[ARCHIVED] RCOC WEEKLY ROAD CONSTRUCTION AND PERMIT PROJECTS UPDATE (JUNE 28-JULY 5)

Work Zone

      The following projects may cause traffic delays on Road Commission for Oakland County (RCOC) roads between June 28 and July 5 or may start shortly thereafter.

It is RCOC’s goal to conduct road improvement projects in a way that interferes with traffic as little as possible. This list includes both Road Commission projects and projects conducted by others, under permit, on roads under the jurisdiction of the Road Commission.

     Please note: This information is subject to change. Projects can change from day to day, and traffic delays can develop in a matter of minutes due to weather, emergency situations, etc.

     RCOC road construction projects will also be suspended at 3 p.m. Friday, June 30, for the Independence Day holiday weekend.   Roads that are currently closed or partially for construction, such as Maple Road between Orchard Lake Road and Farmington Road (closed to eastbound traffic), will remain closed to traffic.  Work will resume after 6 a.m. on Wednesday, July 5.

     The project list is  also attached.           

           

2017 Road Commission for Oakland County Road Construction and Permit Projects (6/28/17 Update)

Road

Project Limits

Community or Communities

Project Description

Road Closure

Detour

Prime Contractor

Project Start

Anticipated Completion

Project Website

*Baldwin Road
Indianwood Road to Seymour Lake Road (southern intersection)
Brandon Twp./Oxford Twp. and Independence Twp./Orion Twp. borders
Milling and resurfacing
No, under flag control
No
Ajax
6/27/17
TBA
Preservation Overlays
*Lahser Road
11 Mile Road to Civic Center Drive
City of Southfield
Reconstruction (from Northwestern Hwy to Civic Center) and concrete patching (from 11 Mile to Northwestern Hwy)
Yes, Northwestern Hwy to Civic Center Drive (additional closures forthcoming)
Northwestern Hwy service drive to Civic Center Dr., back to Lahser and vice versa
TBA
July, TBA
TBA
Lahser Road
*Napier Road/10 Mile Road
Intersection of Napier/10 Mile Road; including 10 Mile Road east and west of Napier Road (PHASE I)
Lyon Township and City of Novi
Reconstruction of intersection to a roundabout, hill cut on 10 Mile Road west of Napier and reconstruction of 10 Mile from Copperwood to Nepavine Dr.
Yes, closed from Copperwood to Nepavine on 10 Mile Road; including intersection
Griswold Rd to 8 Mile Rd to Beck Rd, back to 10 Mile Road and vice versa
Dan’s Excavating
July, TBA
TBA
Napier/10 Mile Road
10 Mile Road (PERMIT PROJECT)
At Pierce Road (west of Greenfield Road)
Southfield
Water main, sanitary/storm sewer and pavement repairs (City of Southfield project)
Yes
Southfield Rd to Mt. Vernon Rd to Greenfield Rd back to 10 Mile and vice versa
Pamar Enterprises
6/16/17
8/31/17
City of Southfield Engineering Dept.
12 Mile Road (BRIDGES)
Between Telegraph and Lahser roads
Southfield
Concrete repairs and partial painting
No. Lane restrictions in effect.
No
CA Hull
6/19/17
Mid-August
12 Mile Bridges/Southfield
Baldwin Road
Seymour Lake Road to Oakwood Road
Brandon and Oxford townships
Milling and resurfacing road
No, flaggers will direct traffic
No
Ace-Saginaw Paving Company
6/7/17
Mainline paving complete (shoulder work continues)
Preservation Overlays
Brown Road (PERMIT PROJECT)
Joslyn Road to Baldwin Road
Orion Township and Auburn Hills
Widening from current configuration to five-lanes (Orion Township project)
No, traffic will be maintained in both directions with continuous center left-turn lane
No
Orion Township and OHM Advisors
TBA (July)
TBA
Brown Road
Crooks Road (PERMIT PROJECT)
Square Lake Road to south of Long Lake Road
Troy
Concrete slab replacement on turn-arounds and travel lanes (City of Troy project)
No
No
DiLisio
6/1/17
Late-June
City of Troy Public Works
Lakeville Road
Rochester Road to Glaspie Road
Village of Oxford, Oxford and Addison townships
Milling, resurfacing and some guardrail replacement
No
No
Ace-Saginaw Paving Company
5/15/17
Mainline paving complete (shoulder work continues)
Preservation Overlays
Maple Road
Farmington Road to Orchard Lake Road
West Bloomfield Township
Reconstruction including center turn lane, right turn lane extensions, drainage improvements, traffic-signal modernizations.
Yes, eastbound lane is closed; westbound lane remains open
Drake Rd to Walnut Lake Rd to Orchard Lake Rd and vice versa
Dan’s Excavating
4/3/2017
Mid-July
Maple Road Project
North Holly Road
North of Evans Road
Holly Township
Installation of a storm sewer on east side of road
No, flaggers directing traffic
No
RCOC Hwy Maintenance
6/26/17
6/30/17
North Holly Road Storm Sewer
Oakwood Road
Leece Road to M-24
Brandon and Oxford townships
Milling various sections and resurfacing entire 6.6 mile stretch of road
No, under flag control
No
Ace-Saginaw Paving Company
6/15/17
July (TBA)
Preservation Overlays
Orchard Lake Road
North of Northwestern Hwy. to just south of Maple Road
West Bloomfield Township
Reconstruction of road to a 4-lane boulevard, elimination of service drive east of Orchard Lake Rd, construction of pedestrian paths, ADA compliant crosswalks, improved drainage
No, one lane open in each direction with a center left-turn lane (Powers Rd intersection will close for realignment at a date TBA)
No
Dan’s Excavating
6/12/17
Late October
Orchard Lake Road Construction
*Quarton Road
Franklin Road to Telegraph
Bloomfield Township
Milling and resurfacing
No
No
Ajax
6/27/17
TBA
Preservation Overlays
*South Blvd. (PAVING)
East of Crooks Road to west of Livernois; East of John R to west of Dequindre
Rochester Hills and Troy border
Resurfacing
No, under flag control
No
Cadillac Asphalt
6/20/17
Late-August (mainline paving from John R to Dequindre is complete)
South Boulevard
South Blvd./ Livernois Road intersection
South Blvd./ Livernois Road
Rochester Hills and Troy border
Intersection safety improvement project includes widening, new traffic signal, ADA-compliant crosswalks and resurfacing
No, intersection is open to traffic with lane restrictions. Traffic signal is moving one approach at a time for duration of project
No
Florence Cement
5/8/17
Mid-September
South Boulevard
Traymore Drive (PERMIT PROJECT)
South of Highland Avenue
Bloomfield Township
Storm drain construction and paving
Yes
Highland Ave to Winthrop Rd to Hillsdale Rd to Marlborough Dr, back to Traymore Dr and vice versa
ADJ Excavating per the Office of the Oakland County Water Resources Commissioner
7/2/17
8/28/17
OCWRC
Williams Lake Road
Elizabeth Lake Road to Pontiac Lake Road
Waterford Township
Micro-milling, chip and seal and complete with an asphalt overlay
No
No
Cadillac Asphalt
5/15/17
Mainline paving complete (sign work continues)
Preservation Overlays
*Wyoming Avenue
8 Mile Road to Northend Avenue
Royal Oak Township
Milling and resurfacing
No
No
Ajax
TBA
TBA
Preservation Overlays

   (*indicates new or updated project; TBA=To Be Announced)   

6/28 Construction and Permits Update