News Flash Home
The original item was published from 7/29/2019 9:31:24 AM to 8/6/2019 12:00:03 AM.

News Flash

Press Releases

Posted on: July 29, 2019

[ARCHIVED] WEEKLY ROAD CONSTRUCTION & PERMIT PROJECTS UPDATE (7/29-8/3)

new update

The following projects may cause traffic delays on Road Commission for Oakland County (RCOC) roads between July 29 and August 2 or may start shortly thereafter. 

It is RCOC’s goal to conduct road improvement projects in a way that interferes with traffic as little as possible. This list includes both Road Commission projects and projects conducted by others, under permit, on roads under the jurisdiction of the Road Commission.

Please note: This information is subject to change. Projects can change from day to day, and traffic delays can develop in a matter of minutes due to weather, emergency situations, etc.

The project list is attached.                                        

Additional information about current and upcoming projects can also be viewed on the RCOC website:   2018 RCOC ROAD CONSTRUCTION PROJECTS (http://www.rcocweb.org/189/Road-Projects).


2019 Road Commission for Oakland County Road Construction and Permit Projects (7/29/19 update)

Road

Project Limits

Community or Communities

Project Description

Detour

Detour Route

Prime Contractor

Start Date

Anticipated Completion

Project Information

10 Mile Road

From Evergreen Road to Greenfield Road

Southfield

Concrete slab removal and replacement, curb/gutter installation, Americans with Disabilities Act-compliant crosswalks and upgraded bus stops

No; however, lane closures are in place. Business access will be maintained.

No

Mark Anthony Contracting

7/15/19

Late Fall

10 Mile Road Concrete Slab Replacement

*12 Mile and Novi Road intersection

12 Mile Road and Novi Road intersection (including work on Novi Road approaches to intersection)

Novi

Concrete slab replacement, Americans with Disabilities Act-compliant sidewalk ramps and upgrades to the pedestrian signals

Approximately August 2, northbound and southbound Novi Rd will close at 12 Mile Rd; one lane in each direction will remain open on 12 Mile Rd.

Grand River Avenue to Meadowbrook Road to 13 Mile Road, back to Novi Road and vice versa

Mark Anthony Contracting

6/17/19

Early September

12 Mile/Novi Road Intersection

*12 Mile Road (PERMIT PROJECT)

West of Telegraph at Case Avenue

Southfield

Underground utility work

No, the outside eastbound lane and right turn lane are closed. Traffic is shifted to the open lane.

No

AT&T

5/10/19

Late August

Traffic Alert

8 Mile Road bridge over the Rogue River

Between Middlebelt Road and Grand River Avenue

Farmington Hills and Livonia

Preventative bridge maintenance including approach repairs, epoxy overlay on bridge deck and asphalt paving



No, expect lane closures

No

Florence Cement

6/17/19

Late August

8 Mile Bridge over the Rouge River

Adams Road and Gunn Road

Adams Road and Gunn Road intersection (roundabout construction)

Oakland Township

Construction of a roundabout, drainage improvements, curb/gutter installation, High-Intensity Activated Crosswalk (HAWK) pedestrian crossing beacons installed at crosswalks on the north leg of the roundabout

Yes, intersection is closed to traffic

For detour routes: CLICK HERE

M.L. Chartier

6/17/18

Late August

Adams and Gunn Road Roundabout

Adams Road bridges (work to be done during the Adams/Gunn roundabout construction)

North of Gunn Road to Orion Road

Oakland Township

Preventative maintenance including bridge approach improvements, epoxy overlay on bridge deck, paving with hot mix asphalt and new guardrail

Yes; however, residential traffic will be maintained

Orion Rd to Silverbell Rd, back to Adams Rd and vice versa

Florence Cement

6/17/19

Late August

Adams Road Bridges

Baldwin Road (Phase I) (carryover project from 2018)

From Morgan Road to Gregory Road

Orion Township

Behind the curb and driveway restoration; street lighting (DTE); Americans with Disabilities Act -compliant crosswalks/ sidewalks and new sign installation

No; however, expect lane closures

No

Dan's Excavating

4/8/2019

Substantially complete and open to traffic

Baldwin Road

Baldwin Road (Phase II)

From Gregory Road to Waldon Road

Orion Township

Reconstruction of Baldwin Road including: 3 roundabouts (Great Lakes Athletic Center, Maybee and Waldon roads), drainage, widening, Americans with Disabilities Act-compliant crosswalks, improved lighting, pedestrian paths, concrete curb and gutter.

