*Cooley Lake Road (PERMIT PROJECT)
| Burns Road and Duck Lake Road
| Highland Township
| Utility cut for gas pipeline
| Yes
| Duck Lake Rd to Commerce Rd to Burns Rd, back to Cooley Lake Rd and vice versa
| Welded Construction
| 8/24/17
| 8/25/17
| Traffic Alert
|
10 Mile Road (PERMIT PROJECT)
| At Pierce Road (west of Greenfield Road)
| Southfield
| Water main, sanitary/storm sewer and pavement repairs (City of Southfield project)
| Yes
| Southfield Rd to Mt. Vernon Rd to Greenfield Rd back to 10 Mile and vice versa
| Pamar Enterprises
| 6/16/17
| 9/11/17
| City of Southfield Engineering Dept.
|
12 Mile Road
| Haggerty Road and Farmington Road
| Farmington Hills
| Concrete slab replacement
| 12 Mile will have one lane open in each direction. South portion of Drake 12/Mile Road intersection will close (date TBA)
| Yes, for closure at Drake /12 Mile south portion of intersection is Drake to 11 Mile to Halsted back to 12 Mile and vice versa
| Florence Cement
| 8/14/17
| Mid November
| 12 Mile Road (Haggerty to Farmington)
|
12 Mile Road (BRIDGES)
| Between Telegraph and Lahser roads
| Southfield
| Concrete repairs and partial painting
| Intermittent lane restrictions in effect.
| No
| CA Hull
| 6/19/17
| Late August
| 12 Mile Bridges/Southfield
|
Baldwin Road
| Morgan Road to Waldon Road (2017-2019)
| Orion Township
| Reconstruction of Baldwin Road including: 5 roundabouts, widening, Americans with Disabilities Act (ADA) compliant crosswalks, improved lighting, pedestrian paths, concrete curb and gutter
| No; temporary closures pending for water main and tree removal work
| No
| Dan's Excavating
| 7/18/17 (water main relocation and building demolition) Project will resume in the Spring of 2018 & 2019
| Carryover project through 2019
| Baldwin Road
|
Gregory Road (part of the Baldwin Road project)
| At Baldwin Road
| Orion Township
| Water main replacement
| Yes
| Morgan Rd to Rohr Rd, back to Gregory Rd and vice versa
| Dan's Excavating
| 9/14/17
| 10/5/17
| Baldwin Road
|
Morgan Road (part of the Baldwin Road project)
| At Baldwin Road
| Orion Township
| Water main replacement
| Yes
| Gregory Rd to Rohr Rd, back to Morgan Rd and vice versa
| Dan's Excavating
| 8/21/17
| 9/14/17
| Baldwin Road
|
Brown Road
| Joslyn Road to M-24 (Lapeer Road)
| Orion Township and Auburn Hills border
| Concrete slab replacement
| No
| No
| Cipparrone Contracting Inc.
| 8/24/17
| 9/18/17
| Concrete Slab Replacement
|
Brown Road (PERMIT PROJECT)
| Joslyn Road to Baldwin Road
| Orion Township and Auburn Hills
| Widening from current configuration to five-lanes (Orion Township project)
| No, traffic will be maintained in both directions with continuous center left-turn lane
| No
| Pamar (per Orion Township)
| 7/18/17
| Late Fall
| Brown Road
|
Cass Lake Road
| Orchard Lake Road and Otter Avenue
| Keego Harbor
| Concrete slab replacement
| No; however, traffic can expect narrow lanes in work zones (truck traffic should seek alternate route)
| No
| Cipparrone Contracting Inc.
| 8/14/17
| Early September
| Concrete Slab Replacement
|
Dequindre Road (2-year project)
| Burningbush Drive to Long Lake Road
| Troy and Sterling Heights border
| Widening to 5 lanes with center left-turn lane, traffic signal upgrades, improved drainage, Americans with Disabilities Act (ADA) compliant crosswalks
| No, one lane will remain open each direction
| No
| TBA
| TBA
| TBA
| Dequindre Road
|
Greenfield Road
| 9 Mile Road and 10 Mile Road
| Southfield
| Concrete slab replacement
| No
| No
| Cipparrone Contracting Inc.
| 9/7/17
| 10/10/17
| Concrete Slab Replacement
|
Haggerty Road
| Haggerty Road/10 Mile intersection
| Novi and Farmington Hills
| Concrete slab replacement
| No (lane closures throughout project)
| No
| Cipparrone Contracting Inc.
