Adams Road | Square Lake Road and South Blvd | Troy and Bloomfield Township | Resurfacing, drainage improvements, shoulder widening and traffic signal upgrades | Yes, southbound is closed; northbound remains open to traffic | Southbound traffic detour: South Blvd to Squirrel Rd to Square Lake Rd, back to Adams Rd | Ajax | 8/8/18 | Late October | Adams Road, South Blvd to Square Lake Road |
Baldwin Road | Phase I-Morgan Road to Gregory Road 2017-2018; Phase II-Gregory to Waldon 2018-2019 | Orion Township | Reconstruction of Baldwin Road including: 5 roundabouts, widening, Americans with Disabilities Act (ADA) compliant crosswalks, improved lighting, pedestrian paths, concrete curb and gutter | No; intermittent lane closures (NB and SB Baldwin Road traffic maintained) | No | Dan's Excavating | 4/2/18 | Late Fall (Phase II will begin Spring of 2019) | Baldwin Road |
Jordan Road (part of the Baldwin Road project) | At Baldwin Road | Orion Township | Storm sewer, drainage and roundabout construction | Yes | Brown Rd to Georgia Rd, back to Jordan Rd and vice versa | Dan's Excavation | 8/6/18 | October, TBA | Baldwin Road |
Judah Road (part of Baldwin Road project) | At Baldwin Road | Orion Township | Storm sewer and drainage | Yes | Brown Rd to Joslyn Rd, back to Judah Rd and vice versa | Dan's Excavating | 8/6/18 | Late October, TBA |
|
Morgan Road (part of the Baldwin Road project) | At Baldwin Road | Orion Township | Storm sewer, drainage and paving | Yes | Baldwin Rd to Gregory Rd to Rohr Rd, back to Morgan Rd and vice versa | Dan's Excavating | 8/13/18 | Early November | Baldwin Road |
Concrete Slab Replacements | Various heavier traveled roads | Various | Remove and replace concrete | No, expect lane closures | No | Cipparone | 6/4/18 | TBA | Concrete Slab Replacement |
*Crooks Road (PERMIT PROJECT) | North of Maple Road | Troy | City of Troy water main work | No, outside (right) northbound and southbound lanes will close. Traffic will use left (inside) lane in closure areas. | No | City of Troy | 8/10/18 | 8?2/18 | Weekend, Emergency & Short-Term Road Closures |
Dequindre Road (Phase II) | Burningbush Drive to Long Lake Road | Troy and Sterling Heights border | Widening to 5 lanes with center left-turn lane, traffic signal upgrades, improved drainage, Americans with Disabilities Act (ADA) compliant crosswalks | No | No | Dan's Excavating | 3/5/18 | Late Fall | Dequindre Road |
19 Mile Road/Square Lake Road (part of the Dequindre Road project) | 19 Mile Road/Square Lake Road at Dequindre Road (ONLY EAST HALF OF INTERSECTION IS CLOSED) | Troy and Sterling Heights | Intersection drainage improvements and paving | Yes, just the east half of the 19 Mile/Square Road intersection | 18 Mile Road/Long Lake Road to Ryan Road to Dequindre Rd, back to 19 Mile/Square Lake Rd and vice versa | Dan's Excavating | 8/10/18 | Early September | Dequindre Road |
Joint Replacement | Various heavier traveled roads throughout Oakland County | Various | Milling out road joints and filling with hot mix asphalt | No; however, expect lane restrictions in work zones | No | Cadillac Asphalt | 7/30/18 | Early October | Road Joint Repairs |
*Lahser Road and 13 Mile Road (PERMIT PROJECT) | Lahser Road and 13 Mile Road intersection | Beverly Hills | Consumers Energy gas utility work | No | No; however, there are lane restrictions | Consumers Energy | 8/15/18 | Mid-October | Weekend, Emergency & Short-Term Road Closures |
*Lansdowne Road bridge over William Lake Canal | Hatchery Road and Williams Lake Road | Waterford Township | Bridge maintenance including removal of surface, waterproofing bridge deck and resurfacing with hot-mix asphalt | Yes | Hatchery Rd to Airport Rd to Williams Lake Rd, back to Lansdowne Rd and vice versa | Z Contractors | 8/6/18 | Late August | Lansdowne Road Bridge |
Livernois Road | Maple Road and Big Beaver Road | Troy | Paving and concrete repairs | No | No | Cadillac Asphalt | 8/7/18 | Mid-September | Livernois Road |
*Manor Road Bridge | East of Woodward Avenue | Bloomfield Township | Bridge maintenance including removal of gravel surface, deck sealing and paving bridge deck and approaches with asphalt | Yes | Big Beaver Rd to Adams Rd to Abbey St to Warwick St, back to Manor Rd and vice versa | Z Contractors | 8/20/18 | Early September (after Labor Day) | Manor Road Bridge |
Middlebelt Road (PERMIT PROJECT) | 10 Mile Road and 14 Mile Road | Farmington Hills | Replacement of high pressure gas transmission line | No, currently under flag control from 9 a.m. - 3 p.m. daily | No; however, Middlebelt Rd between 11 Mile and 12 Mile roads remains closed | Consumers Energy | Late April | Late summer | Consumers Energy |
*Middlebelt Road (PERMIT PROJECT) | 11 Mile and 12 Mile Road | Farmington Hills | Consumers Energy installation of high pressure gas main | Yes (local and emergency access maintained) | 11 Mile Rd to Orchard Lake Rd to 12 Mile Rd, back to Middlebelt Rd and vice versa | Consumers Energy | 6/16/18 | 8/24/18 (tentatively) | Traffic Alerts |
