*10 Mile Road | Evergreen Road to Greenfield Road | Southfield | Concrete slab removal and replacement, curb/gutter installation, Americans with Disabilities Act-compliant crosswalks and upgraded bus stops | No; however, expect lane closures. Business access will be maintained. | No | Mark Anthony Contracting | June TBA | Late Fall | 10 Mile Road Concrete Slab Replacement |
*12 Mile and Novi Road intersection | 12 Mile Road and Novi Road intersection (including work on Novi Road approaches to intersection) | Novi | Concrete slab replacement, Americans with Disabilities Act-compliant sidewalk ramps and upgrades to the pedestrian signals | TBA | TBA | Mark Anthony Contracting | June, TBA | TBA | 12 Mile/Novi Road Intersection |
12 Mile Road (PERMIT PROJECT) | West of Telegraph at Case Avenue | Southfield | Underground utility work | No, the outside eastbound lane and right turn lane are closed. Traffic is shifted to the open lane. | No | AT&T | 5/10/19 | 6/21/19 | Traffic Alert |
*Adams Road and Gunn Road | Adams Road and Gunn Road intersection (roundabout construction) | Oakland Township | Construction of a roundabout, drainage improvements, curb/gutter installation, High-Intensity Activated Crosswalk (HAWK) pedestrian crossing beacons installed at crosswalks on the north leg of the roundabout | Yes, intersection will close to traffic | For detour information: CLICK HERE | M.L. Chartier | 6/17/18 | Late August | Adams and Gunn Road Roundabout |
Baldwin Road (Phase I) (carryover project from 2018) | From Morgan Road to Gregory Road | Orion Township | Behind the curb and driveway restoration; street lighting (DTE); Americans with Disabilities Act -compliant crosswalks/ sidewalks and new sign installation | No; however, expect lane closures | No | Dan's Excavating | 4/8/2019 | Late Spring | Baldwin Road |
Baldwin Road (Phase II) | From Gregory Road to Waldon Road | Orion Township | Reconstruction of Baldwin Road including: 3 roundabouts (Great Lakes Athletic Center, Maybee and Waldon roads), drainage, widening, Americans with Disabilities Act-compliant crosswalks, improved lighting, pedestrian paths, concrete curb and gutter. | No | No | Dan's Excavating | To Be Announced (utility relocation continues) | TBA | Baldwin Road |
Concrete Slab Replacement | Various heavier traveled roads throughout Oakland County | Various | Remove and replace concrete | No, expect lane closures | No | Florence Cement Company | 5/6/19 | TBA | Concrete Slab Replacement |
Grand River Avenue at South Hill Road (carryover project from 2018) | Grand River Avenue and South Hill intersection | Lyon Township | Traffic signal installation is expected to begin in June. Behind the curb restoration is complete.
| No | No | Fonson Company, Inc | 4/22/18 | Summer (TBA) | Grand River Avenue at South Hill |
John R (Southbound John R from Long Lake to Square Lake Road is closed) | Long Lake Road to Square Lake Road | Troy | Excavation work | Yes, southbound John R is closed | Southbound John R detour is South Blvd to Dequindre Rd, to Long Lake Rd, back to John R; northbound John R remains open to traffic | Dan's Excavating | 4/29/19 | Late fall | John R |
*South Blvd at John R (Part of the John R project) | East leg of South Blvd at John R intersection (WEEKEND CLOSURE) | Troy and Rochester Hills | Installation of storm-sewer under South Blvd | Yes; NB John R traffic will have access to WB South Blvd | Dequindre Rd to Long Lake Rd to Rochester Rd, back to South Blvd | Dan's Excavating | 6/14/19 (closed at 7 pm) | 6/16/19 (expected to reopen approximately 8 pm) | John R |
*Square Lake Road at John R (Part of the John R project) | East approach of Square Lake Road at John R intersection (WEEKEND CLOSURE) | Troy and Rochester Hills | Installation of storm-sewer under Square Lake Road | Yes; NB John R traffic will have access to WB Square Lake Road | Square Lake Rd to Rochester Rd to Long Lake Rd to Dequindre Rd, back to Square Lake Rd | Dan's Excavating | 6/7/19 (closed at 7 pm) | 6/9/19 (expected to reopen approximately 8 pm) | John R |
*Livernois Road | From Avon Road to Walton Blvd. | Rochester Hills | Reconstruction of road, improved drainage, traffic-signal modernization, upgrading sidewalks to comply with Americans with Disabilities Act, new guardrail, retaining wall repairs and replacing curbs and gutters | Yes, southbound Livernois will close to traffic. Northbound Livernois will remain open to traffic | The detour for southbound Livernois traffic is Tienken Rd to Adams Rd to Avon Rd | Pro-Line Asphalt | June, TBA | Late Fall | Livernois Road |
