*12 Mile Road (Greenfield Road to Coolidge Road) | From Greenfield Road to Coolidge Road | Berkley | Resurfacing project, improvements to side street approaches, drainage, install Americans with Disabilities Act-compliant crosswalks, new signage and pavement markings. 12 Mile Road from Greenfield Road to Ellwood Avenue will be reconstructed. | Yes, 12 Mile Road from Greenfield to Ellwood Avenue is closed until approximately mid-July due to utility conflicts. Remaining portion will be open to two-way traffic. | While 12 Mile is closed between Greenfield and Ellwood beginning June 1 through mid-July, the detour is Greenfield Rd to 11 Mile Rd to Coolidge Hwy, back to 12 Mile Rd and vice versa.
| Pro-Line Asphalt Paving | 6/1 | Fall, TBA | 12 Mile Road (Greenfield to Coolidge) |
12 Mile Road (Lahser Road to Telegraph Road) | From Lahser Road to Telegraph Road | Southfield | Resurfacing project that includes paving with asphalt, some new curbs/gutters, Americans with Disabilities Act-compliant crosswalks/ramps, new pedestrian signals and guardrail improvements.
| No, road will have one lane open in each direction. All business and residential access will be maintained throughout the project. | No | Cadillac Asphalt | 6/1 | Fall, TBA | 12 Mile Road (Lahser to Telegraph) |
*12 Mile Road (SIGNAL MODERNIZATION PROJECT 2019-2020) | From east of Woodward Avenue (M-1) to west of Connecticut Avenue (west of Campbell Road)
| Royal Oak | Upgrades to traffic signals, pedestrian crosswalks/sidewalks and improved street lighting. Project includes 10 locations. | No; however, expect lane closures | No | Dan’s Excavating | 10/28/19 (underground infrastructure work) | Early September 2020 | 12 Mile Signal Modernization Project |
*Baldwin Road (Phase II) | From Gregory Road to Waldon Road | Orion Township | Reconstruction and widening of Baldwin Road including: 3 roundabouts (Great Lakes Athletic Center, Maybee and Waldon roads), drainage, Americans with Disabilities Act-compliant crosswalks, improved lighting, pedestrian paths, concrete curbs and gutters. | Waldon and Maybee roads are both closed at the west side of Baldwin Road; Baldwin Road remains open to traffic. | Yes, for the Maybee and Waldon Road detours: CLICK HERE | Dan’s Excavating | 3/30/20 (Maybee and Waldon roads closed at the west side of Baldwin expected to reopen the week of July 6) | Late fall of 2020 (behind the curb restoration work could take place in 2021) | Baldwin Road (Orion Township) |
Chubb Road (PERMIT PROJECT) | From 9 Mile Road to 10 Mile Road | Lyon Township | Gravel road paving between 10 Mile Road and Hidden River Drive. | Yes, however, residential access will be maintained | 9 Mile Rd to Napier Rd to 10 Mile Rd, back to Chubb Rd and vice versa | Lyon Township | 6/1 | Late August | Traffic Alert |
Concrete Slab Replacement | Various heavier-traveled roads throughout Oakland County | Various | Remove and replace concrete | No; however, expect lane closures | No | Cipparrone Contracting | 6/15 | TBA | Concrete Slab Replacement |
Cooley Lake Road | From Union Lake Road to Round Lake Road (work is just west of Union Lake Road) | Commerce Township | Intersection repairs. Cooley Lake Road will be closed between Union Lake and Round Lake roads. | Yes. Westbound Cooley Lake Road will remain open strictly for business access. | Union Lake Rd to Hutchins St. to Round Lake Rd, back to Cooley Lake Rd and vice versa | Cipparrone Contracting | 6/15 | Late July | Concrete Slab Replacement |
Davisburg Road (CULVERT REPLACEMENT) | Just east of Oakhurst Road | Springfield Township | Culvert removal and replacement. | Yes | Milford Rd to White Lake Rd to Ormond Rd, back to Davisburg Rd and vice versa.
