Baldwin Road (Phase I) | Phase I-Morgan Road to Gregory Road 2017-2018; Phase II-Gregory to Waldon 2018-2019 | Orion Township | Reconstruction of Baldwin Road including: 5 roundabouts, widening, Americans with Disabilities Act (ADA) compliant crosswalks, improved lighting, pedestrian paths, concrete curb and gutter | No; intermittent lane closures (NB and SB Baldwin Road traffic maintained) | No | Dan's Excavating (Phase I contractor) | 4/2/18 | Late Fall (Phase II will begin Spring of 2019) | Baldwin Road |
Gregory Road (part of the Baldwin Road Phase I project) | Gregory Road at Baldwin Road | Orion Township | Storm sewers, drainage, water main and pavement preparation | Yes | Baldwin Rd to Morgan Rd to Rohr Rd, back to Gregory Rd and vice versa | Dan's Excavating | 5/14/18 | Late August | Baldwin Road |
Concrete Slab Replacements | Various heavier traveled roads | Various | Remove and replace concrete | No, expect lane closures | No | Chaperone | 6/4/18 | TBA | Concrete Slab Replacement |
Dequindre Road (Phase II) | Burningbush Drive to Long Lake Road | Troy and Sterling Heights border | Widening to 5 lanes with center left-turn lane, traffic signal upgrades, improved drainage, Americans with Disabilities Act (ADA) compliant crosswalks | No | No | Dan's Excavating | 3/5/18 | Late Fall | Dequindre Road |
*Square Lake Road (Part of the Dequindre Road project) | Square Lake (19 Mile) Road at Dequindre Road (ONLY WEST HALF OF INTERSECTION IS CLOSED) | Troy and Sterling Heights | Intersection paving | Yes, just the west half of Square Lake (19 Mile) Road at Dequindre Road | Click here for various detour routes | Dan's Excavating | 5/21/18 | 6/29/18 (late evening) | Dequindre Road |
Inkster Road | North of 14 Mile Road | Bloomfield Township and West Bloomfield Township | Repair of a failed roadside bank | Yes, just northbound Inkster is closed at 14 Mile Road. Southbound Inkster Road remains open to traffic. | 14 Mile Rd to Middlebelt Rd to Maple Rd, back to Inkster Rd | RCOC | 6/15/18 (emergency closure of northbound Inkster Rd) | TBA | Weekend, Emergency & Short-Term Road Closures |
Joint Replacement | Various heavier traveled roads throughout Oakland County | Various | Milling out road joints and filling with hot mix asphalt | No; however, expect lane restrictions in work zones | No | Cadillac Asphalt | TBA | TBA | Road Joint Repairs |
Maple Road (Phase II) | Halsted Road to Drake Road | West Bloomfield Township | Reconstruction including center turn lane, right turn lane extensions, drainage improvements, traffic-signal modernizations | Yes, westbound Maple Road is closed; however, 2-way traffic maintained between Drake and Ring roads (Henry Ford Hospital Entrance). Eastbound Maple Road remains open to traffic | Westbound Maple Road detour is Haggerty Rd to 14 Mile Rd to Drake Rd back to Maple Rd and vice versa | Dan's Excavating | 4/9/18 | Late July | Maple Road (Drake to Halsted) |
*Halsted Road (part of the Maple Road Phase II project) | South half of intersection | West Bloomfield Township | Intersection improvements and paving | Yes, south leg of intersection | SB Halsted: EB Maple Rd to SB Drake Rd to WB 14 Mile Rd, back Halsted Rd. NB Halsted: WB 14 Mile Rd to SB Haggerty Rd to EB Maple Rd, back to Halsted Rd. | Dan's Excavating | 6/11/18 | Early July | Maple Road (Drake to Halsted) |
Middlebelt Road (PERMIT PROJECT) | 10 Mile Road and 14 Mile Road | Farmington Hills | Replacement of high pressure gas transmission line | No, currently under flag control from 9 a.m. - 3 p.m. daily | No | Consumers Energy | Late April | Late summer | Consumers Energy |
Middlebelt Road (PERMIT PROJECT) | 11 Mile and 12 Mile Road | Farmington Hills | Consumers Energy installation of high pressure gas main | Yes (local and emergency access maintained) | 11 Mile Rd to Orchard Lake Rd to 12 Mile Rd, back to Middlebelt Rd and vice versa | Consumers Energy | 6/16/18 | 8/10/18 | Traffic Alerts |
