Baldwin Road (Phase I) | Phase I-Morgan Road to Gregory Road 2017-2018; Phase II-Gregory to Waldon 2018-2019 | Orion Township | Reconstruction of Baldwin Road including: 5 roundabouts, widening, Americans with Disabilities Act (ADA) compliant crosswalks, improved lighting, pedestrian paths, concrete curb and gutter | No; intermittent lane closures (NB and SB Baldwin Road traffic maintained) | No | Dan's Excavating (Phase I contractor) | 4/2/18 | Late Fall (Phase II will begin Spring of 2019) | Baldwin Road |
Gregory Road (part of the Baldwin Road Phase I project) | Gregory Road at Baldwin Road | Orion Township | Storm sewers, drainage, water main and pavement preparation | Yes, Gregory Road will be closed at Baldwin Road | Baldwin Rd to Morgan Rd to Rohr Rd, back to Gregory Rd and vice versa | Dan's Excavating | April, TBA | TBA | Baldwin Road |
Morgan Road (part of the Baldwin Road Phase I project) | Morgan Road at Baldwin Road | Orion Township | Storm sewers, drainage, water main and pavement preparation. | Yes, Morgan Road will be closed at Baldwin Road **Will not be closed the same time as Gregory Road** | Baldwin Rd to Gregory Rd to Rohr Rd, back to Morgan Rd and vice versa | Dan's Excavating | TBA | TBA | Baldwin Road |
Concrete Slab Replacement | Various heavier traveled roads throughout Oakland County | Various | Removing sections of road and replacing with concrete; work is weather-dependent | Only lane closures; concrete can take up to 7 days to cure before allowing traffic back on repaired sections | No | TBA | TBA | TBA | 2018 Concrete Slab Replacement (list and schedule) |
Dequindre Road (Phase II) | Burningbush Drive to Long Lake Road | Troy and Sterling Heights border | Widening to 5 lanes with center left-turn lane, traffic signal upgrades, improved drainage, Americans with Disabilities Act (ADA) compliant crosswalks | No | No | Dan's Excavating | 3/5/18 | Late Fall | Dequindre Road |
Maple Road (Phase II) | Halsted Road to Drake Road | West Bloomfield Township | Reconstruction including center turn lane, right turn lane extensions, drainage improvements, traffic-signal modernizations | Yes, westbound Maple Road is closed; however, 2-way traffic maintained between Drake and Ring roads (Henry Ford Hospital Entrance). Eastbound Maple Road will remain open to traffic. | Westbound Maple Road detour is Haggerty Rd to 14 Mile Rd to Drake Rd back to Maple Rd and vice versa | Dan's Excavating | 4/9/18 | Late July | Maple Road (Drake to Halsted) |
*Halsted Road (part of the Maple Road Phase II project) | North leg of intersection | West Bloomfield Township | Intersection improvements and paving | Yes, north leg of intersection | SB Halsted detour: WB Walnut Lake Rd to SB Haggerty Rd to EB Maple Rd, back to Halsted; NB Halsted detour: EB Maple Road to NB Drake Rd to WB Walnut Lake Rd, back to Halsted Rd | Dan's Excavating | 4/30/18 | Mid-May | Maple Road (Drake to Halsted) |
*Milford Road | White Lake Road and Davisburg Road (near Munger Road) | Highland and Rose townships | Culvert replacement | Yes | Clyde Rd to Hickory Ridge Rd to Fenton Rd, back to Milford Rd and vice versa | RCOC | 4/28/18 (4/29/18 is the back-up date in case of inclement weather) | 4/28/18 | Weekend, Emergency & Short-Term Road Closures |
Napier Road | 9 Mile to 10 Mile Road | Novi/Lyon Township border | Gravel road paving, improved drainage, paved shoulders and guardrail installation in necessary areas. | Yes (residential access maintained) | 8 Mile Rd to Beck Rd to 10 Mile Rd, back to Napier Rd and vice versa. | Dan's Excavating | 4/9/18 | Mid-July | Napier Road |
Preservation Overlays | Various heavier traveled roads throughout Oakland County | Various | Simple resurfacing, placing 1.5-2 inches of asphalt on the road surface; work is weather-dependent | No, mostly done under flag control | No | Ajax Paving | April | Late summer | 2018 Preservation Overlay (list and schedule) |
Tripp Road | Van Road to Dixie Highway | Groveland Township | Reconstruction of road including culvert replacement, improved drainage, widening/paving of road shoulders, curb and gutter installation. | Yes, date to be announced | Dixie Hwy to Grange Hall Rd, back to Tripp Rd and vice versa | TBA | TBA | TBA | Tripp Road |
Walton Blvd. (Permit Project) | East of Squirrel Road | Auburn Hills | Gas utility relocation work for upcoming Walton Blvd culvert replacement project | No; however, inside (left) lane is closed in both directions Monday through Friday | No | Consumers Energy | 3/14/18 | Late April | Walton Blvd Culvert Replacement |
Wood Trail (subdivision road) | South of Drahner, between M-24 and Newman Road | Oxford Township | Culvert replacement | Yes, closed to through vehicle traffic. Polly Ann Trail (a pedestrian/bike trail) is closed on both sides of the road. | No set detour, residential traffic is maintained north and south of closure | TBA | 2/24/18 Road closed due to culvert failure | TBA | Weekend, Emergency & Short-Term Road Closures |