10 Mile Road | From Evergreen Road to Greenfield Road | Southfield | Concrete slab removal and replacement, curb/gutter installation, Americans with Disabilities Act-compliant crosswalks and upgraded bus stops. Access to businesses maintained throughout the project. | No; expect lane closures. During Phase 1, left-turns will be prohibited on Southfield Road to 10 Mile Road, date TBA. | No | Mark Anthony Contracting | 7/15/19 | Late Fall | 10 Mile Road Concrete Slab Replacement |
10 Mile Road (PERMIT PROJECT) | East of Telegraph Road at Berg Road | Southfield | Sanitary sewer rehabilitation | No, westbound right (outside) lane is closed near Berg Road; traffic shifted to the open lane | No | Oakland County Office of Water Resources Commissioner | 7/30/19 | Late August | Oakland County WRC |
12 Mile and Novi Road intersection | 12 Mile Road and Novi Road intersection (including work on Novi Road approaches to intersection) | Novi | Concrete slab replacement, Americans with Disabilities Act-compliant sidewalk ramps and upgrades to the pedestrian signals | Northbound and southbound Novi Rd are closed at 12 Mile Rd; one lane in each direction will remain open on 12 Mile Rd. | Yes, for Novi Rd traffic the detour is Grand River Avenue to Meadowbrook Road to 13 Mile Rd, back to Novi Road and vice versa | Mark Anthony Contracting | 6/17/19 | Mid-September | 12 Mile/Novi Road Intersection |
12 Mile Road
| Eastbound right (outside) lane of 12 Mile Road at Pierce Street
| Southfield
| Concrete slab removal and replacement. The eastbound right (outside) lane of 12 Mile is closed at Pierce Street. Pierce Street approach to 12 Mile (south side) is closed. Pierce Street north of 12 Mile remains open.
| Yes, residents on Pierce Street south of 12 Mile Road will need find alternate route.
| No; however, Pierce Street traffic will need to find an alternate route, road closed at 12 Mile Road
| Florence Cement
| 8/15/19
| COMPLETE | Concrete Slab Replacement |
12 Mile Road (PERMIT PROJECT) | West of Telegraph at Case Avenue | Southfield | Underground utility work | No | No; however, the right (outside) eastbound lane on 10 Mile Road at Case Avenue is closed | AT&T | 5/10/19 | Late August | Traffic Alert |
Adams Road and Gunn Road | Adams Road and Gunn Road intersection (roundabout construction) | Oakland Township | Construction of a roundabout, drainage improvements, curb/gutter installation, High-Intensity Activated Crosswalk (HAWK) pedestrian crossing beacons installed at crosswalks on the north leg of the roundabout | Yes, intersection is closed to traffic | For detour routes: CLICK HERE | M.L. Chartier | 6/17/18 | Late August | Adams and Gunn Road Roundabout |
Adams Road bridges (work to be done during the Adams/Gunn roundabout construction) | North of Gunn Road to Orion Road | Oakland Township | Preventative maintenance including bridge approach improvements, epoxy overlay on bridge deck, paving with hot mix asphalt and new guardrail | Yes; however, residential traffic will be maintained | Orion Rd to Silverbell Rd, back to Adams Rd and vice versa | Florence Cement | 6/17/19 | Late August | Adams Road Bridges |
*Baldwin Road | From the Pontiac/Auburn Hills city limits to south of I-75 entrance ramps | Auburn Hills | Remove and replace concrete slabs | No | No; however, expect lane closures | Florence Cement | TBA | Mid-October | Concrete Slab Replacements |
Baldwin Road (Phase I) (carryover project from 2018) | From Morgan Road to Gregory Road | Orion Township | Behind the curb and driveway restoration; street lighting (DTE); Americans with Disabilities Act -compliant crosswalks/ sidewalks and new sign installation | No; however, expect lane closures | No | Dan's Excavating | 4/8/2019 | Substantially complete and open to traffic | Baldwin Road |
Baldwin Road (Phase II) | From Gregory Road to Waldon Road | Orion Township | Reconstruction of Baldwin Road including: 3 roundabouts (Great Lakes Athletic Center, Maybee and Waldon roads), drainage, widening, Americans with Disabilities Act-compliant crosswalks, improved lighting, pedestrian paths, concrete curb and gutter. | Maybee Road is closed at Baldwin Road; Baldwin Road remains open to traffic | Yes, for Maybee Road detours: CLICK HERE | Dan's Excavating | 6/17/19 | 2020, TBA (seasonal shutdown of work will take place in late fall of 2019 and restart in the spring of 2020) | Baldwin Road (Orion Township) |
Maybee Road at Baldwin Road (Part of the Baldwin Road Phase II construction) | Maybee Road and Baldwin Road eastbound and westbound approaches | Orion Township | Eastbound and westbound Maybee Road at Baldwin Road are closed for roundabout construction. The east approach of Waldon Road to Baldwin Road is expected to close in September, date and detour TBA | Yes; however, two-way traffic is maintained on Baldwin Rd | For detour routes: CLICK HERE | Dan's Excavating | 7/11/19 | Late Fall | Baldwin Road |
