12 Mile Road (Greenfield Road to Coolidge Hwy) | From Greenfield Road to Coolidge Hwy. | Berkley | Resurfacing project, improvements to side street approaches, drainage, install Americans with Disabilities Act-compliant crosswalks, new signage and pavement markings. | No, two-way traffic maintained | No | Pro-Line Asphalt Paving | 6/1 | Mid to late October | 12 Mile Road (Greenfield to Coolidge) |
12 Mile Road (SIGNAL MODERNIZATION PROJECT 2019-2020) | From east of Woodward Avenue (M-1) to west of Connecticut Avenue (west of Campbell Road) | Royal Oak | Upgrades to traffic signals, pedestrian crosswalks/sidewalks and improved street lighting. Project includes 10 locations. | No; however, expect lane closures | No | Dan's Excavating | 10/28/19 (underground infrastructure work) | October, TBA | 12 Mile Signal Modernization Project |
Baldwin Road (Phase II) | From Gregory Road to Waldon Road | Orion Township | Reconstruction and widening of Baldwin Road including: 3 roundabouts (Great Lakes Athletic Center, Maybee and Waldon roads), drainage, Americans with Disabilities Act-compliant crosswalks, improved lighting, pedestrian paths, concrete curbs and gutters. | No, expect lane closures. | No | Dan's Excavating | 3/30 | Late fall of 2020 (behind the curb restoration and landscaping to continue in 2021) | Baldwin Road (Orion Township) |
*Chubb Road (PERMIT PROJECT) | From 9 Mile Road to 10 Mile Road | Lyon Township | Gravel road paving between 10 Mile Road and Hidden River Drive. | Yes; however, residential access will be maintained | 9 Mile Rd to Napier Rd to 10 Mile Rd, back to Chubb Rd and vice versa | Lyon Township | 6/1 | 10/10 | Traffic Alert |
Concrete Slab Replacement | Various heavier-traveled roads throughout Oakland County | Various | Remove and replace concrete | No; however, expect lane closures | No | Cipparrone Contracting | 6/15 | Late fall | Concrete Slab Replacement |
Cooley Lake Road (CULVERT REPLACEMENT) | West of Ford Road from Teeple Creek Lane to just west of Forest Edge Drive | Commerce and White Lake townships | Remove and replace a culvert under the road. | Yes | South Duck Lake Rd to Commerce Rd to Carey Rd, back to Cooley Lake Rd | DiPonio Contracting | 8/5 | Mid-October | Cooley Lake Road Culvert Replacement |
Davisburg Road (CULVERT REPLACEMENT) | Just east of Oakhurst Road | Springfield Township | Culvert removal and replacement. | Yes | Milford Rd to White Lake Rd to Ormond Rd, back to Davisburg Rd and vice versa. | Aielli Construction | 7/31 | Late October | Davisburg Road Culvert Replacement |
*Dequindre Road | From Utica Road to Collins Avenue | Rochester Hills/Shelby Township border | Reconstruction, widening to 5 lanes including a continuous center left-turn lane, right-turn lanes at major intersections, new concrete curbs/gutters and storm sewers, traffic signal upgrades and Americans with Disabilities Act-compliant crosswalks. | Yes, the west side of Auburn Rd at Dequindre Rd is closed through approximately Oct. 19. Additionally, Dequindre north of Auburn Rd to Collins Ave. expected to close to through traffic Oct. 19 through early November. | Yes. For detour information for the west side of Auburn Rd closure at Dequindre Rd AND the closure of Dequindre Rd from Auburn Rd to Collins Ave., visit: CLICK HERE | Dan's Excavating | 5/18 | Late fall | Dequindre Road |
*Elizabeth Lake Road (PERMIT PROJECT) | From M-59 to Cass Lake Road | Waterford Township | Sanitary sewer and water main repairs. | Yes, however, business access within the construction zone is maintained. | M-59 to North Cass Lake Rd, back to Elizabeth Lake Rd and vice versa. | Oakland County Office of the Water Resources Commissioner | 6/10 | November, TBA | Permit Work and Short-Term Road Closures |
Fish Lake Road | From Fenton Road to Elliott Road | Holly and Rose townships | Resurfacing, guardrail replacement and new lane markings. | No | No | Cadillac Asphalt | 10/12 | November (TBA) | Federal Aid Resurfacing |
