11 Mile Road Culvert Replacement | Just east of South Hill Road | Lyon Township | Culvert removal and replacement. | No. Flaggers will direct traffic during the work. | No | Fonson Company, Inc. | 10/4 | 11/10 | 11 Mile Culvert Replacement |
12 Mile Road | Lahser Road to Evergreen Road | Southfield | Reconstruction of road including asphalt paving, traffic signal upgrades, adding right-turn lanes at several locations, Americans with Disabilities Act-compliant crosswalks, pathway construction and new curbs and gutters. | No. Two-way traffic maintained. | No | M.L. Chartier Excavating, Inc. | 5/24 | Late November | 12 Mile Road, Lahser to Evergreen |
14 Mile Road (PERMIT PROJECT) | Decker/Novi Road to Walled Lake Road | Commerce Township, Novi and Walled Lake | Great Lakes Water Authority watermain replacement. | Yes. | Decker Rd to Maple Rd to East Walled Lake Dr, back to 14 Mile Rd and vice versa. | Great Lakes Water Authority | 1/4 | Late December | Permit Work & Short-Term Road Closures |
*14 Mile Road (PERMIT PROJECT) | Eastbound 14 Mile Road from Rochester to Campbell Road | Royal Oak and Clawson | City of Royal Oak water main replacement. | No. Expect eastbound right (outside) lane closure for the work. | No | City of Royal Oak | 8/30 | 11/12 | Permit Work & Short-Term Road Closures |
Adams Road | Long Lake Road to Square Lake Road | Troy and Bloomfield Township | Resurfacing with asphalt; upgrade to Long Lake/Adams Rd traffic signal; new center, left-turn lanes at Vineyards Dr. and Westview Rd; Americans with Disabilities Act-compliant crosswalks; improved drainage; extension of some passing and right-turn lanes. | No, currently open to traffic. Work will resume in the spring of 2022. | No | Pro-Line Asphalt | 6/14 | OPEN TO TRAFFIC Project will resume in the spring of 2022. | Adams Road |
Avon Road | John R Road to 23 Mile Road; including the Avon/Dequindre Road intersection | Rochester Hills and Shelby Township | Bridge removal and replacement expected to start Nov. 1. Project also includes the construction of a roundabout at the Dequindre/Avon Road intersection (expected to start summer of 2022). | Yes; residential, park and business access maintained. | John Rd to Hamlin Rd to Ryan Rd to 23 Mile Rd, back to Avon/Dequindre Rd. | Z Contractors | 11/1 | August of 2022 (bridge and roundabout at Avon/Dequindre Road to reopen to traffic) | Avon Road, Dequindre to 23 Mile Road |
Barron Road
| Grange Hall Road to just north of Groveland Road
| Groveland Township
| Paving 2.39 miles of gravel road with asphalt, improved drainage, concrete curbs and gutters.
| No
| No
| Iafrate Construction
| 4/12
| COMPLETE | Barron Road |
Big Beaver Road (PERMIT PROJECT) | Just west of Dequindre Road (westbound lanes) | Troy | City of Troy watermain and sanitary sewer work. | No. Westbound Big Beaver Road will have lane closures just west of Dequindre Road (one lane will remain open for traffic during the work). | No | Pamar Enterprises | 4/19 | November, TBA | City of Troy Construction Updates |
Brown Road | West of Giddings Road to M-24 (Lapeer Road) | Orion Township | Concrete repairs | No, expect lane closures | No | Cipparrone Contracting | 10/18 | Late November | Concrete Replacement |
Dequindre Road (part of the Avon Road project) | Dequindre Road from Hamlin Road to 23 Mile Road | Rochester Hills | Closure for the Avon Road bridge demolition and construction of a roundabout at the Dequindre Road/Avon Road intersection. | Yes, access to businesses and residential properties maintained. | Hamlin Rd to Ryan Rd to 23 Mile Rd, back to Dequindre Rd and vice versa. | Z Contractors | 11/1 | August of 2022 | Dequindre Road (part of the Avon Road construction project) |
*Maybee Road | Dixie Highway to Sashabaw Road (culvert is located just west of Waterford Road) | Independence Township | Culvert removal and replacement | Yes, access to business and residential property maintained | Sashabaw Rd to Waldon Rd to M-15 to Dixie Hwy, back to Maybee Rd and vice versa. | Superior Company, Inc. | 11/10 | 11/12 | Permit Work & Short-Term Road Closures |
Milford Road Culvert Replacement | Just east of Water Road over Buckhorn Creek | Rose Township | Remove and replace a culvert under the road. Work also includes asphalt paving, new storm sewers, replacement of guardrails and installation of curbs and gutters. | Yes. | Fenton Rd to Hickory Ridge Rd to Middle Rd, back to Milford Rd and vice versa. | Superior Company, Inc. | 9/15 | Mid-November | Milford Road Culvert |
Orchard Lake Road (northbound) | Long Lake Road to Indian Trail | West Bloomfield Township | Guardrail replacement | Yes, just northbound Orchard Lake Rd. Expect periodic closures from 8:30 am to 4:30 pm. Southbound Orchard Lake Rd will remain open to traffic. | For northbound Orchard Lake Rd traffic detour is Long Lake Rd to Middlebelt Rd, back to Orchard Lake Rd. | RCOC | 7/8 | TBA | Permit Work & Short-Term Road Closures |
Preservation Overlays (Simple Resurfacing) | Various heavier traveled roads throughout Oakland County | Various | Simple resurfacing with placing 2-2.5 inches of asphalt on the road surface; work is weather-dependent. | No, expect traffic delays. | No | Cadillac Asphalt and Ace-Saginaw Paving | 5/11 | Mid-November | 2021 Project List |
Sashabaw Road and Oakhill Road Roundabout | Sashabaw Road and Oakhill Road intersection | Brandon and Independence townships | Construction of a compact roundabout, reconstruction of one-third mile of roadway with asphalt, improved drainage, Americans with Disabilities Act-compliant crosswalks, lighting and new curbs and gutters. | Yes | Sashabaw Rd detour: Seymour Lake Rd to Baldwin Rd to Clarkston Rd, back to Sashabaw. Oakhill Rd detour: Perry Lake Rd to Seymour Lake Rd to Dartmouth Rd back to Oakhill Rd | Iafrate Construction | 9/7 | Mid-November | Oakhill/Sashabaw Road Compact Roundabout |
Sashabaw Road/Waldon Road Intersection
| Sashabaw Road/Waldon Road intersection
| Independence Township
| Intersection resurfacing.
| No, flaggers will direct traffic in the work zone. Expect delays.
| No
| Ace Saginaw Paving Company
| 11/2
| COMPLETE | Independence Township Road Improvements |
Subdivision Roads (Special Assessment District) | Various subdivision roads in Oakland County townships | Various townships | Reconstruction and resurfacing roads with asphalt. | No | No | Various | Various start dates | Late fall | Special Assessment District (SAD) Projects |