Maple Road and Middlebelt Road | Maple Road and Middlebelt Road intersection (roundabout construction) | West Bloomfield Township | Construction of a roundabout, improved drainage, new watermain and Americans with Disabilities Act-compliant crosswalks. | Yes | For detours: CLICK HERE | Pro-Line Asphalt | June | Late Fall | Maple and Middlebelt Roundabout Construction |
Maple Road Culvert (PART OF THE MAPLE AND MIDDLEBELT ROAD ROUNDABOUT CONSTRUCTION) | Just east of Middlebelt Road (between Glenway Drive and Bloomfield Glens Road) | West Bloomfield Township | Removal and replacement of a culvert under the road that carries Rouge River Tributary | Yes | Inkster Rd to 14 Mile Rd to Middlebelt Rd, back to Maple Rd and vice versa | Angelo Iafrate | June, TBA | September, TBA | Maple Road Culvert |
*Mason Street | From Milford Road to Franklin Street | Rose Township | Pave gravel road | Yes; however, residential and township hall access will be maintained | Franklin St to Clinton St, back to Mason St and vice versa | Fonson Construction | TBA | TBA | Mason Street |
McGinnis Road | From Grange Hall Road to Wildwood Road | Groveland Township | Remove and replace a culvert under the road | Yes | Grange Hall Rd to Wildwood Rd, back to McGinnis Rd and vice versa | RCOC Hwy Maintenance | June TBA | TBA | Weekend, Emergency and Short-Term Road Closures |
*Milford Road | Just east of South Fenton Road and the railroad tracks | Rose Township | Culvert removal and replacement. Includes paving road, new guardrail and pavement markings | Yes, residential access will be maintained east of the culvert | Milford Rd to White Lake Rd to Hickory Ridge Rd, back to Milford Rd and vice versa | Zito Construction | 8/12/19 | Mid-October | Milord Road Culvert |
Opdyke Road (carryover project from 2018) | From Featherstone to Perry Street | Auburn Hills and Pontiac | Milling and resurfacing road with hot mix asphalt, Americans with Disabilities Act -compliant crosswalks/bus stops, improved drainage and new pedestrian path from Auburn Road to I-75 | No | No | Dan's Excavating | 4/22/19 | TBA (MDOT will detour M-24/I-75 ramp and bridge closures to Opdyke Road from 6/3-6/8) | Opdyke Road |
Preservation Overlays | Various heavier traveled roads throughout Oakland County | Various | Simple resurfacing, placing 1.5-2 inches of asphalt on the road surface; work is weather-dependent | No | No | Cadillac Asphalt | 4/25/19 | September, TBA | Preservation Overlays |
Quarton Road
| From Lahser Road to Cranbrook Road (closure is just west of Merrimac Court)
| Bloomfield Township and Bloomfield Hills
| Extending center left-turn lane on Quarton to southbound Lahser
| No
| No
| Cadillac Asphalt
| 5/28/19
| 5/31/19 open to traffic; paving and striping to be done later (date TBA) | Preservation Overlay |
Sashabaw Road | From I-75 to just south of Clarkston Road | Independence Township | Widening road -5 lanes with a continuous left turn lane, resurfacing, right-turn lanes where warranted and Americans with Disabilities Act -compliant sidewalks and crosswalks
| No | No | Dan's Excavating | 4/22/18 | Late Fall | Sashabaw Road (I-75 to Clarkston) |
Sashabaw Road | From Sherwood Road to Granger Road | Brandon Township | Pave gravel road with asphalt, improved drainage, shoulder paving in areas, curb and gutter installation in areas and storm sewer installation | Yes; however, residential access will be maintained through the project | Sherwood Rd to Perry Lake Rd to Granger Rd, back to Sashabaw Rd and vice versa | Zito Construction | June, TBA | Late Fall | Sashabaw Road (Sherwood to Granger) |
Sashabaw Road | From south of Bow Pointe Drive to Sheffler Drive | Independence Township | Widening and reconstructing two turnarounds, right-turn lane improvement at Bow Pointe Dr, Americans with Disabilities Act-compliant sidewalk ramps | No, road will remain open to traffic | No | Angelo Iafrate | 4/22/19 | Late June | Sashabaw Road (Bow Pointe to Sheffler) |
Spot Resurfacing | Various heavier traveled roads throughout Oakland County | Various | Milling short sections of roads and resurfacing with hot mix asphalt | No | No | Cadillac Asphalt and Pro-Line Asphalt Paving | 4/22/19 | TBA | Spot Resurfacing |
Walton Blvd. (carryover project from 2018) | From Adams Road to Squirrel Road | Auburn Hill and Rochester Hills | Milling and resurfacing road including the Walton Blvd/Squirrel Rd intersection. New curb, gutter and Americans with Disabilities Act -compliant sidewalks and crosswalks | No | No | Z Contactors | 3/25/2019 | June, TBA | Walton Blvd |