*10 Mile Road (PERMIT PROJECT)
| At Pierce Road (west of Greenfield Road)
| Southfield
| Water main, sanitary/storm sewer and pavement repairs (City of Southfield project)
| Yes
| Southfield Rd to Mt. Vernon Rd to Greenfield Rd back to 10 Mile and vice versa
| Pamar Enterprises
| 6/16/17
| 8/31/17
| City of Southfield Engineering Dept.
|
*12 Mile Bridges
| Between Telegraph and Lahser Roads
| Southfield
| Concrete repairs and partial painting
| No. There will be lane restrictions
| No
| CA Hull
| 6/19/17
| Mid-August
| 12 Mile Bridges/Southfield
|
*North Holly Road
| North of Evans Road
| Holly Township
| Installation of a storm sewer on east side of road
| No, flaggers directing traffic
| No
| RCOC Hwy Maintenance
| 6/26/17
| 6/30/17
| North Holly Road Storm Sewer
|
Baldwin Road
| Seymour Lake Road to Oakwood Road
| Brandon and Oxford townships
| Milling and resurfacing road
| No, flaggers directing traffic
| No
| Ace-Saginaw Paving Company
| 6/7/17
| June (TBA)
| Preservation Overlays
|
Brown Road (PERMIT PROJECT)
| Joslyn Road to Baldwin Road
| Orion Township and Auburn Hills
| Widening from current configuration to five-lanes (Orion Township project)
| No, traffic will be maintained in both directions with continuous center left-turn lane
| No
| Orion Township and OHM Advisors
| TBA (July)
| TBA
| Brown Road
|
Crooks Road (PERMIT PROJECT)
| Square Lake Road to south of Long Lake Road
| Troy
| Concrete slab replacement on turn-arounds and travel lanes (City of Troy project)
| No
| No
| DiLisio
| Early June
| Late June
| City of Troy Public Works
|
Glanworth Road (PERMIT PROJECT)
| East of M-24 (Lapeer Road)
| Orion Township
| Glanworth Road is closed at M-24 for installation of underground utilities for Kroger
| Yes (residential road)
| Residents to use Summer Road
| Oscar W. Larson Company
| 6/12/17
| 6/23/17
| Oscar W. Larson
|
Lakeville Road
| Rochester Road to Glaspie Road
| Village of Oxford, Oxford and Addison townships
| Milling, resurfacing and some guardrail replacement
| No, flaggers will direct traffic
| No
| Ace-Saginaw Paving Company
| 5/15/17
| Mid-June (shoulder work in progress)
| Preservation Overlays
|
Maple Road
| Farmington Road to Orchard Lake Road
| West Bloomfield Township
| Reconstruction including center turn lane, right turn lane extensions, drainage improvements, traffic-signal modernizations.
| Yes, eastbound lane is closed; westbound lane remains open
| Drake Rd to Walnut Lake Rd to Orchard Lake Rd and vice versa
| Dan’s Excavating
| 4/3/17
| July (TBA)
| Maple Road Project
|
Oakwood Road
| Leece Road to M-24
| Brandon and Oxford townships
| Milling various sections and resurfacing entire 6.6 mile stretch of road
| No, flaggers will be directing traffic.
| No
| Ace-Saginaw Paving Company
| 6/15/17
| July (TBA)
| Preservation Overlays
|
Orchard Lake Road
| North of Northwestern Hwy. to just south of Maple Road
| West Bloomfield Township
| Reconstruction of road to a 4-lane boulevard, elimination of service drive east of Orchard Lake Rd, construction of pedestrian paths, ADA compliant crosswalks, improved drainage
| No, one lane open in each direction with a center left-turn lane (Powers Rd intersection will close for realignment at a date TBA)
| No
| Dan’s Excavating
| 6/12/17
| Late October
| Orchard Lake Road Construction
|
South Blvd. (PAVING)
| East of Crooks Road to west of Livernois; East of John R to west of Dequindre
| Rochester Hills and Troy
| Resurfacing
| No, flaggers to direct traffic
| No
| Cadillac Asphalt
| 6/15/17
| Late-August
| South Boulevard
|
South Blvd./ Livernois Road intersection
| South Blvd./ Livernois Road
| Rochester Hills and Troy border
| Intersection safety improvement project includes widening, new traffic signal, ADA compliant cross walks and resurfacing
| No, intersection is open to traffic. Traffic signal is moving one approach at a time for duration of project
| No
| Florence Cement
| 5/8/17
| Mid-September
| South Boulevard
|
Williams Lake Road
| Elizabeth Lake Road to Pontiac Lake Road
| Waterford Township
| Micro-milling, chip and seal and complete with an asphalt overlay
| No, flaggers directing traffic
| No
| Cadillac Asphalt
| 5/15/17
| End of June
| Preservation Overlays
|