The following projects may cause traffic delays on Road Commission for Oakland County (RCOC) roads between June 17 and June 24 or may start shortly thereafter. 

It is RCOC’s goal to conduct road improvement projects in a way that interferes with traffic as little as possible. This list includes both Road Commission projects and projects conducted by others, under permit, on roads under the jurisdiction of the Road Commission.

Please note: This information is subject to change. Projects can change from day to day, and traffic delays can develop in a matter of minutes due to weather, emergency situations, etc.

The project list is attached.                                         

Additional information about current and upcoming projects can also be viewed on the RCOC website:   RCOC 2022 Road Construction  (http://www.rcocweb.org/189/Road-Projects).           

2022 RCOC Road Construction and Permit Projects (6/17/22 update)

ROAD

PROJECT LIMITS

COMMUNITY

PROJECT DESCRIPTION

CLOSURE

DETOUR

CONTRACTOR

PROJECT START

ESTIMATED COMPLETION

PROJECT INFORMATION

Avon Road

John R Road to 23 Mile Road; including the Avon/Dequindre Road intersection

Rochester Hills and Shelby Township

Bridge reconstruction. The project also includes the construction of a roundabout at the Dequindre/Avon Road intersection (expected to start summer of 2022).

Yes, residential, park and business access are maintained.

John R Rd to Hamlin Rd to Ryan Rd to 23 Mile Rd, back to Avon/Dequindre Rd.

Z Contractors

11/1/21

August of 2022 (bridge and roundabout at Avon/Dequindre Road to reopen to traffic)

Avon Road, Dequindre to 23 Mile Road

Dequindre Road (part of the Avon Road project)

Dequindre Road from Hamlin Road to 23 Mile Road

Rochester Hills

Avon Road bridge is currently under construction. The Avon/Dequindre Road intersection is closed for roundabout construction.

Yes, access to businesses and residential properties maintained.

Hamlin Rd to Ryan Rd to 23 Mile Rd, back to Dequindre Rd and vice versa.

Z Contractors

11/1/21

August of 2022

Dequindre Road (part of the Avon Road construction project)

Bald Mountain Road (PERMIT PROJECT)

Dutton Road to Roxbury Drive (south of Silverbell Road)

Orion Township

Emergency road closure for planned work on a Consumers Energy high-pressure gas transmission line. The transmission line is just below the road's surface and will be lowered at a future date. This section of the road is closed for safety.

Yes.

Dutton Rd to Squirrel Rd to Silverbell Rd, back to Bald Mountain Rd and vice versa.

Consumers Energy

4/19

11/3

Consumers Energy

Club Drive (PERMIT PROJECT)

Club Drive at Porters Lane (west of Franklin Road)

Bloomfield Township

Installation of a bypass pump and sanitary sewer.

Yes.

Square Lake Rd to Telegraph Rd to Franklin Rd, back to Club Drive and vice versa.

FDM Contracting on behalf of Bloomfield Twp.

5/9

9/2

Permit Work & Short-Term Road Closures

Concrete Repairs

Various heavier traveled roads in Oakland County

Various

Concrete removal and replacement.

No, expect lane closures.

No

Cipparrone Contracting, Inc.

4/11

Fall, TBA

Concrete Repairs

Currie Road

Eight Mile Road to just north of Nine Mile Road

Lyon Township and Salem Township

Gravel road paving with asphalt, drainage improvements, concrete curbs and gutters. The project also includes roundabout construction at 8 Mile/Currie Rd and 9 Mile/Currie Rd intersections.

Yes, Currie Road is closed. Access to homes maintained. Residents will need to access Currie Road from 9 Mile Road (due to roundabout construction at Eight Mile/Currie Rd intersection).

Currie Road detour is Seven Mile Rd to Napier Road to Ten Mile Rd, back to Currie Rd and vice versa.

Angelo Iafrate

4/18

Mid-October

Currie Road

*Currie Road/Eight Mile Road Intersection (Part of the Currie Road project)

Currie Road/Eight Mile Road intersection

Lyon Township and Salem Township

Construction of a single-lane roundabout at the Currie Road/Eight Mile Road intersection.

Yes, the intersection is closed for roundabout construction.

Griswold Rd to Ten Mile Rd to Napier Rd, back to Eight Mile Rd and vice versa.

Angelo Iafrate

4/18

Mid-July (roundabout opening delayed due to a utility conflict)

Currie Road

*Fourteen Mile Road (PERMIT PROJECT)

Decker/Novi Road to Walled Lake Road

Novi and Walled Lake

Great Lakes Water Authority watermain replacement.

