14 Mile Road (PERMIT PROJECT) | Decker/Novi Road to Walled Lake Road | Novi and Walled Lake | Great Lakes Water Authority watermain replacement. | Yes. | Walled Lake Dr to Pontiac Trl to Maple Rd to Decker Rd, back to 14 Mile Rd and vice versa. | Great Lakes Water Authority | 3/21 | Mid-June | Permit Work & Short-Term Road Closures |
Adams Road | Long Lake Road to Square Lake Road | Troy and Bloomfield Township | Resurfacing with asphalt; upgrade to Long Lake/Adams Rd traffic signal; new center, left-turn lanes at Vineyards Dr. and Westview Rd; Americans with Disabilities Act-compliant crosswalks; improved drainage; extension of some passing and right-turn lanes. | Yes, southbound Adams Rd will close to through traffic. Northbound Adams Road will remain open. | Southbound traffic detour is Adams Rd to Square Lake Rd to Coolidge Hwy to Long Lake Rd, back to Adams Rd. | Pro-Line Asphalt | 4/4 | Late June | Adams Road |
Avon Road | John R Road to 23 Mile Road; including the Avon/Dequindre Road intersection | Rochester Hills and Shelby Township | Bridge removal and replacement. Project also includes the construction of a roundabout at the Dequindre/Avon Road intersection (expected to start summer of 2022). | Yes; residential, park and business access maintained. | John R Rd to Hamlin Rd to Ryan Rd to 23 Mile Rd, back to Avon/Dequindre Rd. | Z Contractors | 11/1/21 | August of 2022 (bridge and roundabout at Avon/Dequindre Road to reopen to traffic) | Avon Road, Dequindre to 23 Mile Road |
Dequindre Road (part of the Avon Road project) | Dequindre Road from Hamlin Road to 23 Mile Road | Rochester Hills | Closure for the Avon Road bridge demolition and construction of a roundabout at the Dequindre Road/Avon Road intersection. | Yes, access to businesses and residential properties maintained. | Hamlin Rd to Ryan Rd to 23 Mile Rd, back to Dequindre Rd and vice versa. | Z Contractors | 11/1/21 | August of 2022 | Dequindre Road (part of the Avon Road construction project) |
Currie Road | Eight Mile Road to north of Nine Mile Road | Lyon Township and Salem Township | Gravel road paving with asphalt, drainage improvements, concrete curbs and gutters. Project also includes roundabout construction at 8 Mile/Currie Rd and 9 Mile/Currie Rd intersections. | Yes, access to homes maintained. Residents will need to access Currie Road from 9 Mile Road (due to roundabout construction at Eight Mile/Currie Rd intersection). | Currie Road detour is Seven Mile Rd to Napier Road to Ten Mile Rd, back to Currie Rd and vice versa. | Angelo Iafrate | 4/15 | Mid-October | Currie Road |
Currie Road/Eight Mile Road Intersection (Part of the Currie Road Project) | Currie Road/Eight Mile Road intersection | Lyon Township and Salem Township | Construction of a single lane round about at the Currie Road/Eight Mile Road intersection. | Yes, the intersection requires a full closure. | Griswold Rd to Ten Mile Rd to Napier Rd, back to Eight Mile Rd and vice versa. | Angelo Iafrate | 4/15 | Late June (roundabout construction) | Currie Road |
Holcomb Road (part of the Independence Township Road Improvement Millage) | Ellis Road to the Clarkston Village limits | Independence Township | Road resurfacing project. | No; flaggers will direct traffic during the work. | No | Cadillac Asphalt | 4/18 | Late May | Independence Township Road Improvements |
Orchard Lake Road | 13 Mile Road to 14 Mile Road | Farmington Hills | Resurfacing /reconstruction project that includes asphalt paving, concrete replacement, roundabout construction at the Orchard Lake Plaza, four-lane boulevard from Hunters Lane to south of Rexwood St and median construction from Rexwood St to 14 Mile Rd. | Yes, northbound Orchard Lake Rd will close. Southbound Orchard Lake Rd to remain open with business access maintained. | Northbound Orchard Lake Rd traffic detour is 13 Mile Rd to Northwestern Hwy back to Orchard Lake Rd. | M.L. Chartier | 3/21/21 | Late November | Orchard Lake Road, 13 Mile to 14 Mile Road |
Pontiac Trail | Haggerty Road to Green Lake Road | West Bloomfield Township | Removal of existing pavement, asphalt paving, center left-turn lane extension from Green Lake Rd to Parkridge Dr, improved merging of the right lane of EB Pontiac Trl east of Haggerty Rd, and Americans with Disabilities Act-compliant crosswalks. | Yes, residential and business access maintained. | Haggerty Rd to Maple Rd to Drake Rd to Walnut Lake Rd to Halsted Rd, back to Pontiac Trl and vice versa. | DiPonio Construction | 4/18 | Early fall | Pontiac Trail |
Pontiac Trail/Green Lake Road intersection (part of the Pontiac Trail project) | Pontiac Trail and Green Lake Road intersection | West Bloomfield Township | Intersection paving and extension of the SB Green Lake Rd right-turn lane to Pontiac Trl. | Yes, the intersection will close for approximately one month. | Green Lake Rd to Richardson Rd to Haggerty Rd to Maple Rd to Drake Rd to Walnut Lk Rd to Halsted Rd to Pontiac Trl and vice versa. | DiPonio Construction | June, TBA | TBA | Pontiac Trail |
Preservation Overlays (Simple Resurfacing) | Various heavier traveled roads throughout Oakland County | Various | Simple resurfacing with placing 2-2.5 inches of asphalt on the road surface; work is weather-dependent. | No, expect traffic delays. | No | Cadillac Asphalt and Ace-Saginaw Paving | 4/18 | TBA | 2022 Project List |
Union Lake Road Culvert Replacement | Commerce Road to Wise Road | Commerce Township | Removal and replacement of a culvert under the road. Work includes asphalt paving, storm sewer installation, new guardrails and signage. | Yes, business access maintained north and south of the culvert. | Wise Rd to Carroll Lake Rd to Commerce Rd, back to Union Lake Rd and vice versa. | V.I.L. Construction | 4/25 | Late June | Union Lake Road Culvert Replacement |