[ARCHIVED] WEEKLY ROAD CONSTRUCTION & PERMIT PROJECTS UPDATE (7/12-7/19)

road work sign

The following projects may cause traffic delays on Road Commission for Oakland County (RCOC) roads between July 12 and July 19 or may start shortly thereafter. 

It is RCOC’s goal to conduct road improvement projects in a way that interferes with traffic as little as possible. This list includes both Road Commission projects and projects conducted by others, under permit, on roads under the jurisdiction of the Road Commission.

Please note: This information is subject to change. Projects can change from day to day, and traffic delays can develop in a matter of minutes due to weather, emergency situations, etc.

The project list is attached.                                        

Additional information about current and upcoming projects can also be viewed on the RCOC website:   2018 RCOC ROAD CONSTRUCTION PROJECTS (http://www.rcocweb.org/189/Road-Projects).

                                       

2019 Road Commission for Oakland County Construction and Permit Projects (7/12/19 update)

Road

Project Limits

Community or Communities

Project Description

Detour

Detour Route

Prime Contractor

Start Date

Anticipated Completion

Project Information

*10 Mile Road

From Evergreen Road to Greenfield Road

Southfield

Concrete slab removal and replacement, curb/gutter installation, Americans with Disabilities Act-compliant crosswalks and upgraded bus stops

No; however, expect lane closures. Business access will be maintained.

No

Mark Anthony Contracting

7/15/19

Late Fall

10 Mile Road Concrete Slab Replacement

12 Mile and Novi Road intersection

12 Mile Road and Novi Road intersection (including work on Novi Road approaches to intersection)

Novi

Concrete slab replacement, Americans with Disabilities Act-compliant sidewalk ramps and upgrades to the pedestrian signals

Yes, northbound and southbound Novi Rd is closed at 12 Mile Rd; one lane in each direction will remain open on 12 Mile Rd (part of Phase 2, dates to be announced)

Yes, TBA (Phase 2 will have Novi Road completely closed at 12 Mile Road, date TBA)

Mark Anthony Contracting

6/17/19

mid-August

12 Mile/Novi Road Intersection

12 Mile Road (PERMIT PROJECT)

West of Telegraph at Case Avenue

Southfield

Underground utility work

No, the outside eastbound lane and right turn lane are closed. Traffic is shifted to the open lane.


No

AT&T

5/10/19

Late July

Traffic Alert

8 Mile Road bridge over the Rogue River

Between Middlebelt Road and Grand River Avenue

Farmington Hills and Livonia

Preventative bridge maintenance including approach repairs, epoxy overlay on bridge deck and asphalt paving

No, expect lane closures

No

Florence Cement

6/17/19

Late August

8 Mile Bridge over the Rouge River

Adams Road and Gunn Road

Adams Road and Gunn Road intersection (roundabout construction)

Oakland Township

Construction of a roundabout, drainage improvements, curb/gutter installation, High-Intensity Activated Crosswalk (HAWK) pedestrian crossing beacons installed at crosswalks on the north leg of the roundabout

Yes, intersection is closed to traffic

For detours:

 CLICK HERE

M.L. Chartier

6/17/18

Late August

Adams and Gunn Road Roundabout

Adams Road bridges (work to be done during the Adams/Gunn roundabout construction)

North of Gunn Road to Orion Road

Oakland Township

Preventative maintenance including bride approach improvements, epoxy overlay on bridge deck, paving with hot mix asphalt and new guardrail

Yes; however, residential traffic will be maintained

Orion Rd to Silverbell Rd, back to Adams Rd and vice versa

Florence Cement

6/17/19

Late August

Adams Road Bridges

Baldwin Road (Phase I) (carryover project from 2018)

From Morgan Road to Gregory Road

Orion Township

Behind the curb and driveway restoration; street lighting (DTE); Americans with Disabilities Act -compliant crosswalks/ sidewalks and new sign installation

No; however, expect lane closures

No

Dan's Excavating

4/8/2019

Summer, TBA (behind the curb restoration and landscaping continue)

Baldwin Road

Baldwin Road (Phase II)

From Gregory Road to Waldon Road

Orion Township

Reconstruction of Baldwin Road including: 3 roundabouts (Great Lakes Athletic Center, Maybee and Waldon roads), drainage, widening, Americans with Disabilities Act-compliant crosswalks, improved lighting, pedestrian paths, concrete curb and gutter

Maybee Road is closed at Baldwin Road

Baldwin Road is open, for Maybee Road detours:   CLICK HERE

Dan's Excavating

6/17/19

TBA

Baldwin Road (Orion Township)