Yes.

Walled Lake Dr to Pontiac Trl to Maple Rd to Welch Rd, back to Fourteen Mile Rd and vice versa.

Great Lakes Water Authority

3/21

Late June

Great Lakes Water Authority

Grand River Avenue

Novi Road to Wixom Road

Novi and Wixom

Concrete slab replacement.

No, expect lane closures.

No

Cipparrone Construction

5/20

Mid-July (additional work pending)

Concrete Repairs

Hatchery Road

Dixie Highway to Airport Road (the work is just west of Frembes Road)

Waterford Township

Bridge replacement over the Clinton River, culvert replacement west of the bridge, demolition of the wooden pedestrian bridge (new bridge will facilitate pedestrians) and new guardrails.

The road is closed over the Clinton River. Residential access maintained east and west of the bridge.

Dixie Hwy to Williams Lake Rd to Airport Rd, back to Hatchery Rd and vice versa.

Toebe Construction

6/13

Late fall

Hatchery Road Bridge Replacement over the Clinton River

*Joint Repairs

Various heavier traveled roads.

Commerce Township, Highland Township, Novi, Troy and Wixom

Milling (grinding pavement) road joints and paving with asphalt.

No. During the work, the roads will remain open, with flaggers directing traffic.

No

Cadillac Asphalt

6/16 (starting with Sleeth Road, Commerce Road to Benstein Road)

TBA

Joint Repairs

Mann Road

Floretta Street to Clintonville Road

Independence Township and Waterford Township border

Culvert removal and replacement. The project also includes asphalt resurfacing over the culvert, minor drainage improvements and new guardrail.

Yes, the road will close over Sashabaw Creek, between Clintonville Rd and Floretta St.

Rattek Dr to Genoa Rd to Pine Knob Ln to Maybee Rd to Clintonville Rd, back to Mann Rd and vice versa.

Fessler and Bowman Inc.

August, TBA

TBA

Mann Road Culvert Replacement

Maple Road

Coolidge Highway to Dequindre Road

Clawson and Troy

Road resurfacing work that includes concrete repairs, Americans with Disabilities Act-compliant sidewalk ramps and repairs to curbs and gutters.

No, expect lane closures during the work.

No

Cadillac Asphalt

6/20

Late summer

Maple Road, Coolidge Hwy. to Dequindre Road

Maybee Road

Rohr Road to Baldwin Road

Orion Township

Installation of culverts under Maybee Road to improve drainage. Work also includes surface repairs to prepare for simple resurfacing work that will be done during the summer (date TBA).

 

 

 

Yes, the closure is between Rohr and Tall Oaks roads. Home and business access will be maintained during the work.

Maybee Rd to Rohr Rd to Gregory Rd to Baldwin Rd, back to Maybee Rd and vice versa.

RCOC Highway Maintenance

TBA

TBA

Permit Work & Short-Term Road Closures

Maybee Road (part of the Independence Township Road Improvement Millage)

Dixie Highway to Clintonville Road

Independence Township

Resurfacing work.

The road will remain open; however, traffic will be unable to turn onto EB Maybee Rd from Dixie Hwy during the work. WB Maybee Rd traffic will be able to access Dixie Hwy. Expect lane closures with flaggers directing traffic.

No

Cadillac Asphalt

6/13

Late July

Independence Township Road Improvements

Maybee Road (part of the Independence Township Road Improvement Millage)

Clintonville Road to Capaldi Drive

Independence Township

Road repaving. Work includes paving some side-street/driveway approaches, repairs to curbs/gutters and upgrades to pedestrian crosswalks to comply with the Americans with Disabilities Act.

Yes, the road is closed. Residential and business access maintained.

Baldwin Rd to Clarkston Rd to Clintonville Rd, back to Maybee Rd and vice versa.

Cadillac Asphalt

5/4

Late June

Independence Township Road Improvements

Nine Mile Road (PERMIT PROJECT)

Griswold Road to Briar Meadow Road (west of Currie Road)

Lyon Township

Approximately a half-mile of gravel road paving and hill cut to improve safety. Work is being done in conjunction with private development.

Yes, Nine Mile Road is closed east of Griswold to just west of Currie Road. Residential and business access are maintained.

Griswold Rd to Ten Mile Rd to Currie Rd, back to Nine Mile Rd and vice versa.