*Waldon Road east half at Baldwin Road (Part of the Baldwin Road Phase II construction) | Waldon Road east half at Baldwin Road | Orion Township | Roundabout construction | Yes, TBA (west half of intersection at Baldwin Road will remain open to traffic) | EB detour is Baldwin Rd to Brown Rd to Joslyn Rd, back to Waldon Rd. WB detour is Joslyn Rd to Clarkston Rd to Baldwin Rd, back to Waldon Rd. | Dan's Excavating | TBA | TBA | Baldwin Road |
Carroll Lake/Cooley Lake Road intersection | Carroll Lake Road and Cooley Lake Road intersection | Commerce and White Lake townships | Construction of a mini roundabout | Yes, intersection is closed | For detour routes: CLICK HERE | Commerce Construction and Landscaping Inc | 7/15/19 | 9/6/19 | Carroll Lake/Cooley Lake Road Roundabout |
Central Drive | From Indianwood Road to the Village of Lake Orion limits | Orion Township | Pulverizing existing road surface, asphalt paving, some guardrail replacement and minor drainage improvements | No | No | Asphalt Specialists Inc | 8/5/19 | Mid-September mainline paving completion | Central Drive |
Concrete Slab Replacement | Various heavier traveled roads throughout Oakland County | Various | Remove and replace concrete | No; however, expect lane closures | No | Florence Cement | 5/6/19 | TBA | Concrete Slab Replacement |
Dixie Hwy | From Oakhill Road to the county line | Groveland, Holly and Springfield townships | Resurfacing with additional drainage work and guardrail replacement between Tindall and Gail Drive | No | No | Ace-Saginaw Paving Company | 7/29/19 | Mid- September | Federally Funded Overlays |
Fish Lake Road
| Just south of Academy Road
| Village of Holly and Holly Township
| Culvert removal and replacement
| Yes
| Academy Rd to Saginaw St to Maple St to Broad St to South Fenton Rd, back to Fish Lake Rd and vice versa
| RCOC Hwy Maintenance
| 8/24/19 (in case of inclement weather, project will take place on 8/25/19
| COMPLETE | Weekend, Emergency & Short-Term Road Closures |
Haggerty Road and 14 Mile Road intersection (PERMIT PROJECT)
| Haggerty Road and 14 Mile Road intersection
| Novi, Farmington Hills, West Bloomfield Township and Commerce Township border
| Adding a right-turn lane from SB Haggerty Rd to WB 14 Mile Rd and upgrades to sidewalks and pedestrian crosswalks to comply with the Americans with Disabilities Act
| No; however, left-turns are prohibited from NB and SB Haggerty Rd to 14 Mile Rd. SB Haggerty traffic is shifted to the left-turn lane.
| No
| City of Novi
| 7/18/19
| COMPLETE | Traffic Alert |
Haggerty Road over the Seeley Drain | From 13 Mile to 14 Mile Road (culvert is located between Lilly Court and MacKenzie Drive) | Farmington Hills and Novi | Remove and replace a culvert under the road that carries the Seeley Drain | Yes | 13 Mile Rd to M-5 to 14 Mile Rd, back to Haggerty Rd and vice versa | DiPonio Contracting | September, TBA | TBA | Haggerty Road Culvert Replacement over the Seeley Drain |
Heights Road (PERMIT PROJECT) | US 24 (N Broadway St) to Bellevue Avenue | Village of Lake Orion and Orion Township | Water main replacement | Yes | For detour routes: CLICK HERE | Fontana Construction | TBA | TBA | Village of Lake Orion |
John R (southbound John R from Long Lake to Square Lake Road is closed) | Long Lake Road to Square Lake Road | Troy | Reconstruction to a 3-lane road with a continuous center left-turn lane, drainage improvements, sewer/water improvements, curb/gutter installation, asphalt path (west side) and Americans with Disabilities Act- compliant sidewalks/crossings (east side). | Yes, southbound John R is closed | Southbound John R detour is South Blvd to Dequindre Rd, to Long Lake Rd, back to John R; northbound John R remains open to traffic | Dan's Excavating | 4/29/19 | Late fall | John R |
*Lahser and 13 Mile Road intersection (PERMIT PROJECT) | Lahser Road and 13 Mile Road intersection | Beverly Hills | Consumers Energy high pressure gas main work | No, expect lane closures | No | Consumers Energy | 7/16/19 | 8/30/19 (expected) | Consumers Energy |
Livernois Road | From Avon Road to north of Walton | Rochester Hills | Reconstruction of road, improved drainage, traffic-signal modernization, upgrading sidewalks to comply with Americans with Disabilities Act, new guardrail, retaining wall repairs and replacing curbs and gutters | Yes, southbound Livernois is closed to traffic. Northbound Livernois will remain open to traffic | The detour for southbound Livernois traffic is Tienken Rd to Adams Rd to Avon Rd back to Livernois Rd | Pro-Line Asphalt | 6/21/19 | Late Fall | Livernois Road |