| Aielli Construction | Late July, TBA | Early October, TBA | Davisburg Road Culvert Replacement |
Dequindre Road | From Utica Road to Collins Avenue | Rochester Hills/Shelby Township border | Reconstruction, widening to 5 lanes including a continuous center left-turn lane, right-turn lanes at major intersections, new concrete curbs/gutters and storm sewers, traffic signal upgrades and Americans with Disabilities Act-compliant crosswalks. | TBA (expect short-term closures of the Dequindre and Auburn intersection and Dequindre north of Auburn; dates TBA) Dequindre Rd will be mostly open to two-way traffic. | Yes, dates TBA. For detour routes: CLICK HERE | Dan’s Excavating | 5/18 | Late fall | Dequindre Road |
*Dixboro Road | From 8 Mile Road to 9 Mile Road | Lyon Township, Green Oak Township and South Lyon | Paving gravel road with asphalt, improved drainage, new signage, guardrail replacement, new curbs and gutters. | Yes | 9 Mile Road to Pontiac Trail to 8 Mile Rd, back to Dixboro Rd and vice versa (residential and Volunteer Park access maintained). | Dan’s Excavating | 3/30 | Late June | Dixboro Road |
Elizabeth Lake Road (PERMIT PROJECT) | From M-59 to Cass Lake Road | Waterford Township | Sanitary sewer and water main repairs. | Yes. However, home and business access within the construction zone is maintained. | M-59 to North Cass Lake Rd, back to Elizabeth Lake Rd and vice versa. | Oakland County Office of the Water Resources Commissioner | 6/10 | Late June (closure could be extended due to the complexity of the work below the road surface) | Permit Work and Short-Term Road Closures |
Grand River Avenue Bridge over CSX Railroad | Between Novi Road and Taft Road | City of Novi | Bridge rehabilitation work including replacement of barrier walls, sidewalk replacement, new pedestrian rails along bridge and guardrail. | No, one lane of traffic maintained in each direction. Pedestrian access maintained opposite side of bridge work. | No | Davis Construction Company | 6/8 | Mid-November | Grand River Avenue Bridge |
Grass Lake Road | From Ormond Road to Steeple Hill Road | White Lake Township | Gravel road paving with asphalt, improved drainage, some realignment of road and new guardrail installation. | Yes, however, residential access will be maintained | Ormond Road to M-59 (Highland Road) to Hill Road, back to Grass Lake Road and vice versa | Dan’s Excavating | 5/4 | Late October | Grass Lake Road |
Gregory Road (PERMIT PROJECT) | From Rohr Road to Baldwin Road | Orion Township | Pulverizing current pavement and resurfacing with asphalt. | Yes, however, residential access will be maintained. | Rohr Rd to Maybee Rd to Baldwin Rd and vice versa | Cadillac Asphalt (on behalf of Pulte Homes) | The week of 7/6 | Early August | Permit Work and Short-Term Road Closures |
Holly Road | From north of Grange Hall Road north to the county border | Holly Township and Village of Holly | 4.5 miles of asphalt resurfacing, reconstruction of road in three areas to improve drainage, reconstruction of the retaining wall/hill adjustment north of the Belford Road intersection, safety improvements on curves, new guardrail and culvert maintenance. | Yes, access to businesses, cemetery and homes maintained. Phase 1 closure is Holly Rd from Grange Hall Rd to Belford Rd (from June 22 until approximately Sept. 1) | Holly Road to Grange Hall Road to Dixie Hwy to Baldwin Road (Genesee County), back to Holly Road and vice versa. | Ajax | 6/23 | Late Fall | Holly Road |
Independence Township Road Resurfacing Projects (funded by a millage) | Various heavier traveled/primary roads in Independence Township | Independence Township | Resurfacing of various roads (Andersonville, Sashabaw, Waldon and Clintonville roads this year). | Mostly open to traffic with flag control in work zones. | For more information on closures, visit: CLICK HERE | Cadillac Asphalt | 5/8 (beginning with Andersonville Road from Old White Lake Road to the township border) | October, TBA | Independence Township Road Improvements |
*Clintonville Road (part of the Independence Township road funding millage) | From Waldon Road to Clarkston Road | Independence Township | Road resurfacing project – road will be closed to through traffic during work. | Yes, residential and business access will be maintained. | Pine Knob Rd to Sashabaw Rd to Clarkston Rd, back to Clintonville Rd and vice versa. | Cadillac Asphalt | 7/21/20 | Mid- August | Independence Township Road Improvements |
