support Helix Fdn and Post, RCOC (Ea)
Pushbutton Support Helix Fdn and Post, Salv, RCOC (Ea)
Pushbutton Support Helix Fdn and Post, Rem, RCOC (Ea)
Pay item specific to Oakland County signals projects. 
SP820MPushbutton Support Post 3/1/2025
Pushbutton Support Post, RCOC (Ea)
Pushbutton Support Post, Rem, RCOC (Ea) 
Pay item specific to Oakland County signals projects.  
SP820OIlluminated Street Name Sign - LED (Clearview Highway 2W Font) 3/1/2025
Street Name Sign, Illuminated, One Way, _ foot, RCOC (Ea)
Street Name Sign, Illuminated, Two Way, _ foot, RCOC (Ea)
Street Name Sign, Illuminated, Bracket Arm, RCOC (Ea)
Street Name Sign, Illuminated, Rem, RCOC (Ea)
Street Name Sign, Illuminated, Salv, RCOC (Ea) 
Do not use illuminated and non-illuminated special provisions on the same project. RCOC does not use illuminated and this special provision may require updating.
SP820OOOAntenna And Cellular Router - Delivered
12/1/2025
Antenna, Delivered, RCOC (Ea)
Cellular Router, 4/5G, Delivered, RCOC (Ea)
Pay item specific to Oakland County signals projects. Discuss use with TOC at field meeting.  Shall be used on all Permit projects and RCOC Federal Aid projects.
SP820PNon-Illuminated Street Name Sign 3/1/2025
Street Name Sign, Non-Illuminated, One Way, _ foot, RCOC (Ea)
 Street Name Sign, Non-Illuminated, Two Way, _ foot, RCOC (Ea)
 Street Name Sign, Non-Illuminated, Bracket Arm, RCOC (Ea)
 Street Name Sign, Non-Illuminated, Rem, RCOC (Ea)
 Street Name Sign, Non-Illuminated, Salv, RCOC (Ea)
Do not use illuminated and non-illuminated special provisions on the same project. 
SP820R Preformed Traffic Loop System3/1/2025
Traffic Loop, Presence (Preformed), RCOC (Ea) Used under concrete pavement only. 
SP820S Video Traffic Detection Camera - Remove 3/1/2025
Video Traf Detection Camera, Rem, RCOC (Ea)Removal only.  
SP820TMast Arm Mounted Sign and Bracket3/1/2025Mast Arm, Mtd, Sign Type _____, RCOC (Ea)Pay item specific to Oakland County signal projects.
SP820VVVTraffic Monitoring Camera - System Integration Support7/26/2025Camera, Traf Monitoring, System Integration Support, RCOC (Ea)
Pay item specific to Oakland County signal projects.  Use with RCOC SP820D.



FUSP FOR LOCAL LET ONLY (FOR INTERNAL USE ONLY)

FUSP
Code
TitleDate
Modified
Pay
Item
Notes
Bid Express InstructionsBid Express Instructions 
N/ADo not put in plans or proposal. It is for information only. 
Itemized Bid Sheet Instructions Instructions to Print Schedule of Items/Itemized Bid Sheet/Blank Bid Sheet N/ADo not put in plans for proposal. It is for information only.  
ChecklistChecklists and Proposal Book Order
N/AFor information only, does not go into proposal book. 
ADMIN1Contract Administration Requirements (Cover Pages)
N/AELECTRONIC ONLY. Use the same information as the paper book title page. All project identifying information is required to be the same on both title pages. This page includes a watermark. 
ADMIN2Advertisement Worksheet10/22/2025N/AFor Local Lettings only. 
ADMIN2aElectronic Bidding1/09/2025N/AUse on ALL Local Let projects ONLY. 
ADMIN2bBid Express Bid List Registration
N/AUse on ALL Local Let projects ONLY.
ADMIN5Completion of Designated and Specialty Items
N/AThis replaces the previously used "Subcontractor Requirements" specification. Use if you have subcontractor listed under the prequal lists.
ADMIN6Bid Guaranty
N/AUse on ALL Local Let projects ONLY. 
ADMIN7Payment and Performance Bonds4/27/2021N/AUse on ALL Local Let projects ONLY. 
ADMIN8Indemnification, Damage Liability, and Insurance  N/AUse on ALL Local Let projects ONLY. 
ADMIN9Taxes 4/27/2021N/AUse on ALL Local Let projects ONLY.
ADMIN10Law Compliance  4/27/2021N/AUse on ALL Local Let projects ONLY. 
ADMIN11Federal E-Verify Program  4/27/2021N/AUse on ALL Local Let projects ONLY. 
ADMIN12Non-Discrimination Clause  4/27/2021N/AUse on ALL Local Let projects ONLY. 
ADMIN13Protection of Wetland and Proper Disposal of Debris  4/27/2021N/AUse on ALL Local Let projects ONLY. 
SP100ALMDOT Standard Specifications for Construction  4/28/2021N/AUse on all road projects that originate from the Engineering Department.
SP100BLDivision One - General Provisions for Local Let Jobs N/AUse on all road projects that originate from the Engineering Department.
SP812AMinor Traffic Devices and Traffic Regulator Control During an Approved Extension of Time 2/5/2021N/AFor Local Lettings only. 
AddendumLocal Let Addendum N/AFor Local Letting only. 
20NB01LNotice to Bidders Contact Person  N/AFor Local Lettings only. 
NB1Project Coordination (LOCAL)11/24/2025N/AUpdate to include nearby projects. (FOR LOCAL USE ONLY)
Inquiry ResponseNotice to Bidders Inquiry Response  N/AFor Local Lettings only. 
Intentionally Blank PageBlank Page (Letter) N/AFor Local Lettings only. 
Intentionally Blank PageBlank Page (Ledger)  N/AFor Local Lettings only. 
2026 Local Letting Dates2026 Local Letting Dates - Planning Guide
N/AFor Local Lettings only. 
2026 Local Letting Dates SID Only 2026 Local Letting Dates SID Only  N/A For Local Lettings only


