*10 Mile Road (PERMIT PROJECT)
| At Pierce Road (west of Greenfield Road)
| Southfield
| Water main, sanitary/storm sewer and pavement repairs (City of Southfield project)
| Yes
| Southfield Rd to Mt. Vernon Rd to Greenfield Rd back to 10 Mile and vice versa
| Pamar Enterprises
| 6/16/17
| Late October
| City of Southfield Engineering Dept.
|
*Haggerty/ Maple Road intersection (part of the Maple Road project)
| Haggerty/ Maple Road
| West Bloomfield
| Haggerty Road will close at Maple Road for construction
| Yes (eastbound Maple traffic at Haggerty will be maintained)
| 14 Mile Rd to M-5 to Pontiac Trail, back to Haggerty Rd and vice versa
| Dan's Excavating
| TBA
| TBA
| Maple Road (Haggerty to Drake)
|
*Maple Road (part of the Maple Road project)
| Haggerty Road to Drake Road
| West Bloomfield Township
| Culvert repairs (between Eastbrook and Silverbrook roads)
| Yes, will close to through traffic. Residential, business and hospital traffic will be maintained
| Drake Rd to 14 Mile Rd to Haggerty Rd, back to Maple Rd and vice versa
| Dan's Excavating
| TBA
| TBA
| Maple Road (Haggerty to Drake)
|
12 Mile Road
| Haggerty Road and Farmington Road
| Farmington Hills
| Concrete slab replacement
| 12 Mile has one lane open in each direction in the construction zones.
| No
| Florence Cement
| 8/14/17
| Mid November
| 12 Mile Road (Haggerty to Farmington)
|
12 Mile Road Drake Road at 12 Mile Road (part of the 12 Mile Road project)
| South of 12 Mile Road
| Farmington Hills
| Concrete slab replacement
| Complete, open to traffic
| No
| Florence Cement
| 9/27/17
| COMPLETE
| 12 Mile Road (Haggerty to Farmington)
|
Allen Road
| South of Ortonville Road (M-15)
| Brandon Township
| Culvert replacement
| Yes
| Ortonville Rd (M-15) to Oak Hill Rd, back to Allen Rd and vice versa
| RCOC Hwy Maintenance
| 10/23/17
| 10/23/17
| Weekend & Short-Term Closures
|
Baldwin Road
| Phase 1-Morgan Road to Gregory Road 2017-2018: Phase 2-Gregory to Waldon 2018-2019
| Orion Township
| Reconstruction of Baldwin Road including: 5 roundabouts, widening, Americans with Disabilities Act (ADA) compliant crosswalks, improved lighting, pedestrian paths, concrete curb and gutter
| No; intermittent lane closures
| No
| Dan's Excavating (Phase 1 contractor)
| 7/18/17 (water main relocation and building demolition) Project will resume in the Spring of 2018 & 2019
| Carryover project through 2018 (Phase 1)
| Baldwin Road
|
Big Beaver Road (PERMIT PROJECT)
| John R to east of Dequindre
| Troy and Sterling Heights border
| Macomb County Department of Roads concrete replacement on 16 Mile Road east of Dequindre
| No, lane restrictions begin on eastbound Big Beaver near John R
| No
| Macomb County Department of Roads
| 10/4/17
| Late November
| Macomb County Department of Roads
|
Brown Road (PERMIT PROJECT)
| Joslyn Road to Baldwin Road
| Orion Township and Auburn Hills
| Widening from current configuration to five lanes (Orion Township project)
| No, traffic maintained in both directions with continuous center left-turn lane
| No
| Pamar (per Orion Township)
| 7/18/17
| Late Fall
| Brown Road
|
Dequindre Road (2-year project)
| Burningbush Drive to Long Lake Road
| Troy and Sterling Heights border
| Widening to 5 lanes with center left-turn lane, traffic signal upgrades, improved drainage, Americans with Disabilities Act (ADA) compliant crosswalks
| Yes, Dequindre/Square Lake Rd (19 Mile) intersection is closed for storm sewer replacement, approximately 10/17/17-11/15/17
| Yes, for the intersection closure, the detour is John R Rd to South Blvd to Dobry Rd to Ryan Road to 18 Mile Rd back to Dequindre and vice versa
| Dan's Excavating
| 9/18/17
| Carryover project through 2018
| Dequindre Road
|
Dequindre Road/Square Lake Road (19 Mile) intersection part of Dequindre Road project
| Dequindre/ Square Lake Road (19 Mile intersection)
| Troy and Sterling Heights border
| Storm sewer replacement
| Yes, intersection is closed
| John R Rd to South Blvd to Dobry Dr to Ryan Rd to 18 Mile Rd, back to Dequindre Rd and vice versa
| Dan's Excavating
| 10/17/17
| 11/15/17
| Dequindre Road
|
Greenfield Road
| 9 Mile Road and 10 Mile Road
| Southfield
| Concrete slab replacement
| No
| No
| Cipparrone Contracting Inc.
