10 Mile Road/Pierce Avenue intersection (PERMIT PROJECT)
| Southfield Road and Greenfield Road
| Southfield
| Sanitary sewer installation
| No
| No
| Pamar Enterprises, Inc.
| 8/16
| COMPLETE | Permit Work & Short-Term Road Closures |
11 Mile Road | Just east of South Hill Road | Lyon Township | Culvert removal and replacement. | No. Flaggers will direct traffic during the work. | No | Fonson Company, Inc. | September, TBA | November, TBA | 11 Mile Culvert Replacement |
12 Mile Road | Orchard Lake Road to Farmington Road | Farmington Hills | Asphalt resurfacing, some concrete repairs , Americans with Disabilities Act-compliant crosswalks, repairs to curbs and gutters. Additionally, some side street approaches to 12 Mile Rd will be milled (grinding road surfaced) and paved with asphalt. | No; expect lane and some approach street closures. One lane of traffic will be maintained on 12 Mile Rd in each direction. Residential and business access maintained. | No | Ajax Paving | 8/23 | Early November | 12 Mile Road, Orchard Lake to Farmington Road |
12 Mile Road | Lahser Road to Evergreen Road | Southfield | Reconstruction of road including asphalt paving, traffic signal upgrades, adding right-turn lanes at several locations, Americans with Disabilities Act-compliant crosswalks, pathway construction and new curbs and gutters. | No. Two-way traffic maintained. | No | M.L. Chartier Excavating, Inc. | 5/24 | Late October | 12 Mile Road, Lahser to Evergreen |
*14 Mile Road (PERMIT PROJECT) | Eastbound 14 Mile Road from Rochester to Campbell Road | Royal Oak and Clawson | City of Royal Oak water main replacement. | No. Expect eastbound right (outside) lane closure for the work. | No | City of Royal Oak | 8/30 | 11/4 | Permit Work & Short-Term Road Closures |
14 Mile Road (PERMIT PROJECT) | West of Decker/Novi Road | Commerce Township, Novi and Walled Lake | Great Lakes Water Authority watermain replacement. | Yes. Westbound 14 Mile Rd is closed just west of Decker/Novi Rd. Eastbound 14 Mile Rd is open to traffic. | Westbound traffic detour is Pontiac Trail to Maple Rd to M-5, back to 14 Mile Rd. | Great Lakes Water Authority | 1/4 | Late Summer | Permit Work & Short-Term Road Closures |
Adams Road | Long Lake Road to Square Lake Road | Troy and Bloomfield Township | Resurfacing with asphalt; upgrade to Long Lake/Adams Rd traffic signal; new center, left-turn lanes at Vineyards Dr. and Westview Rd; Americans with Disabilities Act-compliant crosswalks; improved drainage; extension of some passing and right-turn lanes. | Yes, southbound Adams Rd is closed to through traffic. Northbound Adams Road remains open for local traffic only. | Southbound traffic detour is Adams Rd to Square Lake Rd to Coolidge Hwy to Long Lake Rd, back to Adams Rd. | Pro-Line Asphalt | 6/14 | Late October | Adams Road |
Barron Road | Grange Hall Road to just north of Groveland Road | Groveland Township | Paving 2.39 miles of gravel road with asphalt, improved drainage, concrete curbs and gutters. | Yes. Residential and business access maintained. | Grange Hall Rd to Jossman Rd to Groveland Rd, back to Barron Rd and vice versa. | Iafrate Construction | 4/12 | Early November | Barron Road |
Big Beaver Road (PERMIT PROJECT) | Just west of Dequindre Road (westbound lanes) | Troy | City of Troy watermain and sanitary sewer work. | No. Westbound Big Beaver Road will have lane closures just west of Dequindre Road (one lane will remain open for traffic during the work). | No | Pamar Enterprises | 4/19 | November, TBA | City of Troy Construction Updates |
*Big Lake Road (PERMIT PROJECT) | Andersonville Road to Ware Road | Springfield Township | Canadian National railroad crossing repairs. Additionally, Ware Road, south of Big Lake Road, will close (closure is south of residential area and just north of the road's dead end). | Yes. | Andersonville Rd to White Lake Rd to Ormond Rd, back to Big Lake Rd and vice versa. | Canadian National | TBA | TBA | Permit Work & Short-Term Road Closures |
