Bald Mountain Road (PERMIT PROJECT) | Dutton Road to Roxbury Drive (south of Silverbell Road) | Orion Township | Emergency road closure for planned work on a Consumers Energy high-pressure gas transmission line. The transmission line is just below the road's surface and will be lowered at a future date. This section of the road is closed for safety. | Yes. | Dutton Rd to Squirrel Rd to Silverbell Rd, back to Bald Mountain Rd and vice versa. | Consumers Energy 800-477-5050 | 4/19 | 11/3 | Consumers Energy |
*Carroll Lake Road | Commerce Road and Wise Road | Commerce Township | Culvert removal and replacement. One-day project. | Yes, the work is just north of Commerce Rd. Residential and business access maintained. | Commerce Rd to Bogie Lake Rd to Wise Rd, back to Carroll Lake Rd and vice versa. | RCOC Highway Maintenance | 9/10 (morning) | 9/10 (evening) | Permit Work & Short-Term Road Closures |
Cass Lake Road Culvert Replacement | Cass Elizabeth Road to Orchard Lake Road. The work is located over the Cass Lake/Otter Lake Canal (between Port Cove Drive and Bangor Road) | Waterford Township | Removal of a culvert under the road and replacing it with a concrete culvert. Work also includes asphalt paving over the vicinity of the culvert, storm sewer replacement, new guardrail and pavement markings. | Yes, the road is closed to through traffic. Residential and business access maintained north and south of the culvert replacement. | Cass Elizabeth Rd to Cooley Lake Rd to Hiller Rd to Commerce Rd to Orchard Lake Rd, back to Cass Lake Rd and vice versa. | Superior Contracting | 8/17 | Late September | Cass Lake Road Culvert Replacement |
Clarkston Road (PERMIT PROJECT) | Adams Road to Lake George Road | Oakland Township | Drainage improvements, storm sewer installation and gravel road paving by private developers. | Yes. Residential and business access will be maintained. | Lake George Rd to Stoney Creek Rd to Adams Rd, back to Clarkston Rd and vice versa. | Ajax Paving | 8/4 | Late November | Permit Work & Short-Term Road Closures |
Club Drive (PERMIT PROJECT) | Club Drive at Porters Lane (west of Franklin Road) | Bloomfield Township | Installation of a bypass pump and sanitary sewer. | Yes. | Square Lake Rd to Telegraph Rd to Franklin Rd, back to Club Drive and vice versa. | FDM Contracting on behalf of Bloomfield Twp. | 5/9 | Mid-October | Permit Work & Short-Term Road Closures |
Concrete Repairs | Various heavier traveled roads in Oakland County | Various | Concrete removal and replacement. | No, expect lane closures. | No | Cipparrone Contracting, Inc. | 4/11 | Fall, TBA | Concrete Repairs |
Currie Road | Eight Mile Road to just north of Nine Mile Road | Lyon Township and Salem Township | Gravel road paving with asphalt, drainage improvements, concrete curbs and gutters. The project also includes roundabout construction at Nine Mile Rd/Currie Rd intersection. | Yes, Currie Road is closed. Access to homes maintained. Residents must access Currie Road from Eight Mile Rd (due to roundabout construction at Nine Mile Rd/Currie Rd (intersection). | Currie Rd detour is Seven Mile Rd to Napier Road to Ten Mile Rd, back to Currie Rd and vice versa. | Angelo Iafrate | 4/18 | Mid-October | Currie Road |
Currie Road/Nine Mile Road intersection (Part of the Currie Road project) | Currie Road/Nine Mile Road intersection | Lyon Township | Construction of a single-lane roundabout at the Currie Road/Nine Mile Road intersection. | Yes, the intersection is closed for roundabout construction. Residential access maintained from the Currie Road/Eight Mile Road roundabout. | Nine Rd to Griswold Rd to Ten Mile Rd to Napier Rd, back to Nine Mile Rd and vice versa. | Angelo Iafrate | 8/8 | Mid-October | Currie Road |
East Glass Road (PERMIT PROJECT) | Ortonville Road (M-15) and Viola Drive | Brandon Township | Storm sewer removal and installation work done by the Oakland County Water Resources Commissioner's Office. | Yes, residential access will be maintained. | Granger Rd to South Hadley Rd to Seymour Lake Rd to Ortonville Rd (M-15), back to East Glass Rd and vice versa. | Zito Construction, on behalf of the Oakland County Water Resources Commissioner's Office | 8/29 | 12/31 | Permit Work & Short-Term Road Closures |
