Adams Road | Long Lake Road to Square Lake Road | Troy and Bloomfield Township | Resurfacing with asphalt; upgrade to Long Lake/Adams Rd traffic signal; new center, left-turn lanes at Vineyards Dr. and Westview Rd; Americans with Disabilities Act-compliant crosswalks; improved drainage; extension of some passing and right-turn lanes. | Yes, southbound Adams Rd is closed. Northbound Adams Road remains open. | Southbound traffic detour is Adams Rd to Square Lake Rd to Coolidge Hwy to Long Lake Rd, back to Adams Rd. | Pro-Line Asphalt | 4/4 | Late June | Adams Road |
Avon Road | John R Road to 23 Mile Road; including the Avon/Dequindre Road intersection | Rochester Hills and Shelby Township | Bridge reconstruction. Project also includes the construction of a roundabout at the Dequindre/Avon Road intersection (expected to start summer of 2022). | Yes, residential, park and business access are maintained. | John R Rd to Hamlin Rd to Ryan Rd to 23 Mile Rd, back to Avon/Dequindre Rd. | Z Contractors | 11/1/21 | August of 2022 (bridge and roundabout at Avon/Dequindre Road to reopen to traffic) | Avon Road, Dequindre to 23 Mile Road |
Dequindre Road (part of the Avon Road project) | Dequindre Road from Hamlin Road to 23 Mile Road | Rochester Hills | Avon Road bridge is currently under construction. The Avon/Dequindre Road intersection is closed for roundabout construction. | Yes, access to businesses and residential properties is maintained. | Hamlin Rd to Ryan Rd to 23 Mile Rd, back to Dequindre Rd and vice versa. | Z Contractors | 11/1/21 | August of 2022 | Dequindre Road (part of the Avon Road construction project) |
Bald Mountain Road (PERMIT PROJECT) | Dutton Road to Roxbury Drive (south of Silverbell Road) | Orion Township | Emergency road closure for planned work on a Consumers Energy high-pressure gas transmission line. The transmission line is just below the road's surface and will be lowered at a future date. This section of the road is closed for safety. | Yes. | Suggested detour is Dutton Rd to Squirrel Rd to Silverbell Rd, back to Bald Mountain Rd and vice versa. | Consumers Energy | 4/19 | Late fall | Consumers Energy |
Cass Lake Road (PERMIT PROJECT)
| Just south of Cass Elizabeth Road over the Cass Lake/Otter Lake Canal (between Port Cove Drive and Bangor Road)
| Waterford Township
| Watermain relocation work to prepare for a culvert project that will start in August.
| Yes, the road is closed. Residential access is maintained north and south of the watermain work.
| Cass Elizabeth Rd to Cooley Lake Rd to Hiller Rd to Commerce Rd to Orchard Lake Rd, back to Cass Lake Rd and vice versa.
| Waterford Township
| 4/25
| COMPLETE Road to close again approximately 8/1 for culvert work | Cass Lake Road Culvert Replacement |
Club Drive (PERMIT PROJECT) | Club Drive at Porters Lane (west of Franklin Road) | Bloomfield Township | Installation of a bypass pump and sanitary sewer. | Yes. | Square Lake Rd to Telegraph Rd to Franklin Rd, back to Club Drive and vice versa. | FDM Contracting on behalf of Bloomfield Twp. | 5/9 | 9/2 | Permit Work & Short-Term Road Closures |
Concrete Repairs | Various heavier traveled roads in Oakland County | Various | Concrete removal and replacement. | No, expect lane closures. | No | Cipparrone Contracting, Inc. | 4/11 | Fall, TBA | Concrete Repairs |
Currie Road | Eight Mile Road to just north of Nine Mile Road | Lyon Township and Salem Township | Gravel road paving with asphalt, drainage improvements, concrete curbs and gutters. The project also includes roundabout construction at 8 Mile/Currie Rd and 9 Mile/Currie Rd intersections. | Yes, Currie Road is closed. Access to homes maintained. Residents will need to access Currie Road from 9 Mile Road (due to roundabout construction at Eight Mile/Currie Rd intersection). | Currie Road detour is Seven Mile Rd to Napier Road to Ten Mile Rd, back to Currie Rd and vice versa. | Angelo Iafrate | 4/18 | Mid-October | Currie Road |