Maple Road (PERMIT PROJECT & PART OF MDOT'S I-75 RECONSTRUCTION PROJECT) | Westbound Maple Road under I-75 | Troy | Westbound outside (right) lane of Maple Road is closed under I-75 for AT&T utility relocation; traffic shifted to the inside (left) lane in the work zone. | No; however, the WB outside (right) lane on Maple Road is closed under I-75; traffic shifted to inside (left) lane. | No | AT&T | 8/9/19 | 9/13/19 | MDOT Modernize 75 |
Maple Road and Middlebelt Road | Maple Road and Middlebelt Road intersection (roundabout construction) | West Bloomfield Township | Construction of a roundabout, improved drainage, new watermain and Americans with Disabilities Act-compliant crosswalks. | Yes, intersection is expected to close in September | For detour routes: CLICK HERE | Angelo Iafrate | September, TBA | Late Fall | Maple and Middlebelt Roundabout Construction |
Maple Road Culvert (PART OF THE MAPLE AND MIDDLEBELT ROAD ROUNDABOUT CONSTRUCTION) | From Middlebelt Road to Inkster Road (culvert is between Glenway Drive and Bloomfield Glens Road) | West Bloomfield Township | Removal and replacement of a culvert under the road that carries Rouge River Tributary | Yes, Maple Road is closed between Middlebelt and Inkster roads | Inkster Rd to 14 Mile Rd to Middlebelt Rd, back to Maple Rd and vice versa | Angelo Iafrate | 6/29/19 | September, TBA | Maple Road Culvert |
Middlebelt Road (PERMIT PROJECT) | From 12 Mile Road to 13 Mile Road (emergency repair is just south of Orion Court) | Farmington Hills | Emergency road repairs | TBA | TBA | Office of the Oakland County Water Resources Commissioner | TBA | TBA | Traffic Alerts |
*Milford Road | Just east of South Fenton Road and the railroad tracks | Rose Township | Culvert removal and replacement. Includes paving road, new guardrail and pavement markings | Yes, residential access will be maintained east of the culvert | Milford Rd to Clyde Rd to Hickory Ridge Rd to Fenton Rd, back to Milford Rd and vice versa | Zito Construction | 9/16/19 | Mid-October | Milord Road Culvert |
*Oakley Park Road | From Commerce Road to Benstein Road (east and west of Sutton Lane) | Commerce Township | High-friction surface treatment on the curvy section of the road to provide better traction for vehicles. Process involves cleaning road surface, apply an epoxy and covering with coarse aggregate. | No; however, expect lane closures with flaggers directing traffic | No | Smith's Waterproofing | 9/3/19 (weather-dependent) | 9/5/19 | High-Friction Surface Control |
Oakwood Road | From M-15 to Leece Road | Ortonville, Groveland and Brandon townships | Resurfacing, right-turn lane extension from westbound Oakwood to northbound M-15, drainage improvements and Americans with Disabilities Act-compliant ramps and crosswalk on North Church Road at Oakwood Road | No; expect lane closures with flag control directing traffic when necessary | No | Ace-Saginaw Paving Company | July 15 | Late August | Federally Funded Overlays |
Preservation Overlays | Various heavier traveled roads throughout Oakland County | Various | Simple resurfacing, placing 2-2.5 inches of asphalt on the road surface; work is weather-dependent. | No | No | Cadillac Asphalt | 4/25/19 | September, TBA | Preservation Overlays |
Sashabaw Road | From Sherwood Road to Granger Road | Brandon Township | Pave gravel road with asphalt, improved drainage, shoulder paving in areas, curb and gutter installation in areas and storm sewer installation. | Yes; however, residential access will be maintained through the project | Sherwood Rd to Perry Lake Rd to Granger Rd, back to Sashabaw Rd and vice versa | Zito Construction | 7/1/19 | Late Fall | Sashabaw Road (Sherwood to Granger) |
Sashabaw Road (I-75 to Clarkston Road) | From I-75 to just south of Clarkston Road | Independence Township | Widening road to 5 lanes with a continuous left turn lane, resurfacing, right-turn lanes where warranted and Americans with Disabilities Act -compliant sidewalks and crosswalks. | No | No | Dan's Excavating | 4/22/18 | Late Fall | Sashabaw Road (I-75 to Clarkston) |
Spot Resurfacing | Various heavier traveled roads throughout Oakland County | Various | Milling short sections of roads and resurfacing with hot mix asphalt. | No | No | Cadillac Asphalt and Pro-Line Asphalt Paving | 4/22/19 | TBA | Spot Resurfacing |
*Williams Lake Road | North of M-59 (Highland Road) | Waterford Township | High-friction surface treatment on the curvy section of the road to provide better traction for vehicles. Process involves cleaning road surface, apply an epoxy and covering with coarse aggregate. | No; however, expect lane closures | No | Smith's Waterproofing | 9/6/19 (weather-dependent) | 9/13/19 | High-Friction Surface Control |