12 Mile Road | From Greenfield Road to Coolidge Road | Berkley | Resurfacing project, improvements to side street approaches, drainage, install Americans with Disabilities Act-compliant crosswalks, new signage and pavement markings. 12 Mile Road from Greenfield Road to Ellwood Avenue will be reconstructed. | Yes, 12 Mile Road from Greenfield to Ellwood Avenue will close (date TBA). Remaining portion will be open to two-way traffic. | TBA | Pro-Line Asphalt Paving | TBA | TBA | 12 Mile Road (Greenfield to Coolidge) |
12 Mile Road (SIGNAL MODERNIZATION PROJECT 2019-2020) | From east of Woodward Avenue (M-1) to west of Connecticut Avenue (west of Campbell Road) | Royal Oak | Upgrades to traffic signals, pedestrian crosswalks/sidewalks and improved street lighting. Project includes 10 locations. | No; however, expect lane closures | No | Dan’s Excavating | 10/28/19 (underground infrastructure work) | TBA, 2020 | 12 Mile Signal Modernization Project |
Baldwin Road (Phase II) | From Gregory Road to Waldon Road | Orion Township | Reconstruction of Baldwin Road including: 3 roundabouts (Great Lakes Athletic Center, Maybee and Waldon roads), drainage, widening, Americans with Disabilities Act-compliant crosswalks, improved lighting, pedestrian paths, concrete curbs and gutters. | Waldon and Maybee roads are both closed at the west side of Baldwin Road; Baldwin Road remains open to traffic | Yes, for the Maybee and Waldon Road detours, visit: http://www.rcocweb.org/329/Baldwin-Road | Dan’s Excavating | 3/30/20 (West Maybee and Waldon roads closed at the west side of Baldwin expected to reopen in July 2020, date TBA | Late fall of 2020 (possible behind the curb restoration work could take place in 2021) | Baldwin Road (Orion Township) |
Concrete Slab Replacement | Various heavier-traveled roads throughout Oakland County | Various | Remove and replace concrete | No; however, expect lane closures | No | Cipparrone Contracting | Late May, date TBA | TBA | Concrete Slab Replacement |
*Davisburg Road (CULVERT REPLACEMENT) | Just east of Oakhurst Road | Springfield Township | Culvert removal and replacement | Yes | TBA | Aielli Construction | TBA | TBA | Davisburg Road Culvert Replacement |
*Dequindre Road | From Utica Road to Collins Avenue | Rochester Hills/Shelby Township border | Reconstruction, widening to 5 lanes including a continuous center left-turn lane, right-turn lanes at major intersections, new concrete curbs/gutters storm sewers, traffic signal upgrades and Americans with Disabilities Act-compliant crosswalks. | TBA (expect short-term closures of the Dequindre and Auburn intersection and Dequindre north of Auburn; dates TBA) Dequindre Rd will be mostly open to two-way traffic | TBA | TBA | May, TBA | Late fall | Dequindre Road |
Dixboro Road | From 8 Mile Road to 9 Mile Road | Lyon Township, Green Oak Township and South Lyon | Paving gravel road with asphalt, improved drainage, new signage, guardrail replacement, new curbs and gutters | Yes | 9 Mile Road to Pontiac Trail to 8 Mile Rd, back to Dixboro Rd and vice versa (residential and Volunteer Park access maintained) | Dan’s Excavating | 3/30/20 | Summer TBA | Dixboro Road |
Grass Lake Road | From Ormond Road to Steeple Hill Road | White Lake Township | Gravel road paving with asphalt, improved drainage, some realignment of road and new guardrail installation | Yes, however, residential access will be maintained | Ormond Road to M-59 (Highland Road) to Hill Road, back to Grass Lake Road and vice versa | Dan’s Excavating | 5/4/20 | Late October | Grass Lake Road |
Heights Road (PERMIT PROJECT) | From M-24 (Lapeer Road) to Bellevue Avenue | Village of Lake Orion and Orion Township | Water main replacement | Yes | Pinetree Road to Clarkston Road to M-24 (Lapeer Road), back to Heights Road and vice versa | Village of Lake Orion | 4/20/20 | 6/20/20 | Traffic Alert |
Holly Road | From north of Grange Hall Road north to the county border | Holly Township and Village of Holly | 4.5 miles of asphalt resurfacing, reconstruction of road in three areas to improve drainage, reconstruction of the retaining wall/hill adjustment north of the Belford Road intersection, safety improvements on curves, new guardrail and culvert maintenance. | Yes, access to business and homes maintained | Holly Road to Grange Hall Road to Dixie Hwy to Baldwin Road (Genesee County), back to Holly Road and vice versa | TBA | June TBA | Late Fall | Holly Road |
*Independence Township Road Resurfacing Projects (funded by a millage) | Various heavier traveled/primary roads in Independence Township | Independence Township | Resurfacing of various roads (Andersonville, Sashabaw, Waldon and Clintonville roads this year) | No | No | Cadillac Asphalt | 5/11/20 tentatively (beginning with Andersonville Road from Old White Lake Road to the township border) | TBA | Independence Township Road Improvements |
Maple Road and Middlebelt Road | Maple Road and Middlebelt Road intersection (roundabout construction) | West Bloomfield Township | Concrete work on the roundabout, behind the curb restoration and installation of pedestrian crosswalk signals | Yes, Maple Road is closed at Middlebelt Road | Inkster Road to Walnut Lake Road to Orchard Lake Road, back to Maple Road and vice versa | Angelo Iafrate | 4/27/20 | Late June | Maple and Middlebelt Roundabout Construction |
Middlebelt Road (PERMIT PROJECT) | From 9 Mile Road to 10 Mile Road (project is just between 9 Mile and Grayfield Drive) | Farmington Hills | Consumers Energy gas main replacement | Yes, however, residential and business access will be maintained | 9 Mile Road to Grand River Avenue to Orchard Lake Road to 10 Mile Road, back to Middlebelt Road and vice versa | Consumers Energy | 4/27/20 | 6/29/20 | Traffic Alert |
Pickering Road Culvert Replacements | Pickering Road (3 locations) | Bloomfield Township | Remove and replace three culverts; erosion control; asphalt paving over new culverts; water, gas and sanitary sewer relocation | No, access to homes will be maintained | No | VIL Construction | Utility relocation will take place April -June. Culvert replacement is expected to begin in June, date TBA. | Late fall | Pickering Road Culvert Replacements |
Preservation Overlays | Various heavier-traveled roads throughout Oakland County | Various | Simple resurfacing with placing 2-2.5 inches of asphalt on the road surface; work is weather-dependent | No | No | Cadillac Asphalt | 4/28/20 | TBA | Preservation Overlays |
*Sashabaw Road (CULVERT REPLACEMENT) | Whipple Lake Canal, just south of the Sashabaw Road/Pine Knob Road intersection | Independence Township | Remove and replace a culvert under the road | Yes | TBA | Dan’s Excavating | August, TBA | TBA | Sashabaw Road Culvert Replacement |
Spot Resurfacing | Various heavier-traveled roads throughout Oakland County | Various | Milling (grinding of pavement) on sections of roads and paving with asphalt. Work is weather-dependent | No | No | Florence Cement, Pro Line Asphalt and Cadillac Asphalt | 4/20/20 | TBA | Spot Resurfacing |
Subdivision Roads (Special Assessment District) | Various subdivision roads in Oakland County townships | Various townships | Reconstruction and resurfacing road with asphalt | No | No | Various | Various | Late Fall | Special Assessment District (SAD) Projects |