*Quarton Road (PERMIT PROJECT)
| Lahser Road to Woodward Avenue (M-1)
| Bloomfield Township and Bloomfield City border
| Water and sewer infrastructure work
| Yes
| Lahser Rd to Long Lake Rd to Woodward Ave, back to Quarton Rd and vice versa
| Ric-Man Construction (per Oakland County Office of the Water Resources Commissioner)
| 7/10/17
| 7/21/17
| OCWRC
|
*Shady Oaks Road (PERMIT PROJECT)
| North of Heights Road
| Orion Township
| Consumers Energy gas service facilitation
| Yes
| Dollar Bay Dr to Pine Tree Rd to Heights Rd, back to Shady Oaks Rd and vice versa
| Give'em a Brake
| 7/7/17 (morning)
| 7/7/17 (evening)
| Consumers Energy
|
*Stadium Drive (PERMIT PROJECT)
| East of Lapeer Road (M-24)
| Orion Township
| Remove and replace a section of Stadium Drive
| Yes
| Lapeer Rd to Scripps Rd to Bald Mountain Rd, back to Stadium Dr and vice versa
| OHM Advisors
| 7/17/17
| 9/5/17
| Orion Township
|
*Traymore Drive (PERMIT PROJECT)
| South of Highland Avenue
| Bloomfield Township
| Storm drain construction and paving
| Yes
| Highland Ave to Winthrop Rd to Hillsdale Rd to Marlborough Dr, back to Traymore Dr and vice versa
| ADJ Excavating (per the Office of the Oakland County Water Resources Commissioner)
| 7/12/17
| Mid-August
| OCWRC
|
10 Mile Road (PERMIT PROJECT)
| At Pierce Road (west of Greenfield Road)
| Southfield
| Water main, sanitary/storm sewer and pavement repairs (City of Southfield project)
| Yes
| Southfield Rd to Mt. Vernon Rd to Greenfield Rd back to 10 Mile and vice versa
| Pamar Enterprises
| 6/16/17
| 8/31/17
| City of Southfield Engineering Dept.
|
12 Mile Road (BRIDGES)
| Between Telegraph and Lahser roads
| Southfield
| Concrete repairs and partial painting
| No. Lane restrictions in effect.
| No
| CA Hull
| 6/19/17
| Mid-August
| 12 Mile Bridges/Southfield
|
Baldwin Road
| Indianwood Road to Seymour Lake Road (southern intersection)
| Brandon Twp./Oxford Twp. and Independence Twp./Orion Twp. borders
| Milling and resurfacing
| No, under flag control
| No
| Ajax
| 6/27/17
| TBA
| Preservation Overlays
|
Baldwin Road
| Seymour Lake Road to Oakwood Road
| Brandon and Oxford townships
| Milling and resurfacing road
| No, flaggers will direct traffic
| No
| Ace-Saginaw Paving Company
| 6/7/17
| COMPLETE
| Preservation Overlays
|
Brown Road (PERMIT PROJECT)
| Joslyn Road to Baldwin Road
| Orion Township and Auburn Hills
| Widening from current configuration to five-lanes (Orion Township project)
| No, traffic will be maintained in both directions with continuous center left-turn lane
| No
| Orion Township and OHM Advisors
| TBA (July)
| TBA
| Brown Road
|
Crooks Road (PERMIT PROJECT)
| Square Lake Road to south of Long Lake Road
| Troy
| Concrete slab replacement on turn-arounds and travel lanes (City of Troy project)
| No
| No
| DiLisio
| 6/1/17
| SUBSTANTIALLY COMPLETE
| City of Troy Public Works
|
Lahser Road
| 11 Mile Road to Civic Center Drive
| City of Southfield
| Reconstruction (from Northwestern Hwy to Civic Center) and concrete patching (from 11 Mile to Northwestern Hwy)
| Yes, Northwestern Hwy to Civic Center Drive (additional closures forthcoming)
| Northwestern Hwy service drive to Civic Center Dr., back to Lahser and vice versa
| TBA
| July, TBA
| TBA
| Lahser Road
|
Lakeville Road
| Rochester Road to Glaspie Road
| Village of Oxford, Oxford and Addison townships
| Milling, resurfacing and some guardrail replacement
| No
| No
| Ace-Saginaw Paving Company
| 5/15/17
| COMPLETE
| Preservation Overlays
|
Maple Road
| Farmington Road to Orchard Lake Road
| West Bloomfield Township
| Reconstruction including center turn lane, right turn lane extensions, drainage improvements, traffic-signal modernizations
| Yes, eastbound lane is closed; westbound lane remains open
| Drake Rd to Walnut Lake Rd to Orchard Lake Rd and vice versa
| Dan's Excavating
| 4/3/2017
| Mid-July
| Maple Road Project
|
Napier Road/10 Mile Road
| Intersection of Napier/10 Mile Road; including 10 Mile Road east and west of Napier Road (PHASE I)
| Lyon Township and City of Novi
| Reconstruction of intersection to a roundabout, hill cut on 10 Mile Road west of Napier and reconstruction of 10 Mile from Copperwood to Nepavine Dr.
