14 Mile Road (PERMIT PROJECT) | Eastbound 14 Mile Road, just east of I-75 from Concord Street to John R Road | Madison Heights and Troy | Consumers Energy gas main relocation. | EB 14 Mile Rd is closed between Concord St. and John R Rd. WB 14 Mile Rd remains open to traffic. Business access maintained off of Mandoline Ave. The EB 14 Mile crossover to Elliott St/Oakland Mall remains accessible. | EB 14 Mile Rd detour is Stephenson Hwy to 12 Mile Rd to John R Rd, back to 14 Mile Rd. | Consumers Energy | 11/17 | Late November | Consumers Energy |
*14 Mile Road (PERMIT PROJECT) | Just west of the Novi Road/Decker Road intersection. | Novi and Walled Lake | The eastbound right lane on 14 Mile Road, just west of the Novi Road/Decker Road intersection, is closed for Great Lakes Water Authority watermain work. | No; expect a lane shift in the work zone. | No. | Great Lakes Water Authority | 10/3 | Late November | Great Lakes Water Authority |
Clarkston Road (PERMIT PROJECT) | Adams Road to Lake George Road | Oakland Township | Drainage improvements, storm sewer installation and gravel road paving by private developers. | Yes. Residential and business access will be maintained. | Lake George Rd to Stoney Creek Rd to Adams Rd, back to Clarkston Rd and vice versa. | Ajax Paving | 8/4 | 11/23 (the road will close again in the spring of 2023 for paving) | Permit Work & Short-Term Road Closures |
*Hatchery Road | Dixie Highway to Airport Road (the work is just west of Frembes Road) | Waterford Township | Bridge replacement over the Clinton River, culvert replacement west of the bridge, demolition of the wooden pedestrian bridge (new bridge will facilitate pedestrians) and new guardrails. | The road is closed over the Clinton River. Residential access maintained east and west of the bridge. | Dixie Hwy to Williams Lake Rd to Airport Rd, back to Hatchery Rd and vice versa. | Toebe Construction | 6/13 | Late November (the road will open once paving and guardrail installation are completed) | Hatchery Road Bridge Replacement over the Clinton River |
Joint Repairs | Various heavier traveled roads. | Commerce Township, Highland Township, Novi, Troy and Wixom | Milling (grinding pavement) road joints and paving with asphalt. | No. During the work, the roads will remain open with flaggers directing traffic. | No | Cadillac Asphalt | 6/16 | Late November | Joint Repairs |
Long Lake Road (PERMIT PROJECT) | North and south legs of Franklin Road (closure is between Groton Road and Pine Tree Trail) | Bloomfield Township | Bloomfield Township sanitary sewer work. | Yes, Long Lake Rd, just east of the south leg of Franklin Rd, is closed. Residential and business access maintained. | Telegraph Rd to Lone Pine Rd to Franklin Rd, back to Long Lake Rd and vice versa. Pine Tree Trl and Groton Rd residential access maintained from Franklin Rd. | Bloomfield Township | 9/19 | Late November | Bloomfield Township |
Maloney Street Bridge Replacement | North of Drahner Road over Clear Lake and Long Lake | Oxford Township | Removal and replacement of a bridge. | The waterway under the bridge is closed to boats and other recreational traffic during the project. Residential access maintained. | No, residential access is maintained via a single-lane temporary road. | F.H. Paschen | 7/5 | Late November | Maloney Street Bridge Replacement |
*Orchard Lake Road | Middlebelt Road to Old Telegraph Road | Sylvan Lake, West Bloomfield Township, Bloomfield Township and Pontiac | Road resurfacing work including asphalt paving, concrete slab replacements, Americans with Disabilities Act-compliant crosswalks, traffic signal upgrades, drainage improvements and widening east of Middlebelt Rd to accommodate a center left-turn lane. | No; one lane will remain open in each direction. | No | Florence Cement | 6/27 | 11/23 (the road will fully open to traffic once the final layer of asphalt is placed and striping completed) | Orchard Lake Road, Middlebelt to Old Telegraph Road |
Preservation Overlays (Simple Resurfacing)
| Various heavier traveled roads throughout Oakland County
| Various
| Simple resurfacing with placing 2-2.5 inches of asphalt on the road surface; work is weather-dependent.
| No, expect traffic delays.
| No
| Cadillac Asphalt
| 4/18
| MAINLINE PAVING COMPLETE | 2022 Project List |
*Ten Mile Road | Haggerty Road to Meadowbrook Road (closure is west of Bethany Way to just west of Nilan Drive) | Novi | Remove and replace culverts under the road. Bishop Creek culvert, just west of Bethany Way, will be removed and replaced starting Dec. 6, followed by the Ingersol Creek culvert located just west of Nilan Drive. Projects will be done separately. | Yes. Residential and business access maintained east and west of the culverts. | Novi Rd to Grand River Ave to Haggerty Rd, back to Ten Mile Rd and vice versa. | Toebe Construction | 12/6 | 4/17 (approximate) The Ten Mile Road project, Meadowbrook to Haggerty Road, will continue in the spring of 2023 through the fall. | Ten Mile Road |
Walton Blvd.
| Sashabaw Road to Clintonville Road
| Waterford Township
| Removal of existing concrete, resurfacing with asphalt, minor drainage improvements, Americans with Disabilities Act (ADA)-compliant crosswalks, traffic signal upgrade at Mason School entrance and replacement of some curbs and gutters.
| No.
| No.
| Ajax Paving
| 7/25
| COMPLETE | Walton Blvd. |