Napier Road | 9 Mile to 10 Mile Road | Novi/Lyon Township border | Gravel road paving, improved drainage, paved shoulders and guardrail installation in necessary areas. | Yes (residential access maintained) | 8 Mile Rd to Beck Rd to 10 Mile Rd, back to Napier Rd and vice versa. | Dan's Excavating | 4/9/18 | Mid-July | Napier Road |
Opdyke Road | Auburn Road to Perry Road | Pontiac and Auburn Hills | Bridge replacement over the Clinton River, resurfacing, Americans with Disabilities Act compliant crosswalks/bus stops, improved drainage, construction of a pedestrian pathway from Auburn Rd to I-75 & water main work between Featherstone and Walton Blvd. | Yes, between Auburn Road and M-59 will close for bridge replacement, two-way traffic maintained from M-59 to Perry Road | Auburn Rd to Martin Luther King Blvd to Featherstone, back to Opdyke Rd and vice versa | Dan's Excavating | 6/18/18 | Mid-October | Opdyke Road |
Preservation Overlays | Various heavier traveled roads throughout Oakland County | Various | Simple resurfacing, placing 1.5-2 inches of asphalt on the road surface; work is weather-dependent | No, mostly done under flag control | No | Ajax Paving | April | Various dates through the end of July | 2018 Preservation Overlay (list and schedule) |
*South Blvd. | Crooks Road to Adams Road | Rochester Hills and Troy | Resurfacing, drainage improvements, traffic signal upgrades and Borden Drain culvert replacement. South Blvd from Crooks to Coolidge will be partially reconstructed. | Yes, just west of Coolidge Hwy for culvert replacement. Once complete, the road will be open to westbound traffic from Coolidge to Adams, eastbound lanes will remain closed (date to be announced) | South Blvd. to Squirrel Rd to Square Lake Rd to Crooks Rd, back to South Blvd and vice versa. | Proline Asphalt | 6/20/18 | Mid-September | South Blvd. |
Tripp Road | Van Road to Dixie Highway | Groveland Township | Reconstruction of road including culvert replacement, improved drainage, widening/paving of road shoulders, curb and gutter installation. | Yes, date to be announced | Dixie Hwy to Grange Hall Rd, back to Tripp Rd and vice versa | TBA | TBA | TBA | Tripp Road |
Walton Blvd. | Adams Road and Squirrel Road | Auburn Hills and Rochester Hills | Replacement of three culverts, improved drainage, concrete curbs/gutters and resurfacing | No, two-way traffic is shifted to the north half of Walton Blvd. Firewood and Bellarmine drives are closed at Walton Blvd. | No, Firewood and Bellarmine drives are closed at Walton Blvd. Residents can use Tienken or Adams roads. | Z Contractors | 5/14/18 | Late fall (remaining resurfacing work could take place in 2019) | Walton Blvd Culvert Replacement |
West Long Lake Road | Corporate Drive to Tower Drive | Troy | Concrete slab replacement | No, one lane maintained in each direction | No | Rigid Pavement Construction | 6/18/18 | Late July | Concrete Slab Replacement |
West Long Lake Road | East and west approaches to Telegraph Road | Bloomfield Township | Remove West Long Lake Road concrete approaches at Telegraph Road and replace with asphalt | No, one lane maintained in each direction | No | Pro-Line Asphalt Paving Corporation | 6/21/18 | Late July | West Long Lake Road at Telegraph |
Wood Trail (subdivision road) | South of Drahner, between M-24 and Newman Road | Oxford Township | Culvert replacement | Yes, closed to through vehicle traffic. Polly Ann Trail (a pedestrian/bike trail) is closed at Paint Creek | No set detour, residential traffic is maintained north and south of closure | Angelo Iafrate | 5/21/18 (road closed since 2/24/18 due to a culvert failure) | Late July | Weekend, Emergency & Short-Term Road Closures |