The following projects may cause traffic delays on Road Commission for Oakland County (RCOC) roads between Oct. 30 and Nov. 6 or may start shortly thereafter. 

It is RCOC’s goal to conduct road improvement projects in a way that interferes with traffic as little as possible. This list includes both Road Commission projects and projects conducted by others, under permit, on roads under the jurisdiction of the Road Commission.

Please note: This information is subject to change. Projects can change from day to day, and traffic delays can develop in a matter of minutes due to weather, emergency situations, etc.

The project list is attached.                                         

Additional information about current and upcoming projects can also be viewed on the RCOC website:   2020 RCOC ROAD CONSTRUCTION PROJECTS (http://www.rcocweb.org/189/Road-Projects).


2020 RCOC Road Construction and Permit Projects (10/30/20 update)

Road

Project Limits

Community or Communities

Project Description

Closure

Detour

Prime Contractor

Start Date

Anticipated Completion

Project Information

*12 Mile Road (Greenfield Road to Coolidge Hwy)

From Greenfield Road to Coolidge Hwy.

Berkley

Resurfacing project, improvements to side street approaches, drainage, install Americans with Disabilities Act-compliant crosswalks, new signage and pavement markings.

No, two-way traffic maintained

No

Pro-Line Asphalt Paving

6/1

Early November

12 Mile Road (Greenfield to Coolidge)

*14 Mile Road (PERMIT PROJECT)

From M-5 to Decker/Novi Road (work is at the 14 Mile/Welch Road  intersection)

Commerce Township and Novi

Water main replacement

Yes

Decker Rd to Maple Rd to M-5, back to 14 Mile Rd and vice versa

Great Lakes Water Authority (Major Cement Company)

11/9

1/11/21

Permit Work and Short-Term Road Closures

Baldwin Road (Phase II)

From Gregory Road to Waldon Road

Orion Township

Reconstruction and widening of Baldwin Road including: 3 roundabouts (Great Lakes Athletic Center, Maybee and Waldon roads), drainage, Americans with Disabilities Act-compliant crosswalks, improved lighting, pedestrian paths, concrete curbs and gutters.

 

 

No, expect lane closures.

No

Dan's Excavating

3/30

November, TBA (behind the curb restoration and landscaping to continue in 2021)

Baldwin Road (Orion Township)

*Clarkston Road

From M-15/Main Street to Flemings Lake Road (work is just west of Steeple Ridge)

 

 

 

Independence Township

Culvert removal and replacement

Yes

M-15/Main St to Waldon Rd to Walters Rd to Flemings Lake Rd, back to Clarkston Rd and vice versa

 

RCOC Hwy Maintenance

10/31

10/31 (evening)

Permit Work and Short-Term Road Closures

Concrete Slab Replacement

Various heavier-traveled roads throughout Oakland County

Various

Remove and replace concrete

Expect lane closures. Floradale Rd from Dixie to Walton in Waterford Twp. is open to NB traffic only through approximately Nov. 9.

No

Cipparrone Contracting

6/15

Late fall

Concrete Slab Replacement

*Davisburg Road (CULVERT REPLACEMENT)

Just east of Oakhurst Road

Springfield Township

Culvert removal and replacement.

Yes

Milford Rd to White Lake Rd to Ormond Rd, back to Davisburg Rd and vice versa.

Aielli Construction

7/31

11/2 (tentatively)

Davisburg Road Culvert Replacement

Dequindre Road

From Utica Road to Collins Avenue

Rochester Hills/Shelby Township border

Reconstruction, widening to 5 lanes including a continuous center left-turn lane, right-turn lanes at major intersections, new concrete curbs/gutters and storm sewers, traffic signal upgrades and Americans with Disabilities Act-compliant crosswalks.

Dequindre Rd north of Auburn Rd to Collins Ave. is closed to through traffic through early November.

Yes. For detour information visit: CLICK HERE

Dan's Excavating

5/18

Late fall

Dequindre Road

*Elizabeth Lake Road (PERMIT PROJECT)

From M-59 to Cass Lake Road

Waterford Township

Sanitary sewer and water main repairs.

