12 Mile Road (Greenfield Road to Coolidge Hwy) | From Greenfield Road to Coolidge Hwy. | Berkley | Resurfacing project, improvements to side street approaches, drainage, install Americans with Disabilities Act-compliant crosswalks, new signage and pavement markings. | No, two-way traffic maintained | No | Pro-Line Asphalt Paving | 6/1 | Mid to late October | 12 Mile Road (Greenfield to Coolidge) |
12 Mile Road (SIGNAL MODERNIZATION PROJECT 2019-2020) | From east of Woodward Avenue (M-1) to west of Connecticut Avenue (west of Campbell Road) | Royal Oak | Upgrades to traffic signals, pedestrian crosswalks/sidewalks and improved street lighting. Project includes 10 locations. | No; however, expect lane closures | No | Dan's Excavating | 10/28/19 (underground infrastructure work) | October, TBA | 12 Mile Signal Modernization Project |
Baldwin Road (Phase II) | From Gregory Road to Waldon Road | Orion Township | Reconstruction and widening of Baldwin Road including: 3 roundabouts (Great Lakes Athletic Center, Maybee and Waldon roads), drainage, Americans with Disabilities Act-compliant crosswalks, improved lighting, pedestrian paths, concrete curbs and gutters. | No, expect lane closures. | No | Dan's Excavating | 3/30/20 | Late fall of 2020 (behind the curb restoration and landscaping to continue in 2021) | Baldwin Road (Orion Township) |
Chubb Road (PERMIT PROJECT) | From 9 Mile Road to 10 Mile Road | Lyon Township | Gravel road paving between 10 Mile Road and Hidden River Drive. | Yes; however, residential access will be maintained | 9 Mile Rd to Napier Rd to 10 Mile Rd, back to Chubb Rd and vice versa | Lyon Township | 6/1 | Mid-October | Traffic Alert |
Concrete Slab Replacement | Various heavier-traveled roads throughout Oakland County | Various | Remove and replace concrete | No; however, expect lane closures | No | Cipparrone Contracting | 6/15 | Late fall | Concrete Slab Replacement |
Cooley Lake Road (CULVERT REPLACEMENT) | West of Ford Road from Teeple Creek Lane to just west of Forest Edge Drive | Commerce and White Lake townships | Remove and replace a culvert under the road. | Yes | South Duck Lake Rd to Commerce Rd to Carey Rd, back to Cooley Lake Rd | DiPonio Contracting | 8/5 | Mid-October | Cooley Lake Road Culvert Replacement |
Davisburg Road (CULVERT REPLACEMENT) | Just east of Oakhurst Road | Springfield Township | Culvert removal and replacement. | Yes | Milford Rd to White Lake Rd to Ormond Rd, back to Davisburg Rd and vice versa. | Aielli Construction | 7/31/20 | Fall, TBA | Davisburg Road Culvert Replacement |
Dequindre Road | From Utica Road to Collins Avenue | Rochester Hills/Shelby Township border | Reconstruction, widening to 5 lanes including a continuous center left-turn lane, right-turn lanes at major intersections, new concrete curbs/gutters and storm sewers, traffic signal upgrades and Americans with Disabilities Act-compliant crosswalks. | Yes, the west side of Auburn Rd at Dequindre Rd is closed through early Nov. | Yes, the west side closure of Auburn Rd at Dequindre is closed until early Nov. The detour is: Dequindre Rd to Hamlin Rd to John R, back to Auburn Rd and vice versa | Dan's Excavating | 5/18 | Late fall | Dequindre Road |
Elizabeth Lake Road (PERMIT PROJECT) | From M-59 to Cass Lake Road | Waterford Township | Sanitary sewer and water main repairs. | Yes, however, business access within the construction zone is maintained. | M-59 to North Cass Lake Rd, back to Elizabeth Lake Rd and vice versa. | Oakland County Office of the Water Resources Commissioner | 6/10 | Fall, TBA | Permit Work and Short-Term Road Closures |
*Fish Lake Road | From Fenton Road to Elliott Road | Holly and Rose townships | Resurfacing, guardrail replacement and new lane markings. | No | No | Cadillac Asphalt | 10/12 | November (TBA) | Federal Aid Resurfacing |
Grand River Avenue Bridge over CSX Railroad | Between Novi Road and Taft Road | City of Novi | Bridge rehabilitation work including replacement of barrier walls, sidewalk replacement, new pedestrian rails along bridge and guardrail. | No, one lane of traffic maintained in each direction. Pedestrian access maintained opposite side of bridge work. | No | Davis Construction Company | 6/8 | Mid-November | Grand River Avenue Bridge |
Grass Lake Road
| From Ormond Road to Steeple Hill Road
| White Lake Township
| Gravel road paving with asphalt, improved drainage, some realignment of road and new guardrail installation.
