*Adams Road | Square Lake Road and South Blvd | Troy and Bloomfield Township | Resurfacing, drainage improvements, shoulder widening and traffic signal upgrades | Yes, southbound traffic will be detoured. Northbound Adams will remain open to traffic | Southbound Adams Rd traffic detour is South Blvd to Squirrel Rd to Square Lake Rd, back to Adams Rd | Ajax | 8/8/18 | Late October | Adams Road, South Blvd to Square Lake Road |
Baldwin Road (Phase I) | Phase I-Morgan Road to Gregory Road 2017-2018; Phase II-Gregory to Waldon 2018-2019 | Orion Township | Reconstruction of Baldwin Road including: 5 roundabouts, widening, Americans with Disabilities Act (ADA) compliant crosswalks, improved lighting, pedestrian paths, concrete curb and gutter | No; intermittent lane closures (NB and SB Baldwin Road traffic maintained) | No | Dan's Excavating (Phase I contractor) | 4/2/18 | Late Fall (Phase II will begin Spring of 2019) | Baldwin Road |
Gregory Road (part of the Baldwin Road Phase I project) | Gregory Road at Baldwin Road | Orion Township | Storm sewers, drainage, water main and pavement preparation | Yes | Baldwin Rd to Morgan Rd to Rohr Rd, back to Gregory Rd and vice versa | Dan's Excavating | 5/14/18 | August, TBA | Baldwin Road |
*Bass Lake Road | South of Sleeth Road | Commerce Township | Culvert replacement | Yes | Sleeth Rd to Benstein Rd, back to Bass Lake Rd | RCOC | 7/28/18 | 7/28/18 (evening) | Weekend, Emergency & Short-Term Closures |
Concrete Slab Replacements | Various heavier traveled roads | Various | Remove and replace concrete | No, expect lane closures | No | Cipparone | 6/4/18 | TBA | Concrete Slab Replacement |
Dequindre Road (Phase II) | Burningbush Drive to Long Lake Road | Troy and Sterling Heights border | Widening to 5 lanes with center left-turn lane, traffic signal upgrades, improved drainage, Americans with Disabilities Act (ADA) compliant crosswalks | No | No | Dan's Excavating | 3/5/18 | Late Fall | Dequindre Road |
Elizabeth Lake Road (PERMIT PROJECT) | Highland Road (M-59) and Teggerdine Road | White Lake Township | Water main work | Yes | Highland Rd (M-59) to Teggerdine Rd, back to Elizabeth Lake Rd and vice versa | McCarthy and Smith | 7/20/18 | 7/30/18 | Weekend, Emergency & Short-Term Road Closures |
Inkster Road | North of 14 Mile Road | Bloomfield Township and West Bloomfield Township | Roadside bank is repaired. Curb/pavement repair work is ongoing. Inkster Road will be milled and paved with asphalt from 14 Mile to Lone Pine Road | Yes, NB Inkster Rd remains closed for pavement and curb replacement | 14 Mile Rd to Middlebelt Rd to Maple Rd, back to Inkster Rd | CI Contracting | 7/17/18 | August, TBA | Weekend, Emergency & Short-Term Road Closures |
*Joint Replacement | Various heavier traveled roads throughout Oakland County | Various | Milling out road joints and filling with hot mix asphalt | No; however, expect lane restrictions in work zones | No | Cadillac Asphalt | Late July, TBA | Early October | Road Joint Repairs |
Livernois Road | Maple Road and Big Beaver Road | Troy | Paving and concrete repairs | No | No | Cadillac Asphalt | TBA | TBA | Livernois Road |
Maple Road (Phase II) | Halsted Road to Drake Road | West Bloomfield Township | Reconstruction including center turn lane, right turn lane extensions, drainage improvements, traffic-signal modernizations | No | No | Dan's Excavating | 4/9/18 | COMPLETE | Maple Road (Drake to Halsted) |
Middlebelt Road (PERMIT PROJECT) | 10 Mile Road and 14 Mile Road | Farmington Hills | Replacement of high pressure gas transmission line | No, currently under flag control from 9 a.m. - 3 p.m. daily | No | Consumers Energy | Late April | Late summer | Consumers Energy |
Middlebelt Road (PERMIT PROJECT) | 11 Mile and 12 Mile Road | Farmington Hills | Consumers Energy installation of high pressure gas main | Yes (local and emergency access maintained) | 11 Mile Rd to Orchard Lake Rd to 12 Mile Rd, back to Middlebelt Rd and vice versa | Consumers Energy | 6/16/18 | 8/10/18 | Traffic Alerts |
Opdyke Road | Auburn Road to Perry Road | Pontiac and Auburn Hills | Bridge replacement over the Clinton River, resurfacing, Americans with Disabilities Act compliant crosswalks/bus stops, improved drainage, construction of a pedestrian pathway from Auburn Rd to I-75 & water main work between Featherstone and Walton Blvd. | Yes, between Auburn Road and M-59 is closed for bridge replacement, two-way traffic maintained from M-59 to Perry Road | Auburn Rd to Martin Luther King Blvd to Featherstone, back to Opdyke Rd and vice versa | Dan's Excavating | 6/18/18 | Mid-October | Opdyke Road |