Currie Road/Eight Mile Road Intersection (Part of the Currie Road project) | Currie Road/Eight Mile Road intersection | Lyon Township and Salem Township | Construction of a single-lane roundabout at the Currie Road/Eight Mile Road intersection. | Yes, the intersection is closed for roundabout construction. | Griswold Rd to Ten Mile Rd to Napier Rd, back to Eight Mile Rd and vice versa. | Angelo Iafrate | 4/18 | Late June (roundabout construction) | Currie Road |
Fourteen Mile Road (PERMIT PROJECT) | Decker/Novi Road to Walled Lake Road | Novi and Walled Lake | Great Lakes Water Authority watermain replacement. | Yes. | Walled Lake Dr to Pontiac Trl to Maple Rd to Welch Rd, back to Fourteen Mile Rd and vice versa. | Great Lakes Water Authority | 3/21 | Mid-June | Permit Work & Short-Term Road Closures |
*Hatchery Road | Dixie Highway to Airport Road (the work is just west of Frembes Road) | Waterford Township | Bridge replacement over the Clinton River, culvert replacement west of the bridge, demolition of the wooden pedestrian bridge (new bridge will facilitate pedestrians), new guardrails, and traffic signal upgrade at Airport/Hatchery intersection. | Yes, residential access is maintained east and west of the bridge. | Dixie Hwy to Williams Lake Rd to Airport Rd, back to Hatchery Rd and vice versa. | Toebe Construction | June, TBA | TBA | Hatchery Road Bridge Replacement over the Clinton River |
Holcomb Road (part of the Independence Township Road Improvement Millage) | Ellis Road to the Clarkston Village limits | Independence Township | Road resurfacing project. | No, flaggers will direct traffic during the work. | No | Cadillac Asphalt | 4/11 | Late May | Independence Township Road Improvements |
*Maple Road | Coolidge Highway to Rochester Road | Clawson and Troy | Road resurfacing work that includes concrete repairs, Americans with Disabilities Act-compliant sidewalk ramps and repairs to curbs and gutters. | No, expect lane closures during the work. | No | Cadillac Asphalt | Late May, TBA | TBA | Maple Road, Coolidge Hwy. to Rochester Road |
Maybee Road | Rohr Road to Baldwin Road | Orion Township | Installation of culverts under Maybee Road to improve drainage. Work also includes surface repairs to prepare for simple resurfacing work that will be done during the summer (date TBA). | Yes, the closure is between Rohr and Tall Oaks roads. Home and business access will be maintained during the work. | Maybee Rd to Rohr Rd to Gregory Rd to Baldwin Rd, back to Maybee Rd and vice versa. | RCOC Highway Maintenance | TBA | TBA | Permit Work & Short-Term Road Closures |
Maybee Road (part of the Independence Township Road Improvement Millage) | Clintonville Road to Capaldi Drive | Independence Township | Road repaving. Work includes paving some side-street/driveway approaches, repairs to curbs/gutters and upgrades to pedestrian crosswalks to comply with the Americans with Disabilities Act. | Yes, the road is closed. Residential and business access maintained. | Baldwin Rd to Clarkston Rd to Clintonville Rd, back to Maybee Rd and vice versa. | Cadillac Asphalt | 5/4 | Late June | Independence Township Road Improvements |
Nine Mile Road (PERMIT PROJECT) | Griswold Road to Briar Meadow Road (west of Currie Road) | Lyon Township | Approximately a half-mile of gravel road paving and hill cut to improve safety. Work is being done in conjunction with private development. | Yes, Nine Mile Road is closed east of Griswold to just west of Currie Road. Residential and business access are maintained. | Griswold Rd to Ten Mile Rd to Currie Rd, back to Nine Mile Rd and vice versa. | Pulte Homes | 4/14 | 7/29 | Permit Work & Short-Term Road Closures |