| Yes, closed from Copperwood to Nepavine on 10 Mile Road; including intersection
| Griswold Rd to 8 Mile Rd to Beck Rd, back to 10 Mile Road and vice versa
| Dan's Excavating
| 7/17/17 (Road closure on 7/17/17)
| Mid-October (road to fully reopen; continued work through mid-November)
| Napier/10 Mile Road
|
North Holly Road
| North of Evans Road
| Holly Township
| Installation of a storm sewer on east side of road
| No, flaggers directing traffic
| No
| RCOC Hwy Maintenance
| 6/26/17
| COMPLETE
| North Holly Road Storm Sewer
|
Oakwood Road
| Leece Road to M-24
| Brandon and Oxford townships
| Milling various sections and resurfacing entire 6.6 mile stretch of road
| No, under flag control
| No
| Ace-Saginaw Paving Company
| 6/15/17
| Mid-July
| Preservation Overlays
|
Orchard Lake Road
| North of Northwestern Hwy. to just south of Maple Road
| West Bloomfield Township
| Reconstruction of road to a 4-lane boulevard, elimination of service drive east of Orchard Lake Rd, construction of pedestrian paths, ADA compliant crosswalks, improved drainage
| No, one lane open in each direction with a center left-turn lane (Powers Rd intersection will close for realignment at a date TBA)
| No
| Dan's Excavating
| 6/12/17
| Late October
| Orchard Lake Road Construction
|
Quarton Road
| Franklin Road to Telegraph
| Bloomfield Township
| Milling and resurfacing
| No
| No
| Ajax
| 6/27/17
| Mainline paving complete
| Preservation Overlays
|
South Blvd. (PAVING)
| East of Crooks Road to west of Livernois; East of John R to west of Dequindre
| Rochester Hills and Troy border
| Resurfacing
| No, under flag control
| No
| Cadillac Asphalt
| 6/20/17
| Late-August
| South Boulevard
|
South Blvd./ Livernois Road intersection
| South Blvd./ Livernois Road
| Rochester Hills and Troy border
| Intersection safety improvement project includes widening, new traffic signal, ADA-compliant crosswalks and resurfacing
| No, intersection is open to traffic with lane restrictions. Traffic signal is moving one approach at a time for duration of project
| No
| Florence Cement
| 5/8/17
| Mid-September
| South Boulevard
|
Williams Lake Road
| Elizabeth Lake Road to Pontiac Lake Road
| Waterford Township
| Micro-milling, chip and seal and complete with an asphalt overlay
| No
| No
| Cadillac Asphalt
| 5/15/17
| COMPLETE
| Preservation Overlays
|
Wyoming Avenue
| 8 Mile Road to Northend Avenue
| Royal Oak Township
| Milling and resurfacing
| No
| No
| Ajax
| TBA
| TBA
| Preservation Overlays
|