12 Mile Road (Greenfield Road to Coolidge Road) | From Greenfield Road to Coolidge Road | Berkley | Resurfacing project, improvements to side street approaches, drainage, install Americans with Disabilities Act-compliant crosswalks, new signage and pavement markings. | No, two-way traffic maintained | No | Pro-Line Asphalt Paving | 6/1 | Mid to late October | 12 Mile Road (Greenfield to Coolidge) |
12 Mile Road (Lahser Road to Telegraph Road) | From Lahser Road to Telegraph Road | Southfield | Resurfacing project that includes paving with asphalt, some new curbs/gutters, Americans with Disabilities Act-compliant crosswalks/ramps, new pedestrian signals and guardrail improvements. | No, road will have one lane open in each direction. All business and residential access will be maintained throughout the project. | No | Cadillac Asphalt | 6/1 | SUBSTANTIALLY COMPLETE | 12 Mile Road (Lahser to Telegraph) |
12 Mile Road (SIGNAL MODERNIZATION PROJECT 2019-2020) | From east of Woodward Avenue (M-1) to west of Connecticut Avenue (west of Campbell Road) | Royal Oak | Upgrades to traffic signals, pedestrian crosswalks/sidewalks and improved street lighting. Project includes 10 locations. | No; however, expect lane closures | No | Dan’s Excavating | 10/28/19 (underground infrastructure work) | September, TBA | 12 Mile Signal Modernization Project |
Baldwin Road (Phase II) | From Gregory Road to Waldon Road | Orion Township | Reconstruction and widening of Baldwin Road including: 3 roundabouts (Great Lakes Athletic Center, Maybee and Waldon roads), drainage, Americans with Disabilities Act-compliant crosswalks, improved lighting, pedestrian paths, concrete curbs and gutters. | No, expect lane closures. | No | Dan’s Excavating | 3/30/20 | Late fall of 2020 (behind the curb restoration and landscaping to continue in 2021) | Baldwin Road (Orion Township) |
Chubb Road (PERMIT PROJECT) | From 9 Mile Road to 10 Mile Road | Lyon Township | Gravel road paving between 10 Mile Road and Hidden River Drive. | Yes; however, residential access will be maintained | 9 Mile Rd to Napier Rd to 10 Mile Rd, back to Chubb Rd and vice versa | Lyon Township | 6/1 | Late September | Traffic Alert |
Concrete Slab Replacement | Various heavier-traveled roads throughout Oakland County | Various | Remove and replace concrete | No; however, expect lane closures | No | Cipparrone Contracting | 6/15 | TBA | Concrete Slab Replacement |
Cooley Lake Road (CULVERT REPLACEMENT) | West of Ford Road from Teeple Creek Lane to just west of Forest Edge Drive | Commerce and White Lake townships | Remove and replace a culvert under the road. | Yes | South Duck Lake Rd to Commerce Rd to Carey Rd, back to Cooley Lake Rd | DiPonio Contracting | 8/5 | Late September | Cooley Lake Road Culvert Replacement |
Davisburg Road (CULVERT REPLACEMENT) | Just east of Oakhurst Road | Springfield Township | Culvert removal and replacement. | Yes | Milford Rd to White Lake Rd to Ormond Rd, back to Davisburg Rd and vice versa. | Aielli Construction | 7/31/20 | Fall, TBA | Davisburg Road Culvert Replacement |
*Dequindre Road | From Utica Road to Collins Avenue | Rochester Hills/Shelby Township border | Reconstruction, widening to 5 lanes including a continuous center left-turn lane, right-turn lanes at major intersections, new concrete curbs/gutters and storm sewers, traffic signal upgrades and Americans with Disabilities Act-compliant crosswalks. | Yes, the east leg of Auburn Rd at Dequindre Rd closure is Aug. 12-late Sept. Dequindre Rd will be open to two-way traffic. Once open, the west leg of Auburn Rd at Dequindre Rd will close. | Yes, the east leg of Auburn Rd at Dequindre detour beginning Aug. 12-lateSept. Is: Dequindre Rd to Hamlin Rd to Ryan Rd, back to Auburn Rd and vice versa | Dan’s Excavating | 5/18 | Late fall | Dequindre Road |
Elizabeth Lake Road (PERMIT PROJECT) | From M-59 to Cass Lake Road | Waterford Township | Sanitary sewer and water main repairs. | Yes, however, business access within the construction zone is maintained. | M-59 to North Cass Lake Rd, back to Elizabeth Lake Rd and vice versa. | Oakland County Office of the Water Resources Commissioner | 6/10 | Fall, TBA | Permit Work and Short-Term Road Closures |
Fish Lake Road | From Fenton Road to Elliott Road | Holly and Rose townships | Resurfacing, guardrail replacement and new lane markings. | No | No | Cadillac Asphalt | 10/5 (will take place once railroad crossing repairs on Fish Lake Road south of Grange Hall Road are complete) | 11/6 | Federal Aid Resurfacing |
Fish Lake Road (PERMIT PROJECT) | From Grange Hall Road to Fenton Road (work is between Victoria Lane and Whistle Stop Lane) | Holly Township | Railroad track crossing repairs done in advance of resurfacing work on Fish Lake Road from Elliott Road to Fenton Road. | Yes, however, residential and business access will be maintained. | Academy Rd to Oakland St to Saginaw Rd to Grange Hall Rd, back to Fish Lake Rd and vice versa | Canadian National | 9/21 (railroad track crossing repairs) | 10/5 (approximate) | Permit Work and Short-Term Road Closures |
Grand River Avenue Bridge over CSX Railroad | Between Novi Road and Taft Road | City of Novi | Bridge rehabilitation work including replacement of barrier walls, sidewalk replacement, new pedestrian rails along bridge and guardrail. | No, one lane of traffic maintained in each direction. Pedestrian access maintained opposite side of bridge work.
