12 Mile Road (Greenfield Road to Coolidge Road) | From Greenfield Road to Coolidge Road | Berkley | Resurfacing project, improvements to side street approaches, drainage, install Americans with Disabilities Act-compliant crosswalks, new signage and pavement markings. | No, two-way traffic maintained | No | Pro-Line Asphalt Paving | 6/1 | Mid to late October | 12 Mile Road (Greenfield to Coolidge) |
12 Mile Road (Lahser Road to Telegraph Road)
| From Lahser Road to Telegraph Road
| Southfield
| Resurfacing project that includes paving with asphalt, some new curbs/gutters, Americans with Disabilities Act-compliant crosswalks/ramps, new pedestrian signals and guardrail improvements.
| No
| No
| Cadillac Asphalt
| 6/1
| SUBSTANTIALLY COMPLETE | 12 Mile Road (Lahser to Telegraph) |
12 Mile Road (SIGNAL MODERNIZATION PROJECT 2019-2020) | From east of Woodward Avenue (M-1) to west of Connecticut Avenue (west of Campbell Road) | Royal Oak | Upgrades to traffic signals, pedestrian crosswalks/sidewalks and improved street lighting. Project includes 10 locations. | No; however, expect lane closures | No | Dan’s Excavating | 10/28/19 (underground infrastructure work) | September, TBA | 12 Mile Signal Modernization Project |
Baldwin Road (Phase II) | From Gregory Road to Waldon Road | Orion Township | Reconstruction and widening of Baldwin Road including: 3 roundabouts (Great Lakes Athletic Center, Maybee and Waldon roads), drainage, Americans with Disabilities Act-compliant crosswalks, improved lighting, pedestrian paths, concrete curbs and gutters.
| No, expect lane closures. | No | Dan’s Excavating | 3/30/20 | Late fall of 2020 (behind the curb restoration and landscaping to continue in 2021) | Baldwin Road (Orion Township) |
Chubb Road (PERMIT PROJECT) | From 9 Mile Road to 10 Mile Road | Lyon Township | Gravel road paving between 10 Mile Road and Hidden River Drive. | Yes; however, residential access will be maintained | 9 Mile Rd to Napier Rd to 10 Mile Rd, back to Chubb Rd and vice versa | Lyon Township | 6/1 | Late September | Traffic Alert |
Concrete Slab Replacement | Various heavier-traveled roads throughout Oakland County | Various | Remove and replace concrete | No; however, expect lane closures | No | Cipparrone Contracting | 6/15 | TBA | Concrete Slab Replacement |
Cooley Lake Road (CULVERT REPLACEMENT) | West of Ford Road from Teeple Creek Lane to just west of Forest Edge Drive | Commerce and White Lake townships | Remove and replace a culvert under the road. | Yes | South Duck Lake Rd to Commerce Rd to Carey Rd, back to Cooley Lake Rd | DiPonio Contracting | 8/5 | Late September | Cooley Lake Road Culvert Replacement |
Davisburg Road (CULVERT REPLACEMENT) | Just east of Oakhurst Road | Springfield Township | Culvert removal and replacement. | Yes | Milford Rd to White Lake Rd to Ormond Rd, back to Davisburg Rd and vice versa. | Aielli Construction | 7/31/20 | Fall, TBA | Davisburg Road Culvert Replacement |
Dequindre Road | From Utica Road to Collins Avenue | Rochester Hills/Shelby Township border | Reconstruction, widening to 5 lanes including a continuous center left-turn lane, right-turn lanes at major intersections, new concrete curbs/gutters and storm sewers, traffic signal upgrades and Americans with Disabilities Act-compliant crosswalks.
| Yes, the east leg of Auburn Rd at Dequindre Rd closure is Aug. 12-early Sept. | Yes, the east leg of Auburn Rd at Dequindre detour beginning Aug. 12-early Sept. is: Dequindre Rd to Hamlin Rd to Ryan Rd, back to Auburn Rd and vice versa.
| Dan’s Excavating | 5/18 | Late fall | Dequindre Road |
Elizabeth Lake Road (PERMIT PROJECT) | From M-59 to Cass Lake Road | Waterford Township | Sanitary sewer and water main repairs. | Yes; however, home and business access within the construction zone is maintained. | M-59 to North Cass Lake Rd, back to Elizabeth Lake Rd and vice versa. | Oakland County Office of the Water Resources Commissioner | 6/10 | Fall, TBA | Permit Work and Short-Term Road Closures |
Fish Lake Road | From Fenton Road to Elliott Road | Holly and Rose townships | Resurfacing, guardrail replacement and new lane markings. | No | No | Cadillac Asphalt | 10/5 (will take place once railroad crossing repairs on Fish Lake Road south of Grange Hall Road are complete) | 11/6 | Federal Aid Resurfacing |
Fish Lake Road (PERMIT PROJECT) | From Grange Hall Road to Fenton Road (work is between Victoria Lane and Whistle Stop Lane) | Holly Township | Railroad track crossing repairs done in advance of resurfacing work on Fish Lake Road from Elliott Road to Fenton Road. | Yes; however, residential and business access will be maintained. | Academy Rd to Oakland St to Saginaw Rd to Grange Hall Rd, back to Fish Lake Rd and vice versa | Canadian National | 9/21 (railroad track crossing repairs) | 10/5 (approximate) | Permit Work and Short-Term Road Closures |
Grand River Avenue Bridge over CSX Railroad | Between Novi Road and Taft Road | City of Novi | Bridge rehabilitation work including replacement of barrier walls, sidewalk replacement, new pedestrian rails along bridge and guardrail. | No, one lane of traffic maintained in each direction. Pedestrian access maintained opposite side of bridge work.
| No | Davis Construction Company | 6/8 | Mid-November | Grand River Avenue Bridge |
Grass Lake Road | From Ormond Road to Steeple Hill Road | White Lake Township | Gravel road paving with asphalt, improved drainage, some realignment of road and new guardrail installation. | Yes; however, residential access will be maintained | Ormond Road to M-59 (Highland Road) to Hill Road, back to Grass Lake Road and vice versa. Additional closure information: CLICK HERE | Dan’s Excavating | 5/4 | Late fall | Grass Lake Road |
*Holly Road | From north of Grange Hall Road north to the county border | Holly Township and Village of Holly | 4.5 miles of asphalt resurfacing, reconstruction of road in three areas to improve drainage, reconstruction of the retaining wall/hill adjustment north of the Belford Road intersection, safety improvements on curves, new guardrail and culvert maintenance. | Yes, access to businesses, cemetery and homes maintained. Phase 1 closure is Holly Rd from Grange Hall Rd to Belford Rd (from June 23 until approximately mid-September) | Holly Road to Grange Hall Road to Dixie Hwy to Baldwin Road (Genesee County), back to Holly Road and vice versa. | Ajax | 6/23 | Late Fall | Holly Road |
Independence Township Road Resurfacing Projects (funded by a millage) | Various heavier traveled/primary roads in Independence Township | Independence Township | Resurfacing of various roads (Andersonville, Sashabaw, Waldon and Clintonville roads this year). | Mostly open to traffic with flag control in work zones. | For more information on closures: CLICK HERE | Cadillac Asphalt | 5/8 | October, TBA | Independence Township Road Improvements |
Clintonville Road (part of the Independence Township road funding millage) | From Maybee Road to Waldon Road | Independence Township | Road resurfacing project – road will be closed to through traffic during work. | Yes; however, residential and business access will be maintained. | Maybee Rd to Sashabaw Rd to Clarkston Rd, back to Clintonville Rd and vice versa.
| Cadillac Asphalt | 8/26 | Early October | Independence Township Road Improvements |
Joslyn Road | From Brown Road to Pacific Drive (just south of I-75) | Auburn Hills | Remove and replace concrete slabs | No, expect left lane closures on NB and SB Joslyn Rd | No | Cipparrone Contracting | 9/1 | Fall, TBA | Concrete Slab Replacement |
Opdyke Road (PERMIT PROJECT) | Auburn Road to University Drive | Auburn Hills and Pontiac | Widening and resurfacing work related to a new Amazon business development. | No, expect lane closures. | No | Angelo Iafrate | 6/8 | September, TBA | Permit Work and Short-Term Road Closures |
Ormond Road | From Davisburg Road to north of White Lake Road | Springfield Township | Resurfacing, new guardrail and pavement markings. | No | No | Cadillac Asphalt | 9/1 | Early October | Federal Aid Resurfacing |
*Pickering Road Culvert Replacements | Pickering Road (3 locations) | Bloomfield Township | Remove and replace three culverts; erosion control; asphalt paving over new culverts; water, gas and sanitary sewer relocation. | Yes, Fairhill Rd will close at Pickering Rd from July 24 through late September | Detour for Fairhill Rd traffic: Pickering Rd to Kingswood Dr, back to Fairhill Rd and vice versa | VIL Construction | March (tree removal), May-June (utility relocation) and July (culvert work) | Late fall | Pickering Road Culvert Replacements |
Preservation Overlays | Various heavier-traveled roads throughout Oakland County | Various | Simple resurfacing with placing 2-2.5 inches of asphalt on the road surface; work is weather-dependent | No | No | Cadillac Asphalt | 4/28/20 | TBA | Preservation Overlays |
Quick Road (PERMIT PROJECT) | From North Holly Road to Fish Lake Road | Holly Township | Consumers Energy pipeline replacement | Yes, residential access maintained. | EB traffic detour is Fish Lake Rd to Elliott Rd to North Holly Rd (open to SB traffic only), back to Quick Rd. WB detour is North Holly Rd to Grange Hall Rd to Fish Lake Rd, back to Quick Rd.
| Consumers Energy | 9/1 | 9/4 | Consumers Energy Saginaw Trail Pipeline |
Sashabaw Road (CULVERT REPLACEMENT) | Whipple Lake Canal, just south of the Sashabaw Road/Pine Knob Road intersection | Independence Township | Remove and replace a culvert under the road. | Yes | Clarkston Rd to Baldwin Rd to Seymour Lake Rd, back to Sashabaw Rd and vice versa | Dan’s Excavating | 8/11 | Early November | Sashabaw Road Culvert Replacement |
Spot Resurfacing | Various heavier-traveled roads throughout Oakland County | Various | Milling (grinding of pavement) on smaller sections of roads and paving with asphalt. Work is weather-dependent. | No | No | Florence Cement, Pro Line Asphalt and Cadillac Asphalt | 4/20/20 | TBA | Spot Resurfacing |
Subdivision Roads (special assessment districts) | Various subdivision roads in Oakland County townships | Various townships | Reconstruction and resurfacing road with asphalt. | No | No | Various | Various | Late Fall | Special Assessment District (SAD) Projects |
Wise Road (CULVERT REPLACEMENT) | Over the Huron River located between Carroll Lake Road and Union Lake Road | Commerce Township | Remove and replace culvert under the road. | Yes | Union Lake Rd to Commerce Rd to Carroll Lake Rd, back to Wise Rd and vice versa | Blaze Contracting | 7/6 | Mid-September | Wise Road Culvert Replacement |