Yes, however, business access within the construction zone is maintained.

M-59 to North Cass Lake Rd, back to Elizabeth Lake Rd and vice versa.

Oakland County Office of the Water Resources Commissioner

6/10

10/30, late afternoon (with possible lane closures for pending guardrail work)

 

 

 

Permit Work and Short-Term Road Closures

Fish Lake Road (PERMIT PROJECT)

From Grange Hall Road to Academy Road

Holly Township

Canadian National railroad crossing repairs

Yes

Academy Rd to Oakland St to Saginaw St to Grange Hall Rd, back to Fish Lake Rd and vice versa

Canadian National

11/9

11/23

Permit Work and Short-Term Road Closures

Grand River Avenue Bridge over CSX Railroad

Between Novi Road and Taft Road

City of Novi

Bridge rehabilitation work including replacement of barrier walls, sidewalk replacement, new pedestrian rails along bridge and guardrail.

No, one lane of traffic maintained in each direction. Pedestrian access maintained opposite side of bridge work.

No

Davis Construction Company

6/8

Early December

Grand River Avenue Bridge

*Grange Hall/North Holly Road intersection

Grange Hall Road and North Holly Road intersection

Holly

Milling (grinding of pavement) and replacing with asphalt (work is weather-dependent)

No, expect lane closures and long traffic delays

No

Cadillac Asphalt

11/2

11/5

Spot Resurfacing

*Haggerty Road (PERMIT PROJECT)

North of 8 Mile Road (near Orchard Hill Place)

Novi

Buckeye pipeline repair work

No. Haggerty Road will be reduced to one lane in each direction just north of 8 Mile Road.

No

Buckeye Pipeline

9/9

11/2

Permit Work & Short-Term Road Closures

Nine Mile Road (PERMIT PROJECT)

Nine Mile Road just north of Grand River Avenue

Farmington

Water main repairs

Yes

Grand River Ave to Middlebelt Rd, back to Nine Mile Rd and vice versa

City of Farmington

10/15

11/2

City of Farmington

Pickering Road Culvert Replacements

Pickering Road (3 locations)

Bloomfield Township

Remove and replace three culverts; erosion control; asphalt paving over new culverts; water, gas and sanitary sewer relocation.

No

No

VIL Construction

May-June (utility relocation) and July (culvert work)

 

Substantially complete and open to traffic

Pickering Road Culvert Replacements

Preservation Overlays

Various heavier-traveled roads throughout Oakland County

 

 

 

Various

Simple resurfacing with placing 2-2.5 inches of asphalt on the road surface; work is weather-dependent.

 

 

No

No

Cadillac Asphalt

4/28

Late fall

Preservation Overlays

South Blvd (PERMIT PROJECT)

From Adams Road and Donegal Drive

Rochester Hills and Troy

Water main repairs

Yes

Adams Rd to Square Lake Rd to Coolidge Hwy, back to South Blvd and vice versa

Great Lake Water Authority (Ric-Man Contracting)

10/19

11/2

Permit Work and Short-Term Road Closures

*Southfield/14 Mile Road intersection

Southfield and 14 Mile Road intersection

Beverly Hills and Birmingham

Concrete removal and replacement

No, expect lane closures

No

Cipparrone Contracting

11/2

Late November

Concrete Slab Replacement

Subdivision Roads (special assessment districts)

Various subdivision roads in Oakland County townships

Various townships

Reconstruction and resurfacing road with asphalt.

No

No

Various

Various

Late Fall

Special Assessment District (SAD) Projects

Welch Road (PERMIT PROJECT)

Welch Road just north of 14 Mile Road

Commerce Township

Water main replacement

Yes

14 Mile Rd to Decker Rd to Maple Rd, back to Welch Rd and vice versa

Great Lakes Water Authority (Major Cement Company)

11/11

11/19

Permit Work and Short-Term Road Closures

 *indicates new or updated project; TBA (To Be Announced)