FUSP
Code
TitleDate
Modified
Pay
Item
Notes
20SAD_SP_IndexSpecial Provision Index07/22/2022 N/A
20SAD204A
Curb, Rem, Misc, SAD
11/22/2024Curb, Rem, Misc, SAD (Ft)

20SAD205ADitching, SAD 03/09/2022Ditching, SAD (Ft)
20SAD205BExcavation, Earth, SAD11/19/2024Excavation, Earth, SAD (Cyd)
20SAD205CSubgrade Undercutting, Type II, 21AA, SAD01/13/2021Subgrade Undercutting, Type II, 21AA, SAD (Cyd)
20SAD305AHMA Base Crushing and Shaping01/12/2021HMA Base Crushing and Shaping , SAD (Syd)
Material, Surplus and Unsuitable, Rem, LM (1to 50 Cyd), SAD (Cyd)
Material, Surplus and Unsuitable, Rem, LM (51 Cyd or Greater), SAD (Cyd)

20SAD401APipe Culverts and Storm Sewers01/04/2021

20SAD401BCulv, Csp Arch, Cl A, 13 Inch by 9 Inch, SAD
Culv, End Section, __ Inch by __ Inch, SAD
010/04/2021Culv, Csp Arch, Cl A, 13 Inch by 9 Inch, SAD (Ft)
Culv, End Section, __ Inch by __ Inch, SAD (Ea)

20SAD403ADrainage Structure Cover, Type __01/19/2021Dr Structure Cover, Type____, SAD (Ea)
20SAD403BDrainage Structure, Leaching Basin07/26/2022Dr Structure, Leaching Basin, 48 inch dia, SAD (Ea)
20SAD403CSprayed-in-Place Structure Rehabilitation Coating
01/10/2025Sprayed-in-Place Structure Rehabilitation Coating (Ft)

20SAD403D
Structure Cover Seal
08/01/2025Structure Cover Seal, SAD (EA)

20SAD501APavement Cleaning and Sweeping01/12/2021N/A
20SAD501BCement Treated Full Depth Reclamation of Asphalt Pavement01/27/2026Cement Treated Full Depth Reclamation, 12 inch, SAD (Syd)
Cement (Ton)
Removing Excess Pavement Materials, SAD (Syd)

20SAD501CLKD Pre-Treatment for Full Depth Reclamation07/25/2022LKD Pre-Treatment, 12 inch, SAD (Syd)
Lime Kiln Dust (Ton)

20SAD501D
Full Width HMA Pavement Construction
09/17/2025N/A
20SAD602AConcrete Base Course01/06/2021Conc Base Cse, Nonreinf, __ inch, SAD (Syd)
20SAD802AMountable Concrete Curb and Gutter01/06/2021Curb and Gutter, Conc, __ inch Mountable, SAD (Ft)
20SAD803ABrick Pavers09/17/2025Brick Paver, Rem, SAD (Sft)
Brick Paver, Furnished, SAD (Sft)
Brick Paver, Installed, SAD (Sft)

20SAD850BWater-Dust Control (1,000 Gal Units), SAD01/12/2021Water-Dust Control (1,000 gal units), SAD (Unit)
20SAD850CSprinkler Systems01/12/2021Sprinkler Head, Relocate, SAD (Ea)
20AD850DHot Applied Joint Sealant, SAD09/12/2025Hot Applied Joint Sealant, SAD (Ft)
Backer Rod, SAD (Ft)

20SADMOT Maintaining Traffic for Special Assessment Projects11/15/2024Maintaining Traffic, SAD (Ls)
20SADNB1Execution and Award of Contract04/06/2022N/A
20SADPCProgress Clause01/31/2025N/A