2021 Walton Blvd. Reconstruct

◄ Back To All Albums ◄ Back To Thumbnails View slideshow of other photos in this album
Thumbs up Hot mix asphalt being dumped into paver on Walton Blvd. between Sashabaw Rd. and Dixie Hwy. in Waterford Township

Hot mix asphalt being dumped into paver on Walton Blvd. between Sashabaw Rd. and Dixie Hwy. in Waterford Township

This photo was taken on August 4, 2021.

View Full Size