Opdyke Road | Auburn Road to Perry Road | Pontiac and Auburn Hills | Bridge replacement over the Clinton River, resurfacing, Americans with Disabilities Act compliant crosswalks/bus stops, improved drainage, construction of a pedestrian pathway from Auburn Rd to I-75 & water main work between Featherstone and Walton Blvd | Yes, between Auburn Road and M-59 is closed for bridge replacement, two-way traffic maintained from M-59 to Perry Road | Auburn Rd to Martin Luther King Blvd to Featherstone, back to Opdyke Rd and vice versa | Dan's Excavating | 6/18/18 | Mid-October | Opdyke Road |
Pine Tree Road | Clarkston Road to Heights Road | Orion Township | Road rehabilitation including paving, ditching, drainage improvements and Americans with Disabilities Act compliant sidewalks | Yes. Residential traffic will be maintained | Clarkston Rd to Joslyn Rd to Heights Rd, back to Pine Tree Rd and vice versa | Cadillac Asphalt | 8/6/18 | Mid-September | Pine Tree Road |
*Pontiac Lake Road (PERMIT PROJECT) | Irwindale Drive and Wadsworth Street | Waterford Township | Storm sewer work | Yes | TBA | Waterford Schools | Postponed by contractor (new dates pending) | TBA | Weekend, Emergency & Short-Term Road Closures |
Preservation Overlays | Various heavier traveled roads throughout Oakland County | Various | Simple resurfacing, placing 1.5-2 inches of asphalt on the road surface; work is weather-dependent | No | No | Ajax Paving | April | Late Summer (Lincoln Rd from Telegraph to Lahser is the remaining project) | 2018 Preservation Overlay (list and schedule) |
Rattalee Lake Road (PERMIT PROJECT) | Bridge Lake Road and Ellis Road | Springfield Township | Pipeline maintenance | Yes | Bridge Lake Rd to Knox Rd to Ellis Rd, back to Rattalee Lake Rd and vice versa | Buckeye Pipeline | 8/13/18 | 8/22/18 | Weekend, Emergency & Short-Term Road Closures |
Secord Lake Road Bridge | Leonard Road and McKail Road | Addison Township | Bridge maintenance including removal of surface, waterproofing bridge deck and resurfacing with hot-mix asphalt | Yes | Leonard Rd to Hagerman Rd to McKail Rd, back to Secord Lake Rd and vice versa | Z Contractors | 9/17/18 | 10/8/18 | Secord Lake Road Bridge |
South Blvd over Ferry Creek Drain | West of John R | Rochester Hills and Troy | Culvert replacement | Yes | TBA | Z Contractors | October, TBA | Z Contractors | South Blvd Over Ferry Creek Drain |
South Blvd. | Adams Road and Crooks Road | Rochester Hills and Troy | Resurfacing, drainage improvements, traffic signal upgrades and Borden Drain culvert replacement. South Blvd from Crooks to Coolidge will be partially reconstructed | Yes, road is closed to eastbound traffic from Coolidge to Adams; westbound South Blvd from Coolidge to Adams remains open | For eastbound traffic (between Adams and Coolidge) South Blvd. to Squirrel Rd to Square Lake Rd to Crooks Rd, back to South Blvd and vice versa | Pro-Line Asphalt | 6/20/18 | Mid-September | South Blvd |
Tripp Road | Van Road to Dixie Highway | Groveland Township | Reconstruction of road including culvert replacement, improved drainage, widening/paving of road shoulders, curb and gutter installation | Yes | Dixie Hwy to Grange Hall Rd, back to Tripp Rd and vice versa | Angelo Iafrate | 7/30/18 | Mid-November | Tripp Road |
*Union Lake Road (PERMIT PROJECT) | Cooley Lake Road and Cooley Beach Drive | White Lake, West Bloomfield and Waterford townships | Road improvements and underground utility work to accommodate future development | Yes | Williams Lake Rd to Elizabeth Lake Rd, back to Cooley Lake Rd and vice versa | Ronnisch Construction group | 8/20/18 | 8/31/18 | Weekend, Emergency & Short-Term Road Closures |
Walton Blvd. | Adams Road and Squirrel Road | Auburn Hills and Rochester Hills | Replacement of three culverts, improved drainage, concrete curbs/gutters and resurfacing | No, two-way traffic is shifted to the north half of Walton Blvd. Firewood and Bellarmine drives are closed at Walton Blvd. | No, Firewood and Bellarmine drives are closed at Walton Blvd. Residents can use Tienken or Adams roads. | Z Contractors | 5/14/18 | Late fall (remaining resurfacing work could take place in 2019) | Walton Blvd Culvert Replacement |
*Walton Blvd. (PERMIT PROJECT) | Sashabaw Road and Clintonville Road | Waterford Township | Pedestrian bridge replacement between Dill Drive and Frankman Ave | Yes | Sashabaw Rd to Maybee Rd to Clintonville Rd to Lake Angelus Rd, back to Walton Blvd | Waterford Schools/Heritage Contractors | 8/28/18 (9:00 a.m.) | 8/28/18 (late evening) | Weekend, Emergency & Short-Term Road Closures |
*Hospital Road (PERMIT PROJECT) *new | Highland Road (M-59) and Pontiac Lake Road | Waterford Township | Sanitary sewer and water main work | Yes, just south of Highland Rd (M-59) | Highland Rd (M-59) to Airport Rd to Pontiac Lake Rd, back to Hospital Rd and vice versa | Bloom General Contractors (private development) | 8/23/18 | 8/31/18 | Weekend, Emergency & Short-Term Road Closures |