*Maybee Road at Baldwin Road (Part of the Baldwin Road Phase II construction)

Maybee Road and Baldwin Road eastbound and westbound approaches

Orion Township

Eastbound and westbound Maybee Road is closed at Baldwin Road for roundabout construction

Yes; however, two-way traffic is maintained on Baldwin Rd

For Maybee Road detour routes: CLICK HERE

Dan's Excavating

7/11/19

Late Fall

Baldwin Road

*Carroll Lake/Cooley Lake Road intersection

Carroll Lake Road and Cooley Lake Road intersection

Commerce Township

Construction of a mini roundabout

Yes

For detours:       CLICK HERE

Commerce Construction and Landscaping Inc

7/15/19

9/6/19

Carroll Lake/Cooley Lake Road Roundabout

Central Drive

from Indianwood Road to the Village of Lake Orion limits

Orion Township

Pulverizing existing road surface, asphalt paving, some guardrail replacement and minor drainage improvements

No

No

TBA

TBA

TBA

Central Drive

Concrete Slab Replacement

Various heavier traveled roads throughout Oakland County

Various

Remove and replace concrete

No, expect lane closures

No

Florence Cement Company

5/6/19

TBA

Concrete Slab Replacement

*Dixie Hwy

From Oakhill Road to the county line

Groveland, Holly and Springfield townships

Resurfacing with additional drainage work and guardrail replacement between Tindall and Gail Drive

No

No

Ace-Saginaw Paving Company

7/22/19

Mid-September

Federally Funded Overlays

Grand River Avenue at South Hill Road (carryover project from 2018)

Grand River Avenue and South Hill intersection

Lyon Township

Traffic signal installation is expected over the summer. Behind the curb restoration is complete

No

No

Fonson Company, Inc

4/22/18

August (TBA)

Grand River Avenue at South Hill

*Heights Road (PERMIT PROJECT)

US 24 (N Broadway St) to Bellevue Avenue

Village of Lake Orion

Water main replacement

Yes

TBA

Fontana Construction

TBA

TBA

Village of Lake Orion

John R (Southbound John R from Long Lake to Square Lake Road is closed)

Long Lake Road to Square Lake Road

Troy

Excavation work

Yes, southbound John R is closed

Southbound John R detour is South Blvd to Dequindre Rd, to Long Lake Rd, back to John R; northbound John R remains open to traffic

Dan's Excavating

4/29/19

Late fall

John R

*Lake George Road Culvert

From West Predmore Road to Stoney Creek Road

Oakland Township

Remove and replace twin culverts under the road and replace guardrail

Yes

Lakeville Rd to Rochester Rd to Stoney Creek Rd, back to Lake George Rd and vice versa

Superior Contracting

7/15/19

Late August

Lake George Road Culvert Replacement

*Lasher and 13 Mile Road intersection (PERMIT PROJECT)

Lahser Road and 13 Mile Road intersection

Beverly Hills

Consumers Energy high pressure gas main work

No, expect lane closures

No

Consumers Energy

7/16/19

Mid-September

Consumers Energy

Livernois Road

From Avon Road to north of Walton Blvd

Rochester Hills

Reconstruction of road, improved drainage, traffic-signal modernization, upgrading sidewalks to comply with Americans with Disabilities Act, new guardrail, retaining wall repairs and replacing curbs and gutters

Yes, southbound Livernois is closed to traffic. Northbound Livernois will remain open to traffic

The detour for southbound Livernois traffic is Tienken Rd to Adams Rd to Avon Rd back to Livernois Rd

Pro-Line Asphalt

6/21/19

Late Fall

Livernois Road

Maple Road and Middlebelt Road

Maple Road and Middlebelt Road intersection (roundabout construction)

West Bloomfield Township

Construction of a roundabout, improved drainage, new watermain and Americans with Disabilities Act-compliant crosswalks

Yes, intersection is expected to close in September

For detours:      CLICK HERE

Angelo Iafrate

September, TBA

Late Fall

Maple and Middlebelt Roundabout Construction

Maple Road Culvert (PART OF THE MAPLE AND MIDDLEBELT ROAD ROUNDABOUT CONSTRUCTION)

From Middlebelt Road to Inkster Road (between Glenway Drive and Bloomfield Glens Road)

West Bloomfield Township

Removal and replacement of a culvert under the road that carries Rouge River Tributary