| No | Davis Construction Company | 6/8 | Mid-November | Grand River Avenue Bridge |
Grass Lake Road | From Ormond Road to Steeple Hill Road | White Lake Township | Gravel road paving with asphalt, improved drainage, some realignment of road and new guardrail installation. | Yes, however, residential access is maintained | Ormond Road to M-59 (Highland Road) to Hill Road, back to Grass Lake Road and vice versa. Additional closure information: CLICK HERE | Dan’s Excavating | 5/4 | Late fall | Grass Lake Road |
*Haggerty Road (PERMIT PROJECT) | North of 8 Mile Road (near Orchard Hill Place) | Novi | Buckeye pipeline repair work | No. Haggerty Road will be reduced to one lane in each direction just north of 8 Mile Road. | No | Buckeye Pipeline | 9/9 | 9/20 | Permit Work & Short-Term Road Closures |
Holly Road | From north of Grange Hall Road north to the county border | Holly Township and Village of Holly | 4.5 miles of asphalt resurfacing, reconstruction of road in three areas to improve drainage, reconstruction of the retaining wall/hill adjustment north of the Belford Road intersection, safety improvements on curves, new guardrail and culvert maintenance. | Yes, access to businesses, cemetery and homes maintained. Phase 1 closure is Holly Rd from Grange Hall Rd to Belford Rd (from June 22 until approximately mid-Sept.) | Holly Road to Grange Hall Road to Dixie Hwy to Baldwin Road (Genesee County), back to Holly Road and vice versa. | Ajax | 6/23 | Late Fall | Holly Road |
Independence Township Road Resurfacing Projects (funded by a millage) | Various heavier traveled/primary roads in Independence Township
| Independence Township | Resurfacing of various roads (Andersonville, Sashabaw, Waldon and Clintonville roads this year). | Mostly open to traffic with flag control in work zones. | For more information on closures: CLICK HERE | Cadillac Asphalt | 5/8 | October, TBA | Independence Township Road Improvements |
Clintonville Road (part of the Independence Township road funding millage) | From Maybee Road to Waldon Road | Independence Township | Road resurfacing project – road will be closed to through traffic during work. | Yes, however, residential and business access will be maintained. | Maybee Rd to Sashabaw Rd to Clarkston Rd, back to Clintonville Rd and vice versa. | Cadillac Asphalt | 8/26 | Early October | Independence Township Road Improvements |
*Joslyn Road | From Brown Road to Pacific Drive (just south of I-75) | Auburn Hills | Remove and replace concrete slabs | No, expect left lane closures on NB and SB Joslyn Rd. The crossover on Joslyn Rd just south of the I-75 ramps is closed until approximately late Sept. | No | Cipparrone Contracting | 9/1 | Fall, TBA | Concrete Slab Replacement |
Opdyke Road (PERMIT PROJECT) | Auburn Road to University Drive | Auburn Hills and Pontiac | Widening and resurfacing work related to a new Amazon business development. | No, expect lane closures. | No | Angelo Iafrate | 6/8 | September, TBA | Permit Work and Short-Term Road Closures |
Ormond Road | From Davisburg Road to north of White Lake Road | Springfield Township | Resurfacing, new guardrail and pavement markings. | No | No | Cadillac Asphalt | 9/2 | Early October | Federal Aid Resurfacing |
Pickering Road Culvert Replacements | Pickering Road (3 locations) | Bloomfield Township | Remove and replace three culverts; erosion control; asphalt paving over new culverts; water, gas and sanitary sewer relocation. | Yes, Fairhill Rd will close at Pickering Rd from July 24 through late September | Detour for Fairhill Rd traffic: Pickering Rd to Kingswood Dr, back to Fairhill Rd and vice versa | VIL Construction | March (tree removal), May-June (utility relocation) and July (culvert work) | Late fall | Pickering Road Culvert Replacements |
Preservation Overlays | Various heavier-traveled roads throughout Oakland County | Various | Simple resurfacing with placing 2-2.5 inches of asphalt on the road surface; work is weather-dependent | No | No | Cadillac Asphalt | 4/28/20 | TBA | Preservation Overlays |
Sashabaw Road (CULVERT REPLACEMENT) | Whipple Lake Canal, just south of the Sashabaw Road/Pine Knob Road intersection | Independence Township | Remove and replace a culvert under the road. | Yes | Clarkston Rd to Baldwin Rd to Seymour Lake Rd, back to Sashabaw Rd and vice versa | Dan’s Excavating | 8/11 | Early November | Sashabaw Road Culvert Replacement |
Spot Resurfacing | Various heavier-traveled roads throughout Oakland County | Various | Milling (grinding of pavement) on smaller sections of roads and paving with asphalt. Work is weather-dependent. | No | No | Florence Cement, Pro Line Asphalt and Cadillac Asphalt | 4/20/20 | TBA | Spot Resurfacing |
Subdivision Roads (special assessment districts) | Various subdivision roads in Oakland County townships | Various townships | Reconstruction and resurfacing road with asphalt. | No | No | Various | Various | Late Fall | Special Assessment District (SAD) Projects |
*Wise Road (CULVERT REPLACEMENT)
| Over the Huron River located between Carroll Lake Road and Union Lake Road
| Commerce Township
| Remove and replace culvert under the road.
| No
| No
| Blaze Contracting
| 7/6
| COMPLETE | Wise Road Culvert Replacement |