*Pine Tree Road | Clarkston Road to Heights Road | Orion Township | Road rehabilitation including paving, ditching, drainage improvements and Americans with Disabilities Act compliant sidewalks | Yes. Residential traffic will be maintained | Clarkston Rd to Joslyn Rd to Heights Rd, back to Pine Tree Rd and vice versa | Cadillac Asphalt | 8/6/18 | Mid-September | Pine Tree Road |
Preservation Overlays | Various heavier traveled roads throughout Oakland County | Various | Simple resurfacing, placing 1.5-2 inches of asphalt on the road surface; work is weather-dependent | No, mostly done under flag control | No | Ajax Paving | April | Various dates through the end of July | 2018 Preservation Overlay (list and schedule) |
South Blvd | Coolidge Hwy to Adams Road | Rochester Hills and Troy | Culvert replacement just west of Coolidge Hwy | Yes | Squirrel Rd to Square Lake Rd to Crooks Rd, back to South Blvd and vice versa | Pro-Line Asphalt | 7/16/18 at 7:00 a.m. | 7/21/18 (once open, eastbound South Blvd from Coolidge Hwy to Adams will remain closed. Westbound South Blvd will open to traffic. | South Blvd |
South Blvd over Ferry Creek Drain | West of John R | Rochester Hills and Troy | Culvert replacement | Yes | TBA | Z Contractors | October, TBA | Z Contractors | South Blvd Over Ferry Creek Drain |
South Blvd. | Adams Road and Crooks Road | Rochester Hills and Troy | Resurfacing, drainage improvements, traffic signal upgrades and Borden Drain culvert replacement. South Blvd from Crooks to Coolidge will be partially reconstructed. | Yes, just west of Coolidge Hwy for culvert replacement. Once complete, the road will be open to westbound traffic from Coolidge to Adams; eastbound South Blvd will remain closed | South Blvd. to Squirrel Rd to Square Lake Rd to Crooks Rd, back to South Blvd and vice versa. | Pro-Line Asphalt | 6/20/18 | Mid-September | South Blvd |
*Tripp Road | Van Road to Dixie Highway | Groveland Township | Reconstruction of road including culvert replacement, improved drainage, widening/paving of road shoulders, curb and gutter installation. | Yes | Dixie Hwy to Grange Hall Rd, back to Tripp Rd and vice versa | Angelo Iafrate | 7/30/18 | Mid-November | Tripp Road |
Walton Blvd. | Adams Road and Squirrel Road | Auburn Hills and Rochester Hills | Replacement of three culverts, improved drainage, concrete curbs/gutters and resurfacing | No, two-way traffic is shifted to the north half of Walton Blvd. Firewood and Bellarmine drives are closed at Walton Blvd. | No, Firewood and Bellarmine drives are closed at Walton Blvd. Residents can use Tienken or Adams roads. | Z Contractors | 5/14/18 | Late fall (remaining resurfacing work could take place in 2019) | Walton Blvd Culvert Replacement |
West Long Lake Road
| Corporate Drive to Tower Drive
| Troy
| Concrete slab replacement
| No
| No
| Rigid Pavement Construction
| 6/18/18
| COMPLETE | Concrete Slab Replacements |
West Long Lake Road | East and west approaches to Telegraph Road | Bloomfield Township | Remove concrete approaches at Telegraph Road and replace with asphalt | No, one lane maintained in each direction | No | Pro-Line Asphalt | 6/21/18 | Late July | West Long Lake Road at Telegraph |
*Wixom Road | Over the Huron River, just south of Wixom Trail | Milford and Commerce townships | Bridge replacement | Yes, road will close over Huron River. The waterway will close for culvert demolition from 7/29 at 9 p.m. -8/3 along with other brief periods for construction | Glengary Rd to Benstein Rd to Bass Lake Rd to Sleeth Rd, back to Wixom Rd and vice versa | Grand River Construction | 7/29/18 | Late October | Wixom Road bridge over Huron River |
Wood Trail (subdivision road) | South of Drahner, between M-24 and Newman Road | Oxford Township | Culvert replacement | Yes, closed to through vehicle traffic. Polly Ann Trail (a pedestrian/bike trail) is closed at Paint Creek | No set detour, residential traffic is maintained north and south of closure | Angelo Iafrate | 5/21/18 (road closed since 2/24/18 due to a culvert failure) | TBA | Weekend, Emergency & Short-Term Road Closures |