Fish Lake Road Culvert Replacements | Grange Hall Road to Academy Road | Holly Township | Removal and replacement of culverts under the road that carry the Patterson-Holly Drain and Shiawassee River. The work also includes asphalt paving over culverts, drainage improvements, new guardrail, signs and pavement markings. | Yes. Fish Lake Road from Grange Hall Road to Academy Road is closed to through traffic. Residential and business access maintained north and south of the culvert work. | Grange Hall Rd to Saginaw St to Oakland St/Academy Rd, back to Fish Lake Rd and vice versa. | Zito Construction | 6/27 | Late October | Fish Lake Road Culverts |
*Grand River Avenue (PERMIT WORK) | Beck Road to Taft Road | Novi | Consumers Energy gas main replacement. | No, expect the right (outside) lane on eastbound Grand River Ave. to close. Traffic will be shifted to the inside (left) lane in the work zone. | No. | Consumers Energy 800-477-5050 | 9/12 | Late October | Consumers Energy |
Grange Hall Road | Fish Lake Road to Leroy Street | Holly Township and Fenton | One-day closure for culvert removal and replacement. Work is just east of Rhoades Lane. | Yes, the road will close just east of Rhoades Lane. | Saginaw St to Academy Rd to Fish Lake Rd to South Holly Rd to Leroy Street, back to Grange Hall Rd and vice versa. | Great Lakes Contracting | 9/10 (morning) | 9/10 (evening) | Permit Work & Short-Term Road Closures |
Groveland Road | Ortonville Road (M-15) to Barron Road | Groveland Township | Resurfacing work, gravel shoulders and new pavement markings. | No. The road will remain open with flaggers directing traffic. | No. | Ace-Saginaw Paving | 8/25 | 9/23 | Simple Resurfacing & Preservation Overlays |
Hatchery Road | Dixie Highway to Airport Road (the work is just west of Frembes Road) | Waterford Township | Bridge replacement over the Clinton River, culvert replacement west of the bridge, demolition of the wooden pedestrian bridge (new bridge will facilitate pedestrians) and new guardrails. | The road is closed over the Clinton River. Residential access maintained east and west of the bridge. | Dixie Hwy to Williams Lake Rd to Airport Rd, back to Hatchery Rd and vice versa. | Toebe Construction | 6/13 | Late fall | Hatchery Road Bridge Replacement over the Clinton River |
*High-Friction Surface Treatment | Various locations | Holly Township and Waterford Township | Road surface treatment that provides a coarse, sandpaper-like surface designed to improve friction and reduce the likelihood of traffic running off the road. The work is weather-dependent. | No, flaggers will direct traffic in the work zone. | No. | Fahrner Asphalt Sealers, LLC | 8/23 | September, TBA | High-Friction Surface Treatment |
Joint Repairs | Various heavier traveled roads. | Commerce Township, Highland Township, Novi, Troy and Wixom | Milling (grinding pavement) road joints and paving with asphalt. | No. During the work, the roads will remain open with flaggers directing traffic. | No | Cadillac Asphalt | 6/16 | TBA | Joint Repairs |
Long Lake Road (PERMIT PROJECT) | North and south legs of Franklin Road (closure is between Groton Road and Pine Tree Trail) | Bloomfield Township | Sanitary sewer work. | Yes, residential and business access maintained. | Telegraph Rd to Lone Pine Rd to Franklin Rd, back to Long Lake Rd and vice versa. Residents living on Groton Rd and Pine Tree Trl will need to use Franklin Rd. | Bloomfield Township | 9/12 | 11/7 | Permit Work & Short-Term Road Closures |
*Long Lake Road/ Middlebelt Road intersection (PERMIT PROJECT) | Long Lake Road and Middlebelt Road intersection | West Bloomfield Township | Consumers Energy emergency gas utility repairs. | Yes, the intersection will fully close. | Middlebelt Rd traffic detour is Lone Pine Rd to Orchard Lake Rd, back to Middlebelt Rd and vice versa. Long Lake Rd detour is Orchard Lake Rd to Lone Pine Rd to Telegraph Rd, back to Long Lake Rd and vice versa. | Consumers Energy 800-477-5050 | 9/10 | 9/18 | Consumers Energy |
Maloney Street Bridge Replacement | North of Drahner Road over Clear Lake and Long Lake | Oxford Township | Removal and replacement of a bridge. | The waterway under the bridge is closed to boats and other recreational traffic during the project. Residential access maintained. | No, residential access is maintained via a single-lane temporary road. | F.H. Paschen | 7/5 | 10/18 | Maloney Street Bridge Replacement |
