*Andersonville Road
| North of Hall Road
| Springfield Township
| Culvert replacement
| Yes
| White Lake Rd to Dixie Hwy to Davisburg Rd, back to Andersonville Rd and vice versa
| RCOC Hwy Maintenance
| 5/20/17
| 5/20/17
| RCOC Weekend Closures
|
*Lakeville Road
| Rochester Road to Glaspie Road
| Village of Oxford, Oxford and Addison townships
| Milling, resurfacing and some guardrail replacement
| No, flaggers directing traffic
| No
| Ace-Saginaw Paving Company
| 5/15/17
| Early June
| Preservation Overlays
|
*Wattles Road
| East of Kensington Road
| Bloomfield Township
| Mill pavement patch over recently replaced culvert and replace with asphalt
| No, flaggers will be directing traffic
| No
| Allied Asphalt Paving
| 5/20/17
| 5/20/17
|
|
8 Mile Road (PERMIT PROEJCT)
| Chubb Road and Currie Road
| Lyon Township and Washtenaw County border
| Consumers Energy pipeline repair
| Yes
| Griswold Rd to 10 Mile Rd to Beck Rd, back to 8 Mile Rd and vice versa
| Consumers Energy
| 5/15/17
| 5/26/17
| Traffic Alert
|
9 Mile Road (PERMIT PROJECT)
| West of Griswold Road
| Lyon Township and South Lyon border
| Consumers Energy pipeline repair
| Yes
| Lafayette St/Pontiac Trl to 8 Mile Rd to Griswold Rd, back to 9 Mile Rd and vice versa
| Consumers Energy
| 5/15/17
| 5/26/17
| Traffic Alert
|
Clintonville Road
| Walton Road to Mann Road
| Waterford Township
| Preservation overlay
| No, road will remain open to traffic (motorists can expect delays)
| No
| Ajax
| 4/26/17
| PAVING COMPLETE (additional shoulder work scheduled for 5/18/17)
| Preservation Overlays
|
Crescent Lake Road
| M-59 to Hatchery Road
| Waterford Township
| Preservation overlay
| No
| No
| Ajax
| 5/8/17
| COMPLETE
| Preservation Overlays
|
Drake Road
| 14 Mile Road to Walnut Lake Road
| West Bloomfield Township
| Preservation overlay (some milling and simple resurfacing); work is weather, material and equipment-dependent
| No, road will remain open to traffic
| No
| Ajax
| 4/24017
| PAVING COMPLETE (additional shoulder work scheduled for 5/23/17)
| Preservation Overlays
|
Duck Lake Road
| Cooley Lake Road to M-59 (Highland Road)
| Highland Township
| Preservation overlay
| No
| No
| Ajax
| 4/26/17
| COMPLETE
| Preservation Overlays
|
Duck Lake Road
| Sleeth Road to Commerce Road
| Commerce Township and Milford Township border
| Preservation overlay (some milling and simple resurfacing); work is weather, material and equipment-dependent
| No, road will remain open to traffic (motorists can expect delays)
| No
| Ajax
| 4/28/17
| 5/13/17 (additional shoulder work scheduled for 5/17/17)
| Preservation Overlays
|
Dutton Road
| Adams Road to Squirrel Road
| Auburn Hills, Rochester Hills, Oakland and Orion Twps border
| Preservation overlay (some milling and simple resurfacing); work is weather, material and equipment-dependent
| No, road will remain open to traffic (motorists can expect delays)
| No
| Ajax
| 5/18/17
| 5/20/17
| Preservation Overlays
|
Franklin Road
| Lone Pine Road to Long Lake Road
| Bloomfield Township
| Preservation overlay (some milling and simple resurfacing); work is weather, material and equipment-dependent
| No, road will remain open to traffic (motorists can expect delays)
| No
| Ajax
| 5/9/17
| 5/12/17 (additional shoulder work scheduled for 5/19/17)
| Preservation Overlays
|
Frembes Road
| Hatchery Road to Walton Blvd.
| Waterford Township
| Preservation overlay
| No
| No
| Ajax
| 5/8/17
| COMPLETE
| Preservation Overlays
|
Halsted Road
| Walnut Lake Road to Pontiac Trail
| West Bloomfield Township
| Preservation overlay
| No
| No
| Ajax
| 4/25/17
| COMPLETE
| Preservation Overlays
|
Lahser Road
| Maple Road to Long Lake Road
| Bloomfield Township and Bloomfield Hills
| Preservation overlay (some milling and simple resurfacing); work is weather, material and equipment-dependent
| No, road will remain open to traffic (motorists can expect delays)
| No
| Ajax
| 5/16/17
| 5/19/17 (additional shoulder work scheduled for 5/22/17)
| Preservation Overlays
|
Lahser Road
| 12 Mile and 13 Mile roads
| Southfield and Beverly Hills
| Preservation overlay (some milling and simple resurfacing); work is weather, material and equipment-dependent
| No, road will remain open to traffic (motorists can expect delays)
| No
| Ajax
| 5/9/17
| COMPLETE (additional shoulder work scheduled for 5/17/17)
| Preservation Overlays
|
Lahser Road
| Hickory Grove Road to Square Lake Road
| Bloomfield Township
| Preservation overlay
| No
| No
| Ajax
| 5/9/17
| COMPLETE
| Preservation Overlays
|
Lochaven Road
| Elizabeth Lake Road to Cooley Lake Road (PAVED SECTIONS ONLY)
| Waterford Township
| Preservation overlay (some milling and simple resurfacing); work is weather, material and equipment-dependent (PAVED SECTIONS ONLY)
| No, road will remain open to traffic (motorists can expect delays)
| No
| Ajax
| 5/1/17
| PAVING COMPLETE (additional shoulder work scheduled for 5/23/17)
| Preservation Overlays
|
Maceday Lake Road
| Williams Lake Road to Nelsey Road
| Waterford Township
| Preservation overlay (some milling and simple resurfacing); work is weather, material and equipment-dependent
| No, road will remain open to traffic (motorists can expect delays)
| No
| Ajax
| 5/16/17
| 5/17/17 (additional shoulder work scheduled for 5/18/17)
| Preservation Overlays
|
Maple Road
| Farmington Road to Orchard Lake Road
| West Bloomfield Township
| Reconstruction including center turn lane, right turn lane extensions, drainage improvements, traffic-signal modernizations.
| Yes, eastbound lane is closed; westbound lane remains open
| Drake Rd to Walnut Lake Rd to Orchard Lake Rd and vice versa
| Dan’s Excavating
| 4/3/2017
| Late July
| Maple Road Project
|
Maybee Road
| Marvin Road to Clintonville Road
| Independence Township
| Preservation overlay (some milling and simple resurfacing); work is weather, material and equipment-dependent
| No, road will remain open to traffic (motorists can expect delays)
| No
| Ajax
| 4/24/2017
| PAVING COMPLETE (additional shoulder work scheduled for 5/17/17)
| Preservation Overlays
|
Orchard Lake Road
| North of Northwestern Hwy. to just