14 Mile Road | From Southfield Road to Greenfield Road | Beverly Hills and Birmingham | Concrete slab removal and replacement | Yes, westbound 14 Mile is closed; eastbound 14 Mile remains open to traffic | Westbound 14 Mile detour is Greenfield Rd to 13 Mile Rd to Southfield Rd, back to 14 Mile Rd | Cipparone | 10/5/18 | Mid-November | Concrete Slab Replacement |
Adams Road | From Square Lake Road to South Blvd | Troy and Bloomfield Township | Resurfacing, drainage improvements, shoulder widening and traffic signal upgrades | Yes, southbound remains closed just north of the I-75 ramps; northbound remains open to traffic | For southbound traffic: South Blvd to Squirrel Rd to Square Lake Rd, back to Adams Rd | Ajax | 8/8/18 | TBA | Adams Road, South Blvd to Square Lake Road |
Baldwin Road (PHASE I) | From Morgan Road to Gregory Road | Orion Township | Reconstruction of Baldwin Road including: 2 roundabouts (Gregory and Judah roads), widening, Americans with Disabilities Act (ADA) compliant crosswalks, improved lighting, pedestrian paths, concrete curb and gutter | No; intermittent lane closures (NB and SB Baldwin Road traffic maintained) | No | Dan's Excavating | 4/2/18 | Late Fall (PHASE I expected to open to traffic late November; behind the curb restoration will continue in the Spring of 2019) | Baldwin Road (PHASE I) |
*Baldwin Road (PHASE II) | Maybee Road and Waldon Road | Orion Township | Culvert removal and replacement between Thornwood Trail and Baldwin Woods Drive (near ITC high transmission towers) | Yes | NB Baldwin detour: Maybee Rd to Clintonville Rd to Clarkston Rd, back to Baldwin Rd SB Baldwin detour: Waldon Rd to Joslyn Rd to Brown Rd, back to Baldwin Rd and vice versa | Dan's Excavating | 11/2/18 at 6:00 pm | 11/5/18 at 6:00 am | Baldwin Road |
Jordan Road (part of the Baldwin Road PHASE I project) | At Baldwin Road | Orion Township | Storm sewer, drainage and roundabout construction | Yes | Brown Rd to Georgia Rd, back to Jordan Rd and vice versa | Dan's Excavation | 8/6/18 | TBA | Baldwin Road (PHASE I) |
Judah Road (part of Baldwin Road PHASE I project) | At Baldwin Road | Orion Township | Storm sewer and drainage | Yes | Brown Rd to Joslyn Rd, back to Judah Rd and vice versa | Dan's Excavating | 8/6/18 | TBA | Baldwin Road (PHASE I) |
Morgan Road (part of the Baldwin Road PHASE I project) | At Baldwin Road | Orion Township | Concrete curb/gutter, sidewalk, storm sewer, drainage improvements and concrete paving | No | No | Dan's Excavating | 8/13/18 | Currently open to traffic (future closure date pending) | Baldwin Road (PHASE I) |
Concrete Slab Replacements | Various heavier traveled roads | Various | Remove and replace concrete | No, expect lane closures | No | Cipparone | 6/4/18 | Late Fall | Concrete Slab Replacement |
Dequindre Road (Phase II) | From Long Lake Road to Burningbush Drive | Troy and Sterling Heights border | Widening to 5 lanes with center left-turn lane, traffic signal upgrades, improved drainage, Americans with Disabilities Act (ADA) compliant crosswalks | No | No | Dan's Excavating | 3/5/18 | Mid-November | Dequindre Road |
*Flemings Lake Road | Flemings Lake Road at Sashabaw Road | Independence Township | Sanitary sewer work | Yes, Flemings Lake Road will close at Sashabaw (Sashabaw remains open to traffic) | Clarkston Rd to Wyngate Dr to Oakstone Dr, back to Flemings Lake Rd and vice versa | Dan's Excavating | 11/8/18 (early morning) | 11/9/18 (afternoon) | Sashabaw Road 2018-19 |
Flint, Miller and Orion roads intersection | Flint, Miller and Orion roads intersection | Village of Lake Orion and Orion Township | Construction of a roundabout | Yes | Various detours: CLICK HERE | Commerce Construction | 9/10/18 | Mid-November | Flint, Miller & Orion Road Roundabout |
Grand River Avenue at South Hill Road | Grand River Avenue and South Hill Road intersection | Lyon Township | Intersection improvements, additional turn lanes, traffic signal installation, drainage improvements and Americans with Disabilities Act compliant crosswalks, sidewalk and ramps | Yes. The south approach of South Hill at Grand River is closed to traffic. Remainder of intersection is open to traffic. | Grand River Ave to Haas Rd to 12 Mile Rd back to South Hill Rd and vice versa | Fonson Company, Inc. | 9/13/18 | Late November (traffic signal installation in the Spring of 2019) | Grand River at South Hill Road |
