*Dequindre Road/Square Lake Road (19 Mile) intersection part of Dequindre Road project
| Dequindre/ Square Lake Road (19 Mile) intersection
| Troy and Sterling Heights border
| Storm sewer replacement
| Yes, intersection is closed
| John R Rd to South Blvd to Dobry Dr to Ryan Rd to 18 Mile Rd, back to Dequindre Rd and vice versa
| Dan's Excavating
| 10/17/17
| 11/8/17 (evening)
| Dequindre Road
|
*Maple Road
| East of Middlebelt Road
| West Bloomfield Township
| Soil boring and survey work for future road construction project
| Yes
| Middlebelt Rd to Walnut Lake Rd to Inkster Rd, back to Maple Rd and vice versa
| G2 Consulting
| 11/11/17
| 11/11/17 (evening)
| Weekend & Short Term Road Closures
|
*Maple Road (part of the Maple Road project)
| Haggerty Road to Halsted Road
| West Bloomfield Township
| Culvert repairs (between Eastbrook and Silverbrook roads)
| Yes, closed to through traffic. Residential, business and hospital traffic will be maintained
| Drake Rd to 14 Mile Rd to Haggerty Rd, back to Maple Rd and vice versa
| Dan's Excavating
| 11/7/17
| 11/30/17
| Maple Road (Haggerty to Drake)
|
12 Mile Road
| East of Telegraph
| Southfield
| Concrete patching
| No; however, there will be a lane restriction
| No
| Cipperone Contracting Inc.
| 11/1/17
| Substantially complete
| Concrete Slab Replacement
|
12 Mile Road
| Haggerty Road and Farmington Road
| Farmington Hills
| Concrete slab replacement
| No, lane closures throughout project
| No
| Florence Cement
| 8/14/17
| 11/10/17 (weather dependent)
| 12 Mile Road (Haggerty to Farmington)
|
Andersonville/Airport Road intersection (PERMIT PROJECT)
| Andersonville/Airport Road intersection
| Waterford Township
| Gas main break
| No
| No
| Consumers Energy
| 10/31/17
| COMPLETE
| Consumers Energy
|
Baldwin Road
| Phase 1-Morgan Road to Gregory Road 2017-2018: Phase 2-Gregory to Waldon 2018-2019
| Orion Township
| Reconstruction of Baldwin Road including: 5 roundabouts, widening, Americans with Disabilities Act (ADA) compliant crosswalks, improved lighting, pedestrian paths, concrete curb and gutter
| No; intermittent lane closures
| No
| Dan's Excavating (Phase 1 contractor)
| 7/18/17 (water main relocation and building demolition) Project will resume in the Spring of 2018 & 2019
| Carryover project through 2018 (Phase 1)
| Baldwin Road
|
Big Beaver Road (PERMIT PROJECT)
| John R to east of Dequindre
| Troy and Sterling Heights border
| Macomb County Department of Roads concrete replacement on 16 Mile Road east of Dequindre
| No, lane restrictions begin on eastbound Big Beaver near John R
| No
| Macomb County Department of Roads
| 10/4/17
| Late November
| Macomb County Department of Roads
|
Dequindre Road (2-year project)
| Burningbush Drive to Long Lake Road
| Troy and Sterling Heights border
| Widening to 5 lanes with center left-turn lane, traffic signal upgrades, improved drainage, Americans with Disabilities Act (ADA) compliant crosswalks
| Yes, Dequindre/Square Lake Rd (19 Mile) intersection is closed for storm sewer replacement, approximately 10/17/17-11/15/17
| Yes, for the intersection closure, the detour is John R Rd to South Blvd to Dobry Rd to Ryan Road to 18 Mile Rd back to Dequindre and vice versa
| Dan's Excavating
| 9/18/17
| Carryover project through 2018
| Dequindre Road
|
Greenfield Road
| 9 Mile Road and 10 Mile Road
| Southfield
| Concrete slab replacement
| No
| No
| Cipparrone Contracting Inc.
