12 Mile Road (Greenfield Road to Coolidge Road) | From Greenfield Road to Coolidge Road | Berkley | Resurfacing project, improvements to side street approaches, drainage, install Americans with Disabilities Act-compliant crosswalks, new signage and pavement markings. 12 Mile Road from Greenfield Road to Ellwood Avenue will be reconstructed. | Yes, 12 Mile Road from Greenfield to Ellwood Avenue is closed until approximately mid-July due to utility conflicts. Remaining portion will be open to two-way traffic. | While 12 Mile is closed between Greenfield and Ellwood beginning June 1 through mid-July, the detour is Greenfield Rd to 11 Mile Rd to Coolidge Hwy, back to 12 Mile Rd and vice versa. | Pro-Line Asphalt Paving | 6/1 | Fall, TBA | 12 Mile Road (Greenfield to Coolidge) |
12 Mile Road (Lahser Road to Telegraph Road) | From Lahser Road to Telegraph Road | Southfield | Resurfacing project that includes paving with asphalt, some new curbs/gutters, Americans with Disabilities Act-compliant crosswalks/ramps, new pedestrian signals and guardrail improvements. | No, road will have one lane open in each direction. All business and residential access will be maintained throughout the project. | No | Cadillac Asphalt | 6/1 | Fall, TBA | 12 Mile Road (Lahser to Telegraph) |
12 Mile Road (SIGNAL MODERNIZATION PROJECT 2019-2020) | From east of Woodward Avenue (M-1) to west of Connecticut Avenue (west of Campbell Road) | Royal Oak | Upgrades to traffic signals, pedestrian crosswalks/sidewalks and improved street lighting. Project includes 10 locations.
| No; however, expect lane closures | No | Dan’s Excavating | 10/28/19 (underground infrastructure work) | Early September 2020 | 12 Mile Signal Modernization Project |
*Adams Road | from Walton and Avon Road | Rochester Hills | Guardrail replacement and bank stabilization. | Yes, however, residential access will be maintained north and south of the closure. | Walton to Livernois Rd to Avon Rd, back to Adams Road and vice versa | RCOC Highway Maintenance | 7/13 | Late July | Permit Work and Short-Term Road Closures |
*Baldwin Road (Phase II) | From Gregory Road to Waldon Road | Orion Township | Reconstruction and widening of Baldwin Road including: 3 roundabouts (Great Lakes Athletic Center, Maybee and Waldon roads), drainage, Americans with Disabilities Act-compliant crosswalks, improved lighting, pedestrian paths, concrete curbs and gutters. | Waldon and Maybee roads are both closed at the west side of Baldwin Road; Baldwin Road remains open to traffic. | Yes, for the Maybee and Waldon Road detours: CLICK HERE For traffic changes and detours beginning July 6: CLICK HERE | Dan’s Excavating | 3/30/20 (Maybee and Waldon roads closed at the west side of Baldwin expected to reopen the week of July 6) | Late fall of 2020 (behind the curb restoration work could take place in 2021) | Baldwin Road (Orion Township) |
Chubb Road (PERMIT PROJECT) | From 9 Mile Road to 10 Mile Road | Lyon Township | Gravel road paving between 10 Mile Road and Hidden River Drive. | Yes, however, residential access will be maintained | 9 Mile Rd to Napier Rd to 10 Mile Rd, back to Chubb Rd and vice versa | Lyon Township | 6/1 | Late August | Traffic Alert |
Concrete Slab Replacement | Various heavier-traveled roads throughout Oakland County
| Various | Remove and replace concrete | No; however, expect lane closures | No | Cipparrone Contracting | 6/15 | TBA | Concrete Slab Replacement |