Grand River Avenue Bridge over CSX Railroad | Between Novi Road and Taft Road | City of Novi | Bridge rehabilitation work including replacement of barrier walls, sidewalk replacement, new pedestrian rails along bridge and guardrail. | No, one lane of traffic maintained in each direction. Pedestrian access maintained opposite side of bridge work. | No | Davis Construction Company | 6/8 | Mid-November | Grand River Avenue Bridge |
Haggerty Road (PERMIT PROJECT) | North of 8 Mile Road (near Orchard Hill Place) | Novi | Buckeye pipeline repair work | No. Haggerty Road will be reduced to one lane in each direction just north of 8 Mile Road. | No | Buckeye Pipeline | 9/9 | Mid to late October due to utility conflicts | Permit Work & Short-Term Road Closures |
Holly Road | From north of Grange Hall Road north to the county border | Holly Township and Village of Holly | 4.5 miles of asphalt resurfacing, reconstruction of road in three areas to improve drainage, reconstruction of the retaining wall/hill adjustment north of the Belford Road intersection, safety improvements on curves, new guardrail and culvert maintenance. | Yes, access to businesses, cemetery and homes maintained. Holly Road from Belford to Ray Rd (Genesee County line) closed Sept. 14 through mid-October. | Baldwin Rd (Genesee County) to Dixie Hwy. to Grange Hall Road, back to Holly Road and vice versa. | Ajax | 6/23 | Mid-October (expected to be open to traffic) | Holly Road |
Pickering Road Culvert Replacements | Pickering Road (3 locations) | Bloomfield Township | Remove and replace three culverts; erosion control; asphalt paving over new culverts; water, gas and sanitary sewer relocation. | Yes, Fairhill Rd will close at Pickering Rd from July 24 through late September | Detour for Fairhill Rd traffic: Pickering Rd to Kingswood Dr, back to Fairhill Rd and vice versa | VIL Construction | May-June (utility relocation) and July (culvert work) | Late fall | Pickering Road Culvert Replacements |
Preservation Overlays | Various heavier-traveled roads throughout Oakland County | Various | Simple resurfacing with placing 2-2.5 inches of asphalt on the road surface; work is weather-dependent | No | No | Cadillac Asphalt | 4/28 | TBA | Preservation Overlays |
*Sashabaw Road (CULVERT REPLACEMENT) | Whipple Lake Canal, just south of the Sashabaw Road/Pine Knob Road intersection | Independence Township | Remove and replace a culvert under the road. | Yes | Clarkston Rd to Baldwin Rd to Seymour Lake Rd, back to Sashabaw Rd and vice versa | Dan's Excavating | 8/11 | Late October | Sashabaw Road Culvert Replacement |
South Blvd (PERMIT PROJECT) | Between Adams Road and Donegal Drive | Rochester Hills and Troy | Water main repairs | Yes | Adams Rd to Square Lake Rd to Coolidge Hwy, back to South Blvd and vice versa | Great Lake Water Authority (Ric-Man Contracting) | TBA | TBA | Permit Work and Short-Term Road Closures |
Spot Resurfacing | Various heavier-traveled roads throughout Oakland County | Various | Milling (grinding of pavement) on smaller sections of roads and paving with asphalt. Work is weather-dependent. | No | No | Florence Cement, Pro Line Asphalt and Cadillac Asphalt | 4/20 | TBA | Spot Resurfacing |
Subdivision Roads (special assessment districts) | Various subdivision roads in Oakland County townships | Various townships | Reconstruction and resurfacing road with asphalt. | No | No | Various | Various | Late Fall | Special Assessment District (SAD) Projects |
Welch Road (PERMIT PROJECT) | Welch Road just north of 14 Mile Road | Commerce Township | Water main replacement | Yes | 14 Mile Rd to Decker Rd to Maple Rd, back to Welch Rd and vice versa | Great Lakes Water Authority (Major Cement Company) | TBA | TBA | Permit Work and Short-Term Road Closures |