| Late September
| COMPLETE
| Concrete Slab Replacement
|
Lahser Road
| Just south of Long Lake Road
| Bloomfield Township
| Milling and paving approximately 1,300 feet just south of intersection
| No
| No
| Ajax
| 11/2/17
| COMPLETE
| Preservation Overlays
|
Livernois Road
| North of Square Lake Road over the Gibson Drain
| Troy
| Culvert replacement
| Yes
| Square Lake Rd to Crooks Rd to South Blvd; back to Livernois Rd and vice versa
| L. D'Agostini and Sons, Inc.
| 11/8/17
| Late November
| Livernois Rd Culvert Replacement
|
Maple Road (Phase I)
| Haggerty Road to Halsted Road
| West Bloomfield Township
| Reconstruction including center turn lane, right turn lane extensions, drainage improvements, traffic-signal modernizations
| Yes, westbound lane is closed. Eastbound lane will remain open to traffic
| 14 Mile Road for westbound traffic
| Dan's Excavating
| 7/24/17
| Late November (Phase 2 from Halsted to Drake will begin Spring 2018)
| Maple Road (Haggerty to Drake)
|
Napier Road
| 9 Mile to 10 Mile Road
| Novi/Lyon Township border
| Excavation and drainage work
| Yes (only residential access will be maintained)
| Eight Mile Rd to Beck Rd to 10 Mile Rd; back to Napier Rd and vice versa
| Dan's Excavating
| 11/10/17
| 1/5/18 (paving work to begin in spring of 2018)
| Napier Road
|
Napier Road/10 Mile Road
| Intersection of Napier/10 Mile Road; including 10 Mile Road east and west of Napier Road (PHASE I)
| Lyon Township and City of Novi
| Reconstruction of intersection to a roundabout, hill cut on 10 Mile Road west of Napier and reconstruction of 10 Mile from Copperwood to Nepavine Dr.
| No
| No
| Dan's Excavating
| 7/17/17
| Open to traffic (work continues on pedestrian crossings and DTE street lighting through December)
| Napier/10 Mile Road
|
Orchard Lake Road
| North of Northwestern Hwy. to just south of Maple Road
| West Bloomfield Township
| Reconstruction of road to a 4-lane boulevard, elimination of service drive east of Orchard Lake Rd, construction of pedestrian paths, ADA compliant crosswalks, improved drainage
| No (Powers Rd intersection realignment is complete and open to traffic)
| No
| Dan's Excavating
| 6/12/17
| Late November
| Orchard Lake Road Construction
|
Sashabaw Road (PERMIT PROJECT)
| Dixie Hwy and Walton Blvd
| Waterford Township
| Gas main and service line replacements
| No. Intermittent lane closures for the work will continue throughout the project.
| No
| Consumers Energy
| 10/4/17
| Late November
| Consumers Energy
|
Snell Road
| East of Rochester Road near the Oakland & Macomb border
| Oakland and Washington townships
| Culvert replacement
| Yes
| Sheldon Rd to Gunn Rd to Mt. Vernon Rd, back to Snell Rd and vice versa
| Toebe Construction
| 10/25/17
| Mid November
| Snell Road
|
Southfield Road
| 12 Mile and 13 Mile Roads
| Southfield
| Concrete patching on southbound right (outer) lane and right turn lane just south of 12 Mile Road
| No
| No, business access will be maintained
| Cipperone Contracting Inc.
| 11/6/17
| Late November
| Concrete Slab Replacement
|
Southfield Road
| Southbound Southfield Road north and south of 10 Mile Road intersection; including eastbound 10 Mile approach
| Southfield
| Concrete patching on southbound left (inner) lane and eastbound 10 Mile approach to Southfield
| No; however, there will be lane restrictions
| No
| Cipperone Contracting Inc.
| 11/6/17
| Late November
| Concrete Slab Replacement
|