14 Mile Road
| From Southfield Road to Greenfield Road
| Beverly Hills and Birmingham
| Concrete slab removal and replacement
| No
| No
| Cipparone
| 10/5/18
| COMPLETE | Concrete Slab Replacement |
14 Mile Road (PERMIT PROJECT)
| Old Post Drive to Cranbrook/ Evergreen Road
| Bloomfield Township and Beverly Hills
| Consumers Energy gas main work
| No
| No
| Consumers Energy
| 11/7/18
| COMPLETE | Traffic Alert |
14 Mile Road [PERMIT PROJECT)
| Telegraph Road (US 24) to Lahser Road
| Bingham Farms
| Consumers Energy gas utility work
| No
| No
| Consumers Energy
| 11/6/18
| COMPLETE | Traffic Alert |
Adams Road | From Square Lake Road to South Blvd | Troy and Bloomfield Township | Resurfacing, drainage improvements, shoulder widening and traffic signal upgrades | Yes, southbound remains closed just north of the I-75 ramps; northbound remains open to traffic | For southbound traffic: South Blvd to Squirrel Rd to Square Lake Rd, back to Adams Rd | Ajax | 8/8/18 | December (TBA) | Adams Road, South Blvd to Square Lake Road |
Baldwin Road (PHASE I) | From Morgan Road to Gregory Road | Orion Township | Reconstruction of Baldwin Road including: 2 roundabouts (Gregory and Judah roads), widening, Americans with Disabilities Act (ADA) compliant crosswalks, improved lighting, pedestrian paths, concrete curb and gutter. Phase II from Gregory to Waldon is in progress with ongoing utility relocation and water main work. | No; intermittent lane closures (NB and SB Baldwin Road traffic maintained) | No | Dan's Excavating | 4/2/18 | Late December (PHASE I expected to open to traffic late fall; road work, curb, driveways and behind the curb restoration will continue in the Spring of 2019)
| Baldwin Road (PHASE I) |
Jordan Road (part of the Baldwin Road project) | At Baldwin Road | Orion Township | Storm sewer, drainage and roundabout construction | TBA | Brown Rd to Georgia Rd, back to Jordan Rd and vice versa | Dan's Excavation | 8/6/18 | TBA | Baldwin Road (PHASE I) |
Judah Road (part of Baldwin Road project) | At Baldwin Road | Orion Township | Storm sewer and drainage | TBA | Brown Rd to Joslyn Rd, back to Judah Rd and vice versa | Dan's Excavating | 8/6/18 | TBA | Baldwin Road (PHASE I) |
Dequindre Road (Phase II)
| From Long Lake Road to Burningbush Drive
| Troy and Sterling Heights border
| Widening to 5 lanes with center left-turn lane, traffic signal upgrades, improved drainage, Americans with Disabilities Act (ADA) compliant crosswalks
| No
| No
| Dan's Excavating
| 3/5/18
| COMPLETE | Dequindre Road |
Flint, Miller and Orion roads intersection
| Flint, Miller and Orion roads intersection
| Village of Lake Orion and Orion Township
| Construction of a roundabout
| Yes
| No
| Commerce Construction and Landscaping Inc.
| 9/10/18
| COMPLETE | Flint, Miller & Orion Road Roundabout |
Grand River Avenue at South Hill Road | Grand River Avenue and South Hill Road intersection | Lyon Township | Intersection improvements, additional turn lanes, traffic signal installation, drainage improvements and Americans with Disabilities Act compliant crosswalks, sidewalk and ramps. | Yes. The south approach of South Hill at Grand River is closed to traffic. Remainder of intersection is open to traffic. | Grand River Ave to Haas Rd to 12 Mile Rd back to South Hill Rd and vice versa | Fonson Company, Inc. | 9/13/18 | Late November (traffic signal installation in the Spring of 2019) | Grand River at South Hill Road |
*Grange Hall Road | From Dixie Hwy to North Holly Road (just west of Great Lakes Blvd) | Holly Township | Culvert repair | Yes, three-day closure of Grange Hall Rd 11/26-11/28 (dates are weather-dependent) | Dixie Hwy to East Baldwin Rd to North Holly Rd, back to Grange Hall Rd and vice versa | Trojan Development Company | 10/31/18 | Late Fall | Weekend, Emergency & Short-Term Road Closures |
Joint Replacement
| Various roads
| Various
| Milling out road joints and filling with hot mix asphalt
| No; however, expect lane restrictions in work zones
| No
| Cadillac Asphalt
| 7/30/18
| COMPLETE | Road Joint Repair Program |
Opdyke Road | From Auburn Road to Perry Road | Pontiac and Auburn Hills | Bridge replacement over the Clinton River, resurfacing, Americans with Disabilities Act compliant crosswalks/bus stops, improved drainage, construction of a pedestrian pathway from Auburn Rd to I-75 & water main work between Featherstone and Walton Blvd. | Yes, between Auburn Road and M-59 is closed for bridge replacement, two-way traffic maintained from M-59 to Perry Road | Auburn Rd to Martin Luther King Blvd to Featherstone, back to Opdyke Rd and vice versa | Dan's Excavating | 6/18/18 | Late December (further paving on Opdyke from Featherstone to Walton Blvd to take place in 2019) | Opdyke Road |
Sashabaw Road (2018-2019 Project) | From I-75 to south of Clarkston Road | Independence Township | Sanitary sewer and water main work in 2018. 2019 construction includes road widening, resurfacing, center left-turn lane, right-turn lanes where warranted and Americans with Disabilities Act compliant sidewalks and crosswalks | No, periodic lane restrictions for sewer and water main work | No | Dan's Excavating | 10/1/18 | TBA (project will continue in 2019) | Sashabaw Road 2018-2019 |
South Blvd over Ferry Creek Drain
| West of John R
| Rochester Hills and Troy
| Culvert replacement
| Yes
| No
| Z Contractors
| 9/24/18
| COMPLETE | South Blvd Over Ferry Creek Drain |
Southfield Road
| From 12 Mile to 13 Mile Road
| Beverly Hills and Southfield
| Concrete slab removal and replacement
| No, one lane remains open to traffic in each direction
| No
| Cipparone
| 10/4/18
| COMPLETE | Concrete Slab Replacement |
Tripp Road | From Dixie Hwy to Van Road | Groveland Township | Reconstruction of road including culvert replacement, improved drainage, widening/paving of road shoulders, curb and gutter installation | Yes | Dixie Hwy to Grange Hall Rd, back to Tripp Rd and vice versa | Angelo Iafrate | 7/30/18 | December TBA | Tripp Road |
Walton Blvd. | From Adams Road to Squirrel Road | Auburn Hills and Rochester Hills | Replacement of three culverts, improved drainage, concrete curbs/gutters and resurfacing | No, two-way traffic is shifted to the south half of Walton Blvd. Firewood and Bellarmine drives are closed at Walton Blvd. | No, Firewood and Bellarmine drives are closed at Walton Blvd. Residents can use Tienken or Adams roads. | Z Contractors | 5/14/18 | Late December (additional paving, median and curb work will continue in the spring of 2019) | Walton Blvd Culvert Replacement |