*Orchard Lake Road | Middlebelt Road to Old Telegraph Road | Sylvan Lake, West Bloomfield Township, Bloomfield Township and Pontiac | Road resurfacing work including asphalt paving, concrete slab replacements, Americans with Disabilities Act-compliant crosswalks, traffic signal upgrades, drainage improvements and widening east of Middlebelt Rd to accommodate a continuous center left-turn lane. | No; one lane will remain open in each direction. | No | Florence Cement | 6/20 | Late September | Orchard Lake Road, Middlebelt to Old Telegraph Road |
Orchard Lake Road | 13 Mile Road to 14 Mile Road | Farmington Hills | Resurfacing /reconstruction project that includes asphalt paving, concrete replacement, roundabout construction at the Orchard Lake Plaza entrance and a four-lane boulevard from Hunters Lane to 14 Mile Rd. | Yes, northbound Orchard Lake Rd is closed. Southbound Orchard Lake Rd to remain open with business access maintained. | Northbound Orchard Lake Rd traffic detour is 13 Mile Rd to Northwestern Hwy back to Orchard Lake Rd. | M.L. Chartier | 3/21 | Late November | Orchard Lake Road, 13 Mile to 14 Mile Road |
Pontiac Trail | Haggerty Road to Green Lake Road | West Bloomfield Township | Removal of existing pavement, asphalt paving, center left-turn lane extension from Green Lake Rd to Parkridge Dr, improved merging of the right lane of EB Pontiac Trl east of Haggerty Rd, and Americans with Disabilities Act-compliant crosswalks. | Yes, Pontiac Trail is closed to through traffic. Residential and business access is maintained. | Haggerty Rd to Maple Rd to Drake Rd to Walnut Lake Rd to Halsted Rd, back to Pontiac Trl and vice versa. | DiPonio Construction | 4/18 | Late summer | Pontiac Trail |
Pontiac Trail/Green Lake Road intersection (part of the Pontiac Trail project) | Pontiac Trail and Green Lake Road intersection | West Bloomfield Township | Intersection paving and extension of the SB Green Lake Rd right-turn lane to Pontiac Trl. | Yes, the intersection will close for approximately one month. | Green Lake Rd to Richardson Rd to Haggerty Rd to Maple Rd to Drake Rd to Walnut Lk Rd to Halsted Rd to Pontiac Trl and vice versa. | DiPonio Construction | June, TBA | TBA | Pontiac Trail |
Preservation Overlays (Simple Resurfacing) | Various heavier traveled roads throughout Oakland County | Various | Simple resurfacing with placing 2-2.5 inches of asphalt on the road surface; work is weather-dependent. | No, expect traffic delays. | No | Cadillac Asphalt and Ace-Saginaw Paving | 4/18 | Late summer | 2022 Project List |
Spot Resurfacing | Various heavier traveled roads in Oakland County | Various | Milling (grinding) of pavement on smaller sections of roads and paving with asphalt. Paving work is weather-dependent. | No, work is done with flaggers directing traffic. | No. | Florence Cement and Pro-Line Asphalt | 4/18 | Late summer | Spot Resurfacing |
Twelve Mile Road (PERMIT PROJECT) | Lahser Road to Evergreen Road at Bermuda Lane | Southfield | Watermain repairs and pavement restoration. | No. Currently, there are lane closures. WB 12 Mile Rd traffic is shifted to the center left-turn lane at Bermuda Lane. EB 12 Mile Rd remains open. | No, just lane closures. | Everstream | 4/1 | TBA | Permit Work & Short-Term Road Closures |
Union Lake Road Culvert Replacement | Commerce Road to Wise Road | Commerce Township | Removal and replacement of a culvert under the road. Work includes asphalt paving, storm sewer installation, new guardrails and signage. | Yes, business access maintained north and south of the culvert. | Wise Rd to Carroll Lake Rd to Commerce Rd, back to Union Lake Rd and vice versa. | V.I.L. Construction | TBA | TBA | Union Lake Road Culvert Replacement |