Grange Hall Road | From Dixie Hwy to North Holly Road (just west of Great Lakes Blvd) | Holly Township | Culvert repair | Yes, three-day closure of Grange Hall Rd 11/26-11/28 (dates are weather-dependent) | Dixie Hwy to East Baldwin Rd to North Holly Rd, back to Grange Hall Rd and vice versa | Trojan Development Company | 10/31/18 | Early December (weather-dependent) | Weekend, Emergency & Short-Term Road Closures |
*Haggerty/12 Mile Road (PERMIT PROJECT) | Haggerty Road and 12 Mile Road intersection | Farmington and Novi | Consumers Energy gas main work | No, periodic lane closures | No | Consumers Energy | 10/30/18 | 11/15/18 | Traffic Alert |
Joint Replacement | Various heavier traveled roads throughout Oakland County | Various | Milling out road joints and filling with hot mix asphalt | No; however, expect lane restrictions in work zones | No | Cadillac Asphalt | 7/30/18 | Late Fall | Road Joint Repair Program |
Opdyke Road | From Auburn Road to Perry Road | Pontiac and Auburn Hills | Bridge replacement over the Clinton River, resurfacing, Americans with Disabilities Act compliant crosswalks/bus stops, improved drainage, construction of a pedestrian pathway from Auburn Rd to I-75 & water main work between Featherstone and Walton Blvd. | Yes, between Auburn Road and M-59 is closed for bridge replacement, two-way traffic maintained from M-59 to Perry Road | Auburn Rd to Martin Luther King Blvd to Featherstone, back to Opdyke Rd and vice versa | Dan's Excavating | 6/18/18 | TBA | Opdyke Road |
Pine Tree Road
| From Clarkston Road to Heights Road
| Orion Township
| Road rehabilitation including paving, ditching, drainage improvements and Americans with Disabilities Act compliant sidewalks
| No
| No
| Cadillac Asphalt
| 8/6/18
| COMPLETE | Pine Tree Road |
Sashabaw Road (2018-2019 Project) | From I-75 to south of Clarkston Road | Independence Township | Sanitary sewer and water main work in 2018. 2019 construction includes road widening, resurfacing, center left-turn lane, right-turn lanes where warranted and Americans with Disabilities Act compliant sidewalks and crosswalks. | No, periodic lane restrictions for sewer and water main work | No | Dan's Excavating | 10/1/18 (tree removal) | Project will carryover until late fall of 2019 | Sashabaw Road 2018-2019 |
South Blvd over Ferry Creek Drain | West of John R | Rochester Hills and Troy | Culvert replacement | Yes | Rochester Rd to Auburn Rd to John R Rd, back to South Blvd and vice versa | Z Contractors | 9/24/18 | Mid-November | South Blvd Over Ferry Creek Drain |
South Blvd.
| From Adams Road to Crooks Road
| Rochester Hills and Troy
| Resurfacing, drainage improvements, traffic signal upgrades and Borden Drain culvert replacement. South Blvd from Crooks to Coolidge will be partially reconstructed.
| No
| No
| Pro-Line Asphalt
| 6/20/18
| COMPLETE | South Blvd |
Southfield Road | From 12 Mile to 13 Mile Road | Beverly Hills and Southfield | Concrete slab removal and replacement | No, one lane remains open to traffic in each direction | No | Cipparone | 10/4/18 | Mid-November | Concrete Slab Replacement |
Tripp Road | From Dixie Hwy to Van Road | Groveland Township | Reconstruction of road including culvert replacement, improved drainage, widening/paving of road shoulders, curb and gutter installation | Yes | Dixie Hwy to Grange Hall Rd, back to Tripp Rd and vice versa | Angelo Iafrate | 7/30/18 | Late Fall (weather dependent) | Tripp Road |
Waldon Road (PERMIT PROJECT) | West of Lapeer Road (M-24) | Orion Township | Water main installation for private development | Yes | Lapeer Rd (M-24) to West Silverbell Rd to Giddings Rd, back to Waldon Rd and vice versa | Superior Excavation | 10/30/18 | 11/2/18 | Traffic Alert |
Walton Blvd. | From Adams Road to Squirrel Road | Auburn Hills and Rochester Hills | Replacement of three culverts, improved drainage, concrete curbs/gutters and resurfacing | No, two-way traffic is shifted to the south half of Walton Blvd. Firewood and Bellarmine drives are closed at Walton Blvd. | No, Firewood and Bellarmine drives are closed at Walton Blvd. Residents can use Tienken or Adams roads. | Z Contractors | 5/14/18 | Late Fall | Walton Blvd Culverts
|