Waldon Road (part of the Independence Township road funding millage) | From Sashabaw Road to Clintonville Road | Independence Township | Road resurfacing project– road is closed to through traffic during work. | Yes, residential and business access will be maintained | Sashabaw Rd to Maybee Rd to Clintonville Rd, back to Waldon Rd and vice versa | Cadillac Asphalt | 5/26/20 | Late June | Independence Township Road Improvements |
Joslyn Road | From Brown Road to Pacific Drive (just south of I-75) | Auburn Hills | Remove and replace concrete slabs | No, road is open to traffic with lane closures. Residential and business access maintained. | No | Cipparrone Contracting | 6/29 | Mid-August | Concrete Slab Replacement |
Maple Road and Middlebelt Road intersection
| Maple Road and Middlebelt Road intersection (roundabout construction)
| West Bloomfield Township
| Concrete work on the roundabout, behind the curb restoration and installation of pedestrian crosswalk signals
| No
| No
| Angelo Iafrate
| 4/27
| COMPLETE | Maple and Middlebelt Roundabout Construction |
Middlebelt Road (PERMIT PROJECT) | From Grand River Avenue to Shiawassee Street | Farmington Hills | Consumers Energy gas main replacement | Yes, however, residential and business access will be maintained | Grand River Ave to Orchard Lake Rd to Nine Mile Rd, back to Middlebelt Rd and vice versa | Consumers Energy | 6/15 | Late August | Permit Work and Short-Term Road Closures |
*Opdyke Road (PERMIT PROJECT) | Auburn Road to University Drive | Auburn Hills and Pontiac | Widening and resurfacing work related to a new Amazon business development. | No, expect lane closures. | No | Angelo Iafrate | 6/8 | August, TBA | Permit Work and Short-Term Road Closures |
Orchard Lake Road | From Grand River Avenue to I-696 | Farmington and Farmington Hills | Concrete slab removal and replacement | No, road is open to traffic with lane closures. Residential and business access maintained. | No | Cipparrone Contracting | 6/18 | Late Summer | Concrete Slab Replacement |
Pickering Road Culvert Replacements | Pickering Road (3 locations) | Bloomfield Township | Remove and replace three culverts; erosion control; asphalt paving over new culverts; water, gas and sanitary sewer relocation. | No, access to homes will be maintained | No | VIL Construction | Utility relocation will take place April -June. Culvert replacement is expected to begin late June. | Late fall | Pickering Road Culvert Replacements |
Preservation Overlays | Various heavier-traveled roads throughout Oakland County | Various | Simple resurfacing with placing 2-2.5 inches of asphalt on the road surface; work is weather-dependent | No | No | Cadillac Asphalt | 4/28/20 | TBA | Preservation Overlays |
Sashabaw Road (CULVERT REPLACEMENT) | Whipple Lake Canal, just south of the Sashabaw Road/Pine Knob Road intersection | Independence Township | Remove and replace a culvert under the road. | Yes | Seymour Lake Rd to Baldwin Rd to Clarkston Rd, back to Sashabaw Rd and vice versa | Dan’s Excavating | 8/24/20 (tentatively) | November, TBA | Sashabaw Road Culvert Replacement |
Spot Resurfacing | Various heavier-traveled roads throughout Oakland County | Various | Milling (grinding of pavement) on smaller sections of roads and paving with asphalt. Work is weather-dependent. | No | No | Florence Cement, Pro Line Asphalt and Cadillac Asphalt | 4/20/20 | TBA | Spot Resurfacing |
Square Lake Road (CULVERT REPLACEMENT) | Over the Amy Drain located between Opdyke Road and Squirrel Road | Bloomfield Township | Remove and replace a culvert under the road. | Yes | TBA | DiPonio Contracting | TBA | TBA | Square Lake Road Culvert Replacement |
Subdivision Roads (special assessment districts) | Various subdivision roads in Oakland County townships | Various townships | Reconstruction and resurfacing road with asphalt. | No | No | Various | Various | Late Fall | Special Assessment District (SAD) Projects |
Various (PERMIT PROJECTS) | Buno, Dawson, Demode, Lone Tree, Maple (west of Milford Road), Munger, Rattalee Lake, Rowe roads and Watkins Blvd. | Highland, Milford and Rose townships | Consumers Energy pipeline work | Yes, roads will close for 2-3 days. Residential and business access maintained. | For more information on closures and detours: CLICK HERE | Consumers Energy | 7/6 (beginning with Demode Road from Fish Lake to Hickory Ridge Road) | Mid-August | Permit Work and Short-Term Road Closures |
Wise Road (CULVERT REPLACEMENT) | Over the Huron River located between Carroll Lake Road and Union Lake Road | Commerce Township | Remove and replace culvert under the road. | Yes | Union Lake Rd to Commerce Rd to Carroll Lake Rd, back to Wise Rd and vice versa | Blaze Contracting | 7/6 | Mid-September | Wise Road Culvert Replacement |