| No
| No
| Dan's Excavating
| 5/4
| COMPLETE | Grass Lake Road |
Haggerty Road (PERMIT PROJECT) | North of 8 Mile Road (near Orchard Hill Place) | Novi | Buckeye pipeline repair work | No. Haggerty Road will be reduced to one lane in each direction just north of 8 Mile Road. | No | Buckeye Pipeline | 9/9 | Mid to late October due to utility conflicts | Permit Work & Short-Term Road Closures |
Holly Road | From north of Grange Hall Road north to the county border | Holly Township and Village of Holly | 4.5 miles of asphalt resurfacing, reconstruction of road in three areas to improve drainage, reconstruction of the retaining wall/hill adjustment north of the Belford Road intersection, safety improvements on curves, new guardrail and culvert maintenance. | Yes, access to businesses, cemetery and homes maintained. Holly Road from Belford to Ray Rd (Genesee County line) closed Sept. 14 through mid-October. | Baldwin Rd (Genesee County) to Dixie Hwy. to Grange Hall Road, back to Holly Road and vice versa. | Ajax | 6/23 | Mid-October (expected to be open to traffic) | Holly Road |
Pickering Road Culvert Replacements | Pickering Road (3 locations) | Bloomfield Township | Remove and replace three culverts; erosion control; asphalt paving over new culverts; water, gas and sanitary sewer relocation. | Yes, Fairhill Rd will close at Pickering Rd from July 24 through late September | Detour for Fairhill Rd traffic: Pickering Rd to Kingswood Dr, back to Fairhill Rd and vice versa | VIL Construction | May-June (utility relocation) and July (culvert work) | Late fall | Pickering Road Culvert Replacements |
Preservation Overlays | Various heavier-traveled roads throughout Oakland County | Various | Simple resurfacing with placing 2-2.5 inches of asphalt on the road surface; work is weather-dependent | No | No | Cadillac Asphalt | 4/28/20 | TBA | Preservation Overlays |
Sashabaw Road (CULVERT REPLACEMENT) | Whipple Lake Canal, just south of the Sashabaw Road/Pine Knob Road intersection | Independence Township | Remove and replace a culvert under the road. | Yes | Clarkston Rd to Baldwin Rd to Seymour Lake Rd, back to Sashabaw Rd and vice versa | Dan's Excavating | 8/11 | Early November | Sashabaw Road Culvert Replacement |
South Blvd (PERMIT PROJECT) | Between Adams Road and Donegal Drive | Rochester Hills and Troy | Water main repairs | Yes | Adams Rd to Square Lake Rd to Coolidge Hwy, back to South Blvd and vice versa | Great Lake Water Authority (Ric-Man Contracting) | TBA | TBA | Permit Work and Short-Term Road Closures |
Spot Resurfacing | Various heavier-traveled roads throughout Oakland County | Various | Milling (grinding of pavement) on smaller sections of roads and paving with asphalt. Work is weather-dependent. | No | No | Florence Cement, Pro Line Asphalt and Cadillac Asphalt | 4/20/20 | TBA | Spot Resurfacing |
Subdivision Roads (special assessment districts) | Various subdivision roads in Oakland County townships | Various townships | Reconstruction and resurfacing road with asphalt. | No | No | Various | Various | Late Fall | Special Assessment District (SAD) Projects |
Welch Road (PERMIT PROJECT) | Welch Road just north of 14 Mile Road | Commerce Township | Water main replacement | Yes | 14 Mile Rd to Decker Rd to Maple Rd, back to Welch Rd and vice versa | Great Lakes Water Authority (Major Cement Company) | 10/5 | 10/9 | Permit Work and Short-Term Road Closures |