Maybee Road is closed at Baldwin Road; Baldwin Road remains open to traffic

Yes, for Maybee Road detours: CLICK HERE

Dan's Excavating

6/17/19

TBA

Baldwin Road (Orion Township)

Maybee Road at Baldwin Road (Part of the Baldwin Road Phase II construction)

Maybee Road and Baldwin Road eastbound and westbound approaches

Orion Township

Eastbound and westbound Maybee Road at Baldwin Road are closed for roundabout construction

Yes; however, two-way traffic is maintained on Baldwin Rd

For detour routes: CLICK HERE

Dan's Excavating

7/11/19

Late Fall

Baldwin Road

Carroll Lake/Cooley Lake Road intersection

Carroll Lake Road and Cooley Lake Road intersection

Commerce Township

Construction of a mini roundabout

Yes, intersection is closed

For detour routes:            CLICK HERE

Commerce Construction and Landscaping Inc

7/15/19

9/6/19

Carroll Lake/Cooley Lake Road Roundabout

*Central Drive

from Indianwood Road to the Village of Lake Orion limits

Orion Township

Pulverizing existing road surface, asphalt paving, some guardrail replacement and minor drainage improvements

No

No

Asphalt Specialists Inc

7/29/19

Mid-September mainline paving completion

Central Drive

Concrete Slab Replacement

Various heavier traveled roads throughout Oakland County

Various

Remove and replace concrete

No, expect lane closures

No

Florence Cement

5/6/19

TBA

Concrete Slab Replacement

*Dixie Hwy

From Oakhill Road to the county line

Groveland, Holly and Springfield townships

Resurfacing with additional drainage work and guardrail replacement between Tindall and Gail Drive

No

No

Ace-Saginaw Paving Company

7/29/19

Mid- September

Federally Funded Overlays

Grand River Avenue at South Hill Road (carryover project from 2018)

Grand River Avenue and South Hill intersection

Lyon Township

Traffic signal installation is expected over the summer. Behind the curb restoration is complete

No

No

Fonson Company, Inc

4/22/18

August (TBA)

Grand River Avenue at South Hill

Haggerty Road and 14 Mile Road intersection (PERMIT PROJECT)

Haggerty Road and 14 Mile Road intersection

Novi, Farmington Hills, West Bloomfield Township and Commerce Township border

Adding a right-turn lane from SB Haggerty Rd to WB 14 Mile Rd and upgrades to sidewalks and pedestrian crosswalks to comply with the Americans with Disabilities Act

No; however, left-turns are prohibited from NB and SB Haggerty Rd to 14 Mile Rd. SB Haggerty traffic is shifted to the left-turn lane.

No

City of Novi

7/18/19

Late August

Traffic Alert

Haggerty Road over the Seeley Drain

From 13 Mile to 14 Mile Road (culvert is located between Lilly Court and MacKenzie Drive)

Farmington Hills and Novi

Remove and replace a culvert under the road that carries the Seeley Drain

Yes

13 Mile Rd to M-5 to 14 Mile Rd, back to Haggerty Rd and vice versa

DiPonio Contracting

9/3/19 (tentatively)

Late September (tentatively)

Haggerty Road Culvert Replacement over the Seeley Drain

* Heights Road (PERMIT PROJECT)

US 24 (N Broadway St) to Bellevue Avenue

Village of Lake Orion and Orion Township

Water main replacement

Yes

For detour routes: CLICK HERE

Fontana Construction

TBA

TBA

Village of Lake Orion

John R (Southbound John R from Long Lake to Square Lake Road is closed)

Long Lake Road to Square Lake Road

Troy

Excavation work

Yes, southbound John R is closed

Southbound John R detour is South Blvd to Dequindre Rd, to Long Lake Rd, back to John R; northbound John R remains open to traffic

Dan's Excavating

4/29/19

Late fall

John R

Lahser and 13 Mile Road intersection (PERMIT PROJECT)

Lahser Road and 13 Mile Road intersection

Beverly Hills

Consumers Energy high pressure gas main work

No, expect lane closures

No

Consumers Energy

7/16/19

Mid-September

Consumers Energy

Lake George Road Culvert

From West Predmore Road to Stoney Creek Road

Oakland Township

Remove and replace twin culverts under the road and replace guardrail

Yes, Lake George Road is closed between West Predmore and Stoney Creek roads

Lakeville Rd to Rochester Rd to Stoney Creek Rd, back to Lake George Rd and vice versa

Superior Contracting

7/22/19

Late August

Lake George Road Culvert Replacement

Livernois Road

From Avon Road to north of Walton

Rochester Hills

Reconstruction of road, improved drainage, traffic-signal modernization, upgrading sidewalks to comply with Americans with Disabilities Act, new guardrail, retaining wall repairs and replacing curbs and gutters

Yes, southbound Livernois is closed to traffic. Northbound Livernois will remain open to traffic

The detour for southbound Livernois traffic is Tienken Rd to Adams Rd to Avon Rd back to Livernois Rd

Pro-Line Asphalt

6/21/19

Late Fall

Livernois Road

Maple Road and Middlebelt Road

Maple Road and Middlebelt Road intersection (roundabout construction)

West Bloomfield Township

Construction of a roundabout, improved drainage, new watermain and Americans with Disabilities Act-compliant crosswalks.