| 7/24/17
| 8/28/17
| Concrete Slab Replacement
|
Lahser Road
| 11 Mile Road to Civic Center Drive
| City of Southfield
| Reconstruction (from Northwestern Hwy to Civic Center) and concrete patching (from 11 Mile to Northwestern Hwy)
| Yes, Northwestern Hwy to Civic Center Drive (additional closures forthcoming)
| Northwestern Hwy service drive to Civic Center Dr., back to Lahser and vice versa
| Florence Cement
| 7/26/17
| Mid September
| Lahser Road
|
Maple Road (Phase I)
| Haggerty Road to Halsted Road
| West Bloomfield Township
| Reconstruction including center turn lane, right turn lane extensions, drainage improvements, traffic-signal modernizations
| Yes, westbound lane is closed. Eastbound lane will remain open to traffic
| 14 Mile Road for westbound traffic
| Dan's Excavating
| 7/24/17
| Mid November (Phase 2 from Halsted to Drake will begin Spring 2018)
| Maple Road (Haggerty to Drake)
|
Middlebelt Road (BRIDGE OVER ROUGE RIVER)
| Between 8 Mile Road and Grand River
| Farmington Hills
| Preventative maintenance including concrete replacement, deck repairs/sealing and repaving approaches and bridge with asphalt
| No, lane restrictions throughout project
| No
| Z Contractors
| 8/7/17
| Mid September
| Middlebelt Bridge Over Rouge River
|
Napier Road/10 Mile Road
| Intersection of Napier/10 Mile Road; including 10 Mile Road east and west of Napier Road (PHASE I)
| Lyon Township and City of Novi
| Reconstruction of intersection to a roundabout, hill cut on 10 Mile Road west of Napier and reconstruction of 10 Mile from Copperwood to Nepavine Dr.
| Yes, closed from Copperwood to Nepavine on 10 Mile Road, including intersection
| Griswold Rd to 8 Mile Rd to Beck Rd, back to 10 Mile Road and vice versa
| Dan's Excavating
| 7/17/17
| Mid-October (road to fully reopen; continued work through mid-November)
| Napier/10 Mile Road
|
Orchard Lake Road
| North of Northwestern Hwy. to just south of Maple Road
| West Bloomfield Township
| Reconstruction of road to a 4-lane boulevard, elimination of service drive east of Orchard Lake Rd, construction of pedestrian paths, ADA compliant crosswalks, improved drainage
| No, one lane open in each direction with a center left-turn lane (Powers Rd intersection will close for realignment at a date TBA)
| No
| Dan's Excavating
| 6/12/17
| Late October
| Orchard Lake Road Construction
|
Sashabaw Road
| Maybee Road to Waldon Road
| Independence Township
| Concrete slab replacement
| No
| No
| Cipparrone Contracting Inc.
| 7/27/17
| 8/30/17
| Concrete Slab Replacement
|
South Blvd. (PAVING)
| East of John R to west of Dequindre
| Rochester Hills and Troy border
| Resurfacing
| No, under flag control
| No
| Cadillac Asphalt
| 6/20/17
| Mainline paving complete; striping and restoration work ongoing
| South Boulevard
|
South Blvd./ Livernois Road intersection
| South Blvd./ Livernois Road
| Rochester Hills and Troy border
| Intersection safety improvement project includes widening, new traffic signal, ADA-compliant crosswalks and resurfacing
| No, intersection is open to traffic with lane restrictions. Traffic signal is moving one approach at a time for duration of project
| No
| Florence Cement
| 5/8/17
| Mid September
| South Boulevard
|
Stadium Drive (PERMIT PROJECT)
| East of Lapeer Road (M-24)
| Orion Township
| Remove and replace a section of Stadium Drive
| Yes
| Lapeer Rd to Scripps Rd to Bald Mountain Rd, back to Stadium Dr & vice versa
| OHM Advisors
| 8/7/17
| Late August
| Orion Township
|
Traymore Drive (PERMIT PROJECT)
| South of Highland Avenue
| Bloomfield Township
| Storm drain construction and paving
| Yes
| Highland Ave to Winthrop Rd to Hillsdale Rd to Marlborough Dr, back to Traymore Dr and vice versa
| ADJ Excavating (per the Office of the Oakland County Water Resources Commissioner)
| 7/12/17
| Late August
| OCWRC
|
Walnut Lake Road
| West of Orchard Lake Road
| West Bloomfield Township
| Culvert replacement; work is weather-dependent
| Yes
| Orchard Lake Rd to Maple Rd to Farmington Rd, back to Walnut Lake Rd and vice versa
| Commerce Construction
| TBA
| TBA
| RCOC Weekend Road Closures
|