Yes, Maple Rd is closed between Middlebelt and Inkster roads

Inkster Rd to 14 Mile Rd to Middlebelt Rd, back to Maple Rd and vice versa

Angelo Iafrate

6/29/19

September, TBA

Maple Road Culvert

Mason Street

From Milford Road to Franklin Street

Rose Township

Pave gravel road

Yes; however, residential and township hall access will be maintained


Franklin St to Clinton St, back to Mason St and vice versa

Fonson Construction

6/8/19

7/12/19 (behind the shoulder restoration and driveway work will continue)

Mason Street

*McGinnis Road

From Grange Hall Road to Wildwood Road

Groveland Township

Remove and replace a culvert under the road

Yes

Grange Hall Rd to Wildwood Rd, back to McGinnis Rd and vice versa

RCOC Hwy Maintenance

7/13/19 (in case of inclement weather, the work could be done on 7/14/19)


7/13/19 (evening)

Weekend, Emergency and Short-Term Road Closures

*Middlebelt Road

From 12 Mile Road to 13 Mile Road (sinkhole Is located just south of Orion Court)



Farmington Hills

Emergency closure due to sinkhole


Yes

12 Mile Rd to Orchard Lake Rd to 13 Mile Rd, back to Middlebelt Rd and vice versa   

RCOC Hwy Maintenance


7/12/19

TBA

Traffic Alert


Milford Road

Just east of South Fenton Road and the railroad tracks

Rose Township

Culvert removal and replacement. Includes paving road, new guardrail and pavement markings

Yes, residential access will be maintained east of the culvert

Milford Rd to White Lake Rd to Hickory Ridge Rd, back to Milford Rd and vice versa

Zito Construction

8/12/19

Mid-October

Milord Road Culvert

Oakwood Road

From M-15 to Leece Road

Ortonville, Groveland and Brandon townships

Resurfacing, right-turn lane extension from westbound Oakwood to northbound M-15, drainage improvements and Americans with Disabilities Act-compliant ramps and crosswalk on North Church Road at Oakwood Road

No

No

Ace-Saginaw Paving Company

7/15/19

Late August

Federally Funded Overlays

*Opdyke Road (carryover project from 2018)

From Featherstone to Perry Street

Auburn Hills and Pontiac

Milling and resurfacing road with hot mix asphalt, Americans with Disabilities Act -compliant crosswalks/bus stops, improved drainage and new pedestrian path from Auburn Road to I-75

No

No

Dan's Excavating

4/22/19

Early August (MDOT detour for M-59/I-75 ramp and bridge closures is Opdyke Road until late-Oct)

Opdyke Road

Preservation Overlays

Various heavier traveled roads throughout Oakland County

Various

Simple resurfacing, placing 1.5-2 inches of asphalt on the road surface; work is weather-dependent

No

No

Cadillac Asphalt

4/25/19

September, TBA

Preservation Overlays

Sashabaw Road

From Sherwood Road to Granger Road

Brandon Township

Pave gravel road with asphalt, improved drainage, shoulder paving in areas, curb and gutter installation in areas and storm sewer installation

Yes; however, residential access will be maintained through the project

Sherwood Rd to Perry Lake Rd to Granger Rd, back to Sashabaw Rd and vice versa

Zito Construction

7/1/19

Late Fall

Sashabaw Road (Sherwood to Granger)

Sashabaw Road

From south of Bow Pointe Drive to Sheffler Drive

Independence Township

Widening and reconstructing two turnarounds, right-turn lane improvement at Bow Pointe Dr, Americans with Disabilities Act-compliant sidewalk ramps

No, road will remain open to traffic

No

Angelo Iafrate

4/22/19

Substantially complete (work continues on behind the curb restoration and crosswalk)

Sashabaw Road

Sashabaw Road (i-75 to Clarkston Road)

From I-75 to just south of Clarkston Road

Independence Township

Widening road -5 lanes with a continuous left turn lane, resurfacing, right-turn lanes where warranted and Americans with Disabilities Act -compliant sidewalks and crosswalks

No

No

Dan's Excavating

4/22/18

Late Fall

Sashabaw Road (I-75 to Clarkston)

Spot Resurfacing

Various heavier traveled roads throughout Oakland County

Various

Milling short sections of roads and resurfacing with hot mix asphalt

No

No

Cadillac Asphalt and Pro-Line Asphalt Paving

4/22/19

TBA

Spot Resurfacing

Walton Blvd. (carryover project from 2018)

From Adams Road to Squirrel Road

Auburn Hills and Rochester Hills

Milling and resurfacing road including the Walton Blvd/Squirrel Rd intersection. New curb, gutter and Americans with Disabilities Act -compliant sidewalks and crosswalks

No

No

Z Contactors

3/25/2019

COMPLETE