Mann Road | Just west of Clintonville Road | Waterford and Independence townships | Milling (grinding) road surface and paving with asphalt. | No. | No. | Fessler and Bowman Inc. | 8/10 | Late October | Mann Road Culvert Replacement & Resurfacing |
Maple Road | Rochester Road to Dequindre Road | Troy | Road resurfacing work that includes concrete repairs, Americans with Disabilities Act-compliant sidewalk ramps and repairs to curbs and gutters. | No, expect lane closures during the work. | No | Cadillac Asphalt | 8/13 | Late September | Maple Road, Coolidge Hwy. to Dequindre Road |
Orchard Lake Road | Middlebelt Road to Old Telegraph Road | Sylvan Lake, West Bloomfield Township, Bloomfield Township and Pontiac | Road resurfacing work including asphalt paving, concrete slab replacements, Americans with Disabilities Act-compliant crosswalks, traffic signal upgrades, drainage improvements and widening east of Middlebelt Rd to accommodate a center left-turn lane. | No; one lane will remain open in each direction. | No | Florence Cement | 6/27 | Late September | Orchard Lake Road, Middlebelt to Old Telegraph Road |
Orchard Lake Road | 13 Mile Road to 14 Mile Road | Farmington Hills | Resurfacing /reconstruction project that includes asphalt paving, concrete replacement, roundabout construction at the Orchard Lake Plaza entrance and a four-lane boulevard from Hunters Lane to 14 Mile Rd. | Yes, northbound Orchard Lake Rd is closed. Southbound Orchard Lake Rd to remain open with business access maintained. | Northbound Orchard Lake Rd traffic detour is 13 Mile Rd to Northwestern Hwy back to Orchard Lake Rd. | M.L. Chartier | 3/21 | Late November | Orchard Lake Road, 13 Mile to 14 Mile Road |
Orchard Lake Road Culvert over the Rouge River | 10 Mile Road to 11 Mile Road (northbound) | Farmington Hills | Culvert removal and replacement. Additionally, a second culvert will be rehabilitated during the work. | Northbound Orchard Lake Rd is closed between 10 Mile and 11 Mile roads. Southbound Orchard Lake Rd will have intermittent closures during the work. Residential and business access maintained north and south of the work. | 10 Mile Rd to Middlebelt Rd to 11 Mile Rd, back to Orchard Lake Rd and vice versa. | V.I.L. Construction | 8/11 | Mid-October | Orchard Lake Road Culvert over the Rouge River |
Preservation Overlays (Simple Resurfacing) | Various heavier traveled roads throughout Oakland County | Various | Simple resurfacing with placing 2-2.5 inches of asphalt on the road surface; work is weather-dependent. | No, expect traffic delays. | No | Cadillac Asphalt and Ace-Saginaw Paving | 4/18 | Late summer | 2022 Project List |
Rochester Road | Tienken Road to Lakeville Road | Rochester Hills, Oakland Township and Addison Township | 9.40 miles of road resurfacing, gravel shoulders and new pavement markings. | No. The road will remain open with flaggers directing traffic. | No. | M.L. Chartier | 8/9 | 10/14 | Rochester Road, Tienken Road to Lakeville Road |
Spot Resurfacing | Various heavier traveled roads in Oakland County | Various | Milling (grinding) of pavement on smaller sections of roads and paving with asphalt. Paving work is weather-dependent. | No, work is done with flaggers directing traffic. | No. | Florence Cement and Pro-Line Asphalt | 4/18 | Late summer | Spot Resurfacing |
*Ten Mile Road/Haggerty Road intersection | Ten Mile Road/Haggerty Road intersection | Novi | Removing asphalt sections of pavement and replacing with concrete. | No, expect lane closures and lane shifts. | No. | Toebe Construction | 9/12 | 10/12 | Ten Mile Road, Meadowbrook to Haggerty Road (2022-23) |
Walton Blvd. | Sashabaw Road to Clintonville Road | Waterford Township | Removal of existing concrete, resurfacing with asphalt, minor drainage improvements, Americans with Disabilities Act (ADA)-compliant crosswalks, traffic signal upgrade at Mason School entrance and replacement of some curbs and gutters. | No. One lane of traffic is open in each direction during the work. | No. | Ajax Paving | 7/25 | Mid-November | Walton Blvd. |