*Cascade Street (PERMIT PROJECT) | Union Lake Road and Cooley Lake Road | Commerce Township | Construction of a traffic barrier on Cascade Street, just west of Union Lake Road. | Yes. | Union Lake Rd to Cooley Lake Rd, back to Cascade St and vice versa. | Mac Concrete Demolition | 9/13 | 9/20 | Permit Work & Short-Term Road Closures |
*Clarkston Road (part of the Independence Township road funding millage) | Sashabaw Road to Flemings Lake Road | Independence Township | Closure is under I-75 for concrete barrier and culvert work. Project includes resurfacing work. | Yes. Residential and business access maintained during the work. | Flemings Lake Rd to Walters Rd to Waldon Rd to Sashabaw Rd, back to Clarkston Rd and vice versa. | Cadillac Asphalt | 8/11 | 9/10 (road will reopen to traffic; resurfacing work will continue with flaggers directing traffic until approximately late September) | Independence Township Road Improvement Millage |
Concrete Slab Replacements | Various heavier traveled roads throughout Oakland County | Various | Remove and replace concrete. | No, expect lane closures and traffic delays. | No | Cipparrone Contracting | 4/9 | Fall, TBA | Concrete Slab Replacements |
Cranbrook Road
| 14 Mile Road to Maple Road
| Bloomfield Township and City of Birmingham
| Resurfacing 1.2 miles of road with asphalt, safety improvements, Americans with Disabilities Act-compliant sidewalk ramp improvements, traffic-signal upgrades, new curbs and gutters.
| No
| No
| Pro-Line Asphalt
| 6/14
| COMPLETE | Cranbrook Road |
Currie Road | 9 Mile Road to 10 Mile Road | Lyon Township | Gravel road paving (with asphalt) project that includes improved drainage, intersection improvements at Currie/10 Mile Road and new curbs and gutters. | Yes | 10 Mile Rd to Napier Rd to 9 Mile Rd, back to Currie Rd and vice versa. | Iafrate Construction | 4/12 | Mid-September | Currie Road |
Davisburg/ Broadway Road (PERMIT PROJECT) | Dilley Road to Eaton Road | Springfield Township | Canadian National railroad crossing repairs. | Yes, residential and business access maintained. | Dixie Hwy to White Lake Rd to Andersonville Rd, back to Davisburg/Broadway and vice versa. | Canadian National | 9/7 | 9/10 | Permit Work & Short-Term Road Closures |
Dilley Road (PERMIT PROJECT) | Just south of Davisburg Road | Springfield Township | Canadian National railroad crossing repairs | Yes, residential and business access maintained. | Davisburg (Broadway) Rd to Andersonville Rd to Clark Rd, back to Dilley Rd and vice versa. | Canadian National | 9/3 | 9/7 | Permit Work & Short-Term Road Closures |
*Frembes Road | Dixie Highway and Hatchery Road | Waterford Township | Canadian National railroad crossing repairs. | Yes. | Hatchery Rd to Dixie Hwy, back to Frembes Rd and vice versa. | Canadian National | 9/17 | 9/24 | Permit Projects & Short-Term Road Closures |
*Greenfield Road (PERMIT PROJECT) | 13 Mile Road to 14 Mile Road | Beverly Hills and Royal Oak | Consumers Energy gas main replacement work. | Yes, the road is closed to through traffic. Northbound Greenfield Road is open to local traffic only. Residential and business access maintained. | 13 Mile Rd to Southfield Rd to 14 Mile Rd, back to Greenfield Rd and vice versa. | Consumers Energy | 5/10 | Late September | Permit Work & Short-Term Road Closures |
*Livernois Road (PERMIT PROJECT) | Just south of Auburn Road | Rochester Hills | Pipeline maintenance under the road. | Yes. | Auburn Rd to Crooks Rd to South Blvd., back to Livernois Rd and vice versa. | Sunoco Pipeline, LLC | 9/20 | 10/7 | Permit Work & Short-Term Road Closures |
Long Lake Road | Northfield Parkway to the I-75 overpass | Troy | Remove and replace concrete. | No, expect lane closures. | No | Cipparrone Contracting | 8/9 | Mid-September | Concrete Slab Replacements |