Pulte Homes

4/14

7/29

Permit Work & Short-Term Road Closures

Orchard Lake Road

13 Mile Road to 14 Mile Road

Farmington Hills

Resurfacing /reconstruction project that includes asphalt paving, concrete replacement, roundabout construction at the Orchard Lake Plaza entrance and a four-lane boulevard from Hunters Lane to 14 Mile Rd.

Yes, northbound Orchard Lake Rd is closed. Southbound Orchard Lake Rd to remain open with business access maintained.

Northbound Orchard Lake Rd traffic detour is 13 Mile Rd to Northwestern Hwy back to Orchard Lake Rd.

M.L. Chartier

3/21

Late November

Orchard Lake Road, 13 Mile to 14 Mile Road

*Orchard Lake Road

Middlebelt Road to Old Telegraph Road

Sylvan Lake, West Bloomfield Township, Bloomfield Township and Pontiac

Road resurfacing work including asphalt paving, concrete slab replacements, Americans with Disabilities Act-compliant crosswalks, traffic signal upgrades, drainage improvements and widening east of Middlebelt Rd to accommodate a center left-turn lane.

No, one lane will remain open in each direction.

No

Florence Cement

6/27

Late September

Orchard Lake Road, Middlebelt to Old Telegraph Road

Orchard Lake Road over the Rouge River

10 Mile Road to 11 Mile Road (northbound)

Farmington Hills

Culvert removal and replacement. Additionally, a second culvert will be rehabilitated during the work.

Northbound Orchard Lake Rd will close between 10 Mile and 11 Mile roads. Southbound Orchard Lake Rd will remain open. Access to homes and businesses maintained.

Northbound Orchard Lake Rd detour is 10 Mile Rd to Middlebelt Rd to 11 Mile Rd and back to Orchard Lake Rd.

V.I.L. Construction

7/5 (expected)

September, TBA

Orchard Lake Road Culvert over the Rouge River

*Pontiac Trail

Haggerty Road to Green Lake Road

West Bloomfield Township

Removal of existing pavement, asphalt paving, center left-turn lane extension from Green Lake Rd to Parkridge Dr, improved merging of the right lane of EB Pontiac Trl east of Haggerty Rd, and Americans with Disabilities Act-compliant crosswalks.

 

 

Yes, Pontiac Trail is closed to through traffic. Residential and business access is maintained.

Haggerty Rd to Maple Rd to Drake Rd to Walnut Lake Rd to Halsted Rd, back to Pontiac Trl and vice versa.

DiPonio Construction

4/18

Late July 

Pontiac Trail

Pontiac Trail/Green Lake Road intersection (part of the Pontiac Trail project)

Pontiac Trail and Green Lake Road intersection

West Bloomfield Township

Intersection paving and extension of the SB Green Lake Rd right-turn lane to Pontiac Trl.

Yes, the intersection will close for approximately one month.

Green Lake Rd to Richardson Rd to Haggerty Rd to Maple Rd to Drake Rd to Walnut Lk Rd to Halsted Rd to Pontiac Trl and vice versa.

DiPonio Construction

6/20

7/19

Pontiac Trail

Preservation Overlays (Simple Resurfacing)

Various heavier traveled roads throughout Oakland County

Various

Simple resurfacing with placing 2-2.5 inches of asphalt on the road surface; work is weather-dependent.

No, expect traffic delays.

No

Cadillac Asphalt and Ace-Saginaw Paving

4/18

Late summer

2022 Project List

Spot Resurfacing

Various heavier traveled roads in Oakland County

Various

Milling (grinding) of pavement on smaller sections of roads and paving with asphalt. Paving work is weather-dependent.

No, work is done with flaggers directing traffic.

No.

Florence Cement and Pro-Line Asphalt

4/18

Late summer

Spot Resurfacing

Twelve Mile Road (PERMIT PROJECT)

Lahser Road to Evergreen Road at Bermuda Lane

Southfield

Watermain repairs and pavement restoration.

No. Expect lane closures at Bermuda Lane for road surface repairs.

No.

Everstream

4/1

Early July

Permit Work & Short-Term Road Closures

*Union Lake Road Culvert Replacement

Commerce Road to Wise Road

Commerce Township

Removal and replacement of a culvert under the road. Work includes asphalt paving, storm sewer installation, new guardrails and signage.

Yes, business access maintained north and south of the culvert.

Wise Rd to Carroll Lake Rd to Commerce Rd, back to Union Lake Rd and vice versa.

V.I.L. Construction

Lane closure to start on 6/20; full closure expected to start on 7/28.

Late September

Union Lake Road Culvert Replacement