Yes, intersection is expected to close in September

For detour routes: CLICK HERE

Angelo Iafrate

September, TBA

Late Fall

Maple and Middlebelt Roundabout Construction

Maple Road Culvert (PART OF THE MAPLE AND MIDDLEBELT ROAD ROUNDABOUT CONSTRUCTION)

From Middlebelt Road to Inkster Road (culvert is between Glenway Drive and Bloomfield Glens Road)

West Bloomfield Township

Removal and replacement of a culvert under the road that carries Rouge River Tributary

Yes, Maple Road is closed between Middlebelt and Inkster roads

Inkster Rd to 14 Mile Rd to Middlebelt Rd, back to Maple Rd and vice versa

Angelo Iafrate

6/29/19

September, TBA

Maple Road Culvert

Mason Street

From Milford Road to Franklin Street

 

Rose Township

Pave gravel road


No

Fonson Construction

6/8/19

COMPLETE

Mason Street

Middlebelt Road

From 12 Mile Road to 13 Mile Road (emergency repair is just south of Orion Court)

Farmington Hills

Emergency road repairs

TBA

TBA

Office of the Oakland County Water Resources Commissioner

TBA

TBA

Traffic Alerts

Milford Road

Just east of South Fenton Road and the railroad tracks

Rose Township

Culvert removal and replacement. Includes paving road, new guardrail and pavement markings

Yes, residential access will be maintained east of the culvert

Milford Rd to White Lake Rd to Hickory Ridge Rd, back to Milford Rd and vice versa

Zito Construction

8/12/19

Mid-October

Milord Road Culvert

Oakwood Road

From M-15 to Leece Road

Ortonville, Groveland and Brandon townships

Resurfacing, right-turn lane extension from westbound Oakwood to northbound M-15, drainage improvements and Americans with Disabilities Act-compliant ramps and crosswalk on North Church Road at Oakwood Road

No; expect lane closures with flag control directing traffic when necessary

No

Ace-Saginaw Paving Company

July 15

Late August

Federally Funded Overlays

Opdyke Road (carryover project from 2018)

From Featherstone to Perry Street

Auburn Hills and Pontiac

Milling and resurfacing road with hot mix asphalt, Americans with Disabilities Act -compliant crosswalks/bus stops, improved drainage and new pedestrian path from Auburn Road to I-75


No

No

Dan's Excavating

4/22/19

Early August (lane restrictions will remain in place for behind the curb restoration work)

Opdyke Road

Preservation Overlays

Various heavier traveled roads throughout Oakland County

Various

Simple resurfacing, placing 1.5-2 inches of asphalt on the road surface; work is weather-dependent

No

No

Cadillac Asphalt

4/25/19

September, TBA

Preservation Overlays

Sashabaw Road

From Sherwood Road to Granger Road

Brandon Township

Pave gravel road with asphalt, improved drainage, shoulder paving in areas, curb and gutter installation in areas and storm sewer installation

Yes; however, residential access will be maintained through the project

Sherwood Rd to Perry Lake Rd to Granger Rd, back to Sashabaw Rd and vice versa

Zito Construction

7/1/19

Late Fall

Sashabaw Road (Sherwood to Granger)

Sashabaw Road (I-75 to Clarkston Road)

From I-75 to just south of Clarkston Road

Independence Township

Widening road to 5 lanes with a continuous left turn lane, resurfacing, right-turn lanes where warranted and Americans with Disabilities Act -compliant sidewalks and crosswalks

No

No

Dan's Excavating

4/22/18

Late Fall

Sashabaw Road (I-75 to Clarkston)

Spot Resurfacing

Various heavier traveled roads throughout Oakland County

Various

Milling short sections of roads and resurfacing with hot mix asphalt

No

No

Cadillac Asphalt and Pro-Line Asphalt Paving

4/22/19

TBA

Spot Resurfacing

*indicates new or updated project; TBA = To Be Announced

Road Construction & Permit Projects (7/29-8/3)
Facebook Twitter Email

Other News in Press Releases