Maple Road | Franklin Road to Inkster Road | Bloomfield Township | Resurfacing, improved drainage, new traffic signals, addition of a center left-turn lane (from Inkster to east of Norham Rd), new curbs/gutters, culvert replacement east of Norham Rd and pathway construction on north side of Maple Rd. | Yes, residential and business access maintained. | Inkster Rd to Walnut Lake Rd to Franklin Rd, back to Maple Rd and vice versa. | Dan's Excavating | 4/8 | Mid-September | Maple Road |
Maple Road (PERMIT PROJECT) | Middlebelt Road to Orchard Lake Road | West Bloomfield Township | Consumers Energy pipeline work. | No, there are lane and road-shoulder closures. Additionally, flaggers will direct traffic when necessary. | No | Michels Corporation | 4/15 | Mid-September | Consumers Energy |
Middlebelt Road (PERMIT PROJECT) | 13 Mile Road to Maple Road | Farmington Hills and West Bloomfield Township | Consumers Energy pipeline work. | No, there are lane and road-shoulder closures. Additionally, flaggers will direct traffic when necessary. | No | Michels Corporation | 4/15 | Mid-September | Consumers Energy |
*Milford Road Culvert Replacement | Just east of Water Road over Buckhorn Creek | Rose Township | Remove and replace a culvert under the road. Work also includes asphalt paving, new storm sewers, replacement of guardrails and installation of curbs and gutters. | Yes. | Fenton Rd to Hickory Ridge Rd to Middle Rd, back to Milford Rd and vice versa. | Superior Company, Inc. | 9/13 | Mid-November | Milford Road Culvert |
Orchard Lake Road (northbound) | Long Lake Road to Indian Trail | West Bloomfield Township | Guardrail replacement | Yes, just northbound Orchard Lake Rd. Daily closures from 8:30 am to 4:30 pm. Southbound Orchard Lake Rd will remain open to traffic. | For northbound Orchard Lake Rd traffic detour is Long Lake Rd to Middlebelt Rd, back to Orchard Lake Rd. | RCOC | 7/8 | TBA | Permit Work & Short-Term Road Closures |
Preservation Overlays (Simple Resurfacing) | Various heavier traveled roads throughout Oakland County | Various | Simple resurfacing with placing 2-2.5 inches of asphalt on the road surface; work is weather-dependent. | No, expect traffic delays. | No | Cadillac Asphalt and Ace-Saginaw Paving | 5/11 | Fall, TBA | 2021 Project List |
*Sashabaw Road and Oakhill Road Roundabout | Sashabaw Road and Oakhill Road intersection | Brandon and Independence townships | Construction of a compact roundabout, reconstruction of one-third mile of roadway with asphalt, improved drainage, Americans with Disabilities Act-compliant crosswalks, lighting and new curbs and gutters. | Yes, closure expected to start on Sept. 7. | Sashabaw Rd detour: Seymour Lake Rd to Baldwin Rd to Clarkston Rd, back to Sashabaw. Oakhill Rd detour: Perry Lake Rd to Seymour Lake Rd to Dartmouth Rd back to Oakhill Rd | Iafrate Construction | 9/7 (intersection closure) | Mid-November | Oakhill/Sashabaw Road Compact Roundabout |
Subdivision Roads (Special Assessment District) | Various subdivision roads in Oakland County townships | Various townships | Reconstruction and resurfacing roads with asphalt. | No | No | Various | Various start dates | Late fall | Special Assessment District (SAD) Projects |
Walton Blvd. | Dixie Hwy to east of Sashabaw Road | Waterford Township | Reconstruction of road including asphalt paving, upgrading traffic signal, Americans with Disabilities Act-compliant crosswalks and new curbs. | No; two-way traffic maintained during construction. | No | Pro-Line Asphalt | 4/19 | Mid-September (traffic signal work will continue after fully opening the road to traffic) | Walton Blvd. |
White Lake Road (part of the Independence Township road funding millage) | Andersonville Road to the Clarkston Village limits | Independence Township | Preliminary work on road shoulders and structures to prepare for paving. Paving expected in September, date TBA. | No | No | Cadillac Asphalt | 8/18 (preliminary work on road shoulders and structures) | TBA | Independence Township Road Improvement Millage |