*Haggerty/ Maple Road intersection (part of the Maple Road project)
| Haggerty/ Maple Road
| West Bloomfield
| Haggerty Road will close at Maple Road for construction
| Yes (eastbound Maple traffic at Haggerty will be maintained)
| 14 Mile Rd to M-5 to Pontiac Trail, back to Haggerty Rd and vice versa
| Dan's Excavating
| 10/28/17 (tentatively)
| 10/29/17
| Maple Road (Haggerty to Drake)
|
*Livernois Road
| North of Square Lake Road over the Gibson Drain
| Troy
| Culvert replacement
| Yes
| Square Lake Rd to Crooks Rd to South Blvd; back to Livernois Rd and vice versa
| L. D'Agostini and Sons, Inc.
| 11/8/17
| Late November
| Livernois Rd Culvert Replacement
|
*Powers Road (part of the Orchard Lake Road project)
| At Orchard Lake Road
| West Bloomfield Township
| Intersection realignment
| Yes, Powers Road is closed at Orchard Lake Road
| Daly Rd to Maple Rd to Orchard Lake Rd and vice versa
| Dan's Excavating
| 10/2/17
| 11/2/17 (tentatively)
| Orchard Lake Road Construction
|
*Snell Road
| East of Rochester Road near the Oakland & Macomb border
| Oakland and Washington townships
| Culvert replacement
| Yes
| Sheldon Rd to Gunn Rd to Mt. Vernon Rd, back to Snell Rd and vice versa
| Toebe Construction
| 10/25/17
| Mid November
| Snell Road
|
10 Mile Road (PERMIT PROJECT)
| At Pierce Road (west of Greenfield Road)
| Southfield
| Water main, sanitary/storm sewer and pavement repairs (City of Southfield project)
| Yes
| No
| Pamar Enterprises
| 6/16/17
| COMPLETE
| City of Southfield Engineering Dept.
|
12 Mile Road
| Haggerty Road and Farmington Road
| Farmington Hills
| Concrete slab replacement
| No, lane closures throughout project
| No
| Florence Cement
| 8/14/17
| Mid November
| 12 Mile Road (Haggerty to Farmington)
|
Baldwin Road
| Phase 1-Morgan Road to Gregory Road 2017-2018: Phase 2-Gregory to Waldon 2018-2019
| Orion Township
| Reconstruction of Baldwin Road including: 5 roundabouts, widening, Americans with Disabilities Act (ADA) compliant crosswalks, improved lighting, pedestrian paths, concrete curb and gutter
| No; intermittent lane closures
| No
| Dan's Excavating (Phase 1 contractor)
| 7/18/17 (water main relocation and building demolition) Project will resume in the Spring of 2018 & 2019
| Carryover project through 2018 (Phase 1)
| Baldwin Road
|
Big Beaver Road (PERMIT PROJECT)
| John R to east of Dequindre
| Troy and Sterling Heights border
| Macomb County Department of Roads concrete replacement on 16 Mile Road east of Dequindre
| No, lane restrictions begin on eastbound Big Beaver near John R
| No
| Macomb County Department of Roads
| 10/4/17
| Late November
| Macomb County Department of Roads
|
Brown Road (PERMIT PROJECT)
| Joslyn Road to Baldwin Road
| Orion Township and Auburn Hills
| Widening from current configuration to five lanes (Orion Township project)
| No, traffic maintained in both directions with continuous center left-turn lane
| No
| Pamar (per Orion Township)
| 7/18/17
| COMPLETE
| Brown Road
|
Dequindre Road (2-year project)
| Burningbush Drive to Long Lake Road
| Troy and Sterling Heights border
| Widening to 5 lanes with center left-turn lane, traffic signal upgrades, improved drainage, Americans with Disabilities Act (ADA) compliant crosswalks
| Yes, Dequindre/Square Lake Rd (19 Mile) intersection is closed for storm sewer replacement, approximately 10/17/17-11/15/17
| Yes, for the intersection closure, the detour is John R Rd to South Blvd to Dobry Rd to Ryan Road to 18 Mile Rd back to Dequindre and vice versa
| Dan's Excavating
| 9/18/17
| Carryover project through 2018
| Dequindre Road
|
Dequindre Road/Square Lake Road (19 Mile) intersection part of Dequindre Road project
| Dequindre/ Square Lake Road (19 Mile intersection)
| Troy and Sterling Heights border
| Storm sewer replacement
| Yes, intersection is closed
| John R Rd to South Blvd to Dobry Dr to Ryan Rd to 18 Mile Rd, back to Dequindre Rd and vice versa
| Dan's Excavating
| 10/17/17
| 11/15/17
| Dequindre Road
|
Greenfield Road
| 9 Mile Road and 10 Mile Road
| Southfield
| Concrete slab replacement
| No
| No
| Cipparrone Contracting Inc.
| Late September
| Late October
| Concrete Slab Replacement
|
Lahser Road
| 11 Mile Road to Civic Center Drive
| City of Southfield
| Reconstruction (from Northwestern Hwy to Civic Center) and concrete patching (from 11 Mile to Northwestern Hwy)
| No; some lane restrictions for behind the curb restoration work
| No
| Florence Cement
| 7/26/17
| COMPLETE
| Lahser Road
|
*Maple Road (part of the Maple Road project)
| Haggerty Road to Drake Road
| West Bloomfield Township
| Culvert repairs (between Eastbrook and Silverbrook roads)
| Yes, closed to through traffic. Residential, business and hospital traffic will be maintained
| Drake Rd to 14 Mile Rd to Haggerty Rd, back to Maple Rd and vice versa
| Dan's Excavating
| Late October (date to be announced)
| mid-November
| Maple Road (Haggerty to Drake)
|
Maple Road (Phase I)
| Haggerty Road to Halsted Road
| West Bloomfield Township
| Reconstruction including center turn lane, right turn lane extensions, drainage improvements, traffic-signal modernizations
| Yes, westbound lane is closed. Eastbound lane will remain open to traffic
| 14 Mile Road for westbound traffic
| Dan's Excavating
| 7/24/17
| Late November (Phase 2 from Halsted to Drake will begin Spring 2018)
| Maple Road (Haggerty to Drake)
|
Napier Road/10 Mile Road
| Intersection of Napier/10 Mile Road; including 10 Mile Road east and west of Napier Road (PHASE I)
| Lyon Township and City of Novi
| Reconstruction of intersection to a roundabout, hill cut on 10 Mile Road west of Napier and reconstruction of 10 Mile from Copperwood to Nepavine Dr.
| No
| No
| Dan's Excavating
| 7/17/17
| Open to traffic (work continues on pedestrian crossings and DTE street lighting through December)
| Napier/10 Mile Road
|
Orchard Lake Road
| North of Northwestern Hwy. to just south of Maple Road
| West Bloomfield Township
| Reconstruction of road to a 4-lane boulevard, elimination of service drive east of Orchard Lake Rd, construction of pedestrian paths, ADA compliant crosswalks, improved drainage
| No, one lane open in each direction with a center left-turn lane (Powers Rd intersection is closed for realignment from 10/2/17 through early November)
| No
| Dan's Excavating
| 6/12/17
| Late November
| Orchard Lake Road Construction
|
Sashabaw Road (PERMIT PROJECT)
| Dixie Hwy and Walton Blvd
| Waterford Township
| Gas main and service line replacements
| No. Intermittent lane closures for the work will continue throughout the project.
| No
| Consumers Energy
| 10/4/17
| Late November
| Consumers Energy
|