| Late September
| Late October
| Concrete Slab Replacement
|
Lahser Road
| 11 Mile Road to Civic Center Drive
| City of Southfield
| Reconstruction (from Northwestern Hwy to Civic Center) and concrete patching (from 11 Mile to Northwestern Hwy)
| No
| No
| Florence Cement
| 7/26/17
| Substantially complete; behind the curb restoration ongoing
| Lahser Road
|
Livernois Road
| North of Square Lake Road over the Gibson Drain
| Troy
| Culvert replacement
| Yes
| Square Lake Rd to Crooks Rd to South Blvd; back to Livernois Rd and vice versa
| L. D'Agostini and Sons, Inc.
| 11/1/17
| Late November
| Livernois Rd Culvert Replacement
|
Maple Road
| West of Franklin Road
| Bloomfield Township
| Culvert replacement
| Yes
| Franklin Rd to Walnut Lake Rd to Inkster Rd, back to Maple Rd and vice versa
| RCOC Hwy Maintenance
| 10/21/17 (back up date is 10/22/17)
| 10/21/17
| Weekend and Short-Term Closures
|
Maple Road (Phase I)
| Haggerty Road to Halsted Road
| West Bloomfield Township
| Reconstruction including center turn lane, right turn lane extensions, drainage improvements, traffic-signal modernizations
| Yes, westbound lane is closed. Eastbound lane will remain open to traffic
| 14 Mile Road for westbound traffic
| Dan's Excavating
| 7/24/17
| Late November (Phase 2 from Halsted to Drake will begin Spring 2018)
| Maple Road (Haggerty to Drake)
|
Napier Road/10 Mile Road
| Intersection of Napier/10 Mile Road; including 10 Mile Road east and west of Napier Road (PHASE I)
| Lyon Township and City of Novi
| Reconstruction of intersection to a roundabout is complete
| No
| No
| Dan's Excavating
| 7/17/17
| Intersection is open (continued work on pedestrian crossings and DTE street lighting through December)
| Napier/10 Mile Road
|
Orchard Lake Road
| North of Northwestern Hwy. to just south of Maple Road
| West Bloomfield Township
| Reconstruction of road to a 4-lane boulevard, elimination of service drive east of Orchard Lake Rd, construction of pedestrian paths, ADA compliant crosswalks, improved drainage
| No, one lane open in each direction with a center left-turn lane (Powers Rd intersection is closed for realignment from 10/2/17 through late October)
| No
| Dan's Excavating
| 6/12/17
| Late November
| Orchard Lake Road Construction
|
Powers Road (part of the Orchard Lake Road project)
| At Orchard Lake Road
| West Bloomfield Township
| Intersection realignment
| Yes, Powers Road is closed at Orchard Lake Road
| Daly Rd to Maple Rd to Orchard Lake Rd and vice versa
| Dan's Excavating
| 10/2/17
| Late October
| Orchard Lake Road Construction
|
Ramsey Road
| West of Seymour Lake Road
| Brandon Township
| Culvert replacement
| Yes
| Seymour Lake Rd to Sashabaw Rd, back to Ramsey Rd and vice versa
| RCOC Hwy Maintenance
| 10/23/17
| 10/23/17
| Weekend & Short-Term Closures
|
Sashabaw Road (PERMIT PROJECT)
| Dixie Hwy and Walton Blvd
| Waterford Township
| Gas main and service line replacements
| No. Intermittent lane closures for the work will continue throughout the project
| No
| Consumers Energy
| 10/4/17
| Late November
| Consumers Energy
|
Snell Road
| East of Rochester Road near the Oakland & Macomb border
| Oakland and Washington townships
| Culvert replacement
| Yes
| Sheldon Rd to Gunn Rd to Mt. Vernon Rd, back to Snell Rd and vice versa
| Toebe Construction
| 10/16/17
| 11/7/17
| Snell Road
|
South Blvd./ Livernois Road intersection
| South Blvd./ Livernois Road
| Rochester Hills and Troy border
| Intersection safety improvement project includes widening, new traffic signal, ADA-compliant crosswalks and resurfacing
| No
| No
| Florence Cement
| 5/8/17
| COMPLETE
| South Boulevard
|