Cooley Lake Road | From Union Lake Road to Round Lake Road (work is just west of Union Lake Road) | Commerce Township | Intersection repairs. Cooley Lake Road will be closed between Union Lake and Round Lake roads. | Yes. Westbound Cooley Lake Road will remain open strictly for business access. | Union Lake Rd to Hutchins St. to Round Lake Rd, back to Cooley Lake Rd and vice versa | Cipparrone Contracting | 6/15 | Late July | Concrete Slab Replacement |
Davisburg Road (CULVERT REPLACEMENT) | Just east of Oakhurst Road | Springfield Township | Culvert removal and replacement. | Yes | Milford Rd to White Lake Rd to Ormond Rd, back to Davisburg Rd and vice versa. | Aielli Construction | Late July, TBA | Early October, TBA | Davisburg Road Culvert Replacement |
*Demode Road (PERMIT PROJECT) | From Fish Lake Road to Hickory Ridge Road | Rose Township | Consumers Energy pipeline installation | Yes, however, residential and business access maintained. | Fish Lake Rd to Rose Center Rd to Hickory Ridge Rd, back to Demode Rd and vice versa | Consumers Energy | 7/6 | 7/10 | Permit Work and Short-Term Road Closures |
Dequindre Road | From Utica Road to Collins Avenue | Rochester Hills/Shelby Township border | Reconstruction, widening to 5 lanes including a continuous center left-turn lane, right-turn lanes at major intersections, new concrete curbs/gutters and storm sewers, traffic signal upgrades and Americans with Disabilities Act-compliant crosswalks. | TBA (expect short-term closures of the Dequindre and Auburn intersection and Dequindre north of Auburn; dates TBA) Dequindre Rd will be mostly open to two-way traffic. | Yes, dates TBA. For detour routes: CLICK HERE | Dan’s Excavating | 5/18 | Late fall | Dequindre Road |
Dixboro Road
| From 8 Mile Road to 9 Mile Road
| Lyon Township, Green Oak Township and South Lyon
| Paving gravel road with asphalt, improved drainage, new signage, guardrail replacement, new curbs and gutters.
| No
| No
| Dan’s Excavating
| 3/30
| COMPLETE | Dixboro Road |
*Elizabeth Lake Road (PERMIT PROJECT) | From M-59 to Cass Lake Road | Waterford Township | Sanitary sewer and water main repairs. | Yes. However, home and business access within the construction zone is maintained. | M-59 to North Cass Lake Rd, back to Elizabeth Lake Rd and vice versa. | Oakland County Office of the Water Resources Commissioner | 6/10 | Late July (closure could be extended due to the complexity of the work below the road surface) | Permit Work and Short-Term Road Closures |
Grand River Avenue Bridge over CSX Railroad | Between Novi Road and Taft Road | City of Novi | Bridge rehabilitation work including replacement of barrier walls, sidewalk replacement, new pedestrian rails along bridge and guardrail. | No, one lane of traffic maintained in each direction. Pedestrian access maintained opposite side of bridge work. | No | Davis Construction Company | 6/8 | Mid-November | Grand River Avenue Bridge |
*Grass Lake Road | From Ormond Road to Steeple Hill Road | White Lake Township | Gravel road paving with asphalt, improved drainage, some realignment of road and new guardrail installation. | Yes, however, residential access will be maintained | Ormond Road to M-59 (Highland Road) to Hill Road, back to Grass Lake Road and vice versa. Additional closure information beginning July 13: CLICK HERE | Dan’s Excavating | 5/4 | Late October | Grass Lake Road |
Gregory Road (PERMIT PROJECT) | From Rohr Road to Baldwin Road | Orion Township | Pulverizing current pavement and resurfacing with asphalt. | Yes; however, residential access will be maintained.
| Rohr Rd to Maybee Rd to Baldwin Rd and vice versa | Cadillac Asphalt (on behalf of Pulte Homes) | 7/7 | Early August | Permit Work and Short-Term Road Closures |
Holly Road | From north of Grange Hall Road north to the county border | Holly Township and Village of Holly | 4.5 miles of asphalt resurfacing, reconstruction of road in three areas to improve drainage, reconstruction of the retaining wall/hill adjustment north of the Belford Road intersection, safety improvements on curves, new guardrail and culvert maintenance. | Yes, access to businesses, cemetery and homes maintained. Phase 1 closure is Holly Rd from Grange Hall Rd to Belford Rd (from June 22 until approximately Sept. 1) | Holly Road to Grange Hall Road to Dixie Hwy to Baldwin Road (Genesee County), back to Holly Road and vice versa. | Ajax | 6/23 | Late Fall | Holly Road |
Independence Township Road Resurfacing Projects (funded by a millage) | Various heavier traveled/primary roads in Independence Township | Independence Township | Resurfacing of various roads (Andersonville, Sashabaw, Waldon and Clintonville roads this year). | Mostly open to traffic with flag control in work zones. | For more information on closures, visit: CLICK HERE | Cadillac Asphalt | 5/8 | October, TBA | Independence Township Road Improvements |
Clintonville Road (part of the Independence Township road funding millage) | From Waldon Road to Clarkston Road | Independence Township | Road resurfacing project – road will be closed to through traffic during work. | Yes, residential and business access will be maintained. | Pine Knob Rd to Sashabaw Rd to Clarkston Rd, back to Clintonville Rd and vice versa. | Cadillac Asphalt | 7/21 | Mid- August | Independence Township Road Improvements |
*Waldon Road (part of the Independence Township road funding millage)
| From Sashabaw Road to Clintonville Road | Independence Township | Road resurfacing project– road is closed to through traffic during work. | Yes, residential and business access will be maintained | Sashabaw Rd to Maybee Rd to Clintonville Rd, back to Waldon Rd and vice versa | Cadillac Asphalt | 5/26 | 7/3 (late afternoon) | Independence Township Road Improvements |
Joslyn Road | From Brown Road to Pacific Drive (just south of I-75) | Auburn Hills | Remove and replace concrete slabs | No, road is open to traffic with lane closures. Residential and business access maintained. | No | Cipparrone Contracting | 6/29 | Mid-August | Concrete Slab Replacement |
Maybee Road (PERMIT PROJECT) | From Clintonville Road to Sashabaw Road | Independence Township | Road reconstruction affiliated with a North Sashabaw School project. | Yes, however, residential and business access will be maintained. | Sashabaw Rd to Walton Blvd to Clintonville Road, back to Maybee Rd and vice versa. | Asphalt Specialists on behalf of Clarkston Schools
| 7/6 | 8/2 | Permit Work and Short-Term Road Closures |
Middlebelt Road (PERMIT PROJECT) | From Grand River Avenue to Shiawassee Street | Farmington Hills | Consumers Energy gas main replacement | Yes, however, residential and business access will be maintained | Grand River Ave to Orchard Lake Rd to Nine Mile Rd, back to Middlebelt Rd and vice versa | Consumers Energy | 6/15 | Late August | Permit Work and Short-Term Road Closures |
Opdyke Road (PERMIT PROJECT) | Auburn Road to University Drive | Auburn Hills and Pontiac | Widening and resurfacing work related to a new Amazon business development. | No, expect lane closures. | No | Angelo Iafrate | 6/8 | August, TBA | Permit Work and Short-Term Road Closures |
Orchard Lake Road | From Grand River Avenue to I-696 | Farmington and Farmington Hills | Concrete slab removal and replacement | No, road is open to traffic with lane closures. Residential and business access maintained.
| No | Cipparrone Contracting | 6/18 | Late Summer | Concrete Slab Replacement |
*Ormond Road | From White Lake Road to Davisburg Road | Springfield Township | Remove and replace a culvert under the road. | Yes, residential access is maintained. The full closures is just north of Neal Road. | White Lake Rd to Milford Rd to Davisburg Rd, back to Ormond Rd and vice versa. | RCOC Highway Maintenance | 7/7 | 7/7 (evening) | Permit Work and Short-Term Road Closures |
Pickering Road Culvert Replacements | Pickering Road (3 locations) | Bloomfield Township | Remove and replace three culverts; erosion control; asphalt paving over new culverts; water, gas and sanitary sewer relocation. | No, access to homes will be maintained | No | VIL Construction | Utility relocation will take place April -June. Culvert replacement is expected to begin late June. | Late fall | Pickering Road Culvert Replacements |
Preservation Overlays | Various heavier-traveled roads throughout Oakland County | Various | Simple resurfacing with placing 2-2.5 inches of asphalt on the road surface; work is weather-dependent | No | No | Cadillac Asphalt | 4/28/20 | TBA | Preservation Overlays |
*Rattalee Lake Road (PERMIT PROJECT) | From Fish Lake Road to Ledgerstone Road | Rose Township | Consumers Energy pipeline installation | Yes, however, residential and business access maintained. | Fish Lake Rd to Fenton Rd to Buckhorn Lake Rd, back to Rattalee Lake Rd and vice versa | Consumers Energy | 7/7 | 7/10 | Permit Work and Short-Term Road Closures |
Sashabaw Road (CULVERT REPLACEMENT) | Whipple Lake Canal, just south of the Sashabaw Road/Pine Knob Road intersection
| Independence Township | Remove and replace a culvert under the road. | Yes | Clarkston Rd to Baldwin Rd to Seymour Lake Rd, back to Sashabaw Rd and vice versa | Dan’s Excavating | 8/24/20 (tentatively) | November, TBA | Sashabaw Road Culvert Replacement |
Spot Resurfacing | Various heavier-traveled roads throughout Oakland County | Various | Milling (grinding of pavement) on smaller sections of roads and paving with asphalt. Work is weather-dependent. | No | No | Florence Cement, Pro Line Asphalt and Cadillac Asphalt | 4/20/20 | TBA | Spot Resurfacing |
*Square Lake Road (CULVERT REPLACEMENT) | Over the Amy Drain located between Opdyke Road and Squirrel Road (at the Eastways and Square Road intersection) | Bloomfield Township | Remove and replace a culvert under the road. | Yes | Square Lake Rd to Opdyke Rd to South Blvd to Squirrel Rd, back to Square Lake Rd and vice versa. For Eastways Rd traffic, the detour is Long Lake Rd to Squirrel Rd to Square Lake Rd and vice versa. | DiPonio Contracting | 8/3/20 | Late August | Square Lake Road Culvert Replacement |
Subdivision Roads (special assessment districts) | Various subdivision roads in Oakland County townships | Various townships | Reconstruction and resurfacing road with asphalt. | No | No | Various | Various | Late Fall | Special Assessment District (SAD) Projects |
Union Lake Road | Richardson Road and Commerce Road | Commerce Township | Consumers Energy gas service work | Yes, access to residents and businesses maintained. | Richardson Rd to Newton Rd to Commerce Rd, back to Union Lake Rd and vice versa | Consumers Energy | 7/11 | 7/12 (evening) | Permit Work and Short-Term Road Closures |
Various (PERMIT PROJECTS) | Buno, Dawson, Demode, Lone Tree, Maple (west of Milford Road), Munger, Rattalee Lake, Rowe roads and Watkins Blvd. | Highland, Milford and Rose townships | Consumers Energy pipeline work | Yes, roads will close for 2-3 days. Residential and business access maintained. | For more information on closures and detours: CLICK HERE | Consumers Energy | 7/6 (beginning with Demode Road from Fish Lake to Hickory Ridge Road) | Mid-August | Permit Work and Short-Term Road Closures |
*Watkins Blvd. (PERMIT PROJECT) | West of Milford Road | Milford Township | Consumers Energy pipeline installation | Yes, however, residential access maintained. | Milford Rd to Lone Tree Rd to Milford High School access road, back to Watkins Blvd and vice versa | Consumers Energy | 7/8 | 7/15 | Permit Work and Short-Term Road Closures |
Wise Road (CULVERT REPLACEMENT) | Over the Huron River located between Carroll Lake Road and Union Lake Road | Commerce Township | Remove and replace culvert under the road. | Yes | Union Lake Rd to Commerce Rd to Carroll Lake Rd, back to Wise Rd and vice versa | Blaze Contracting | 7/6 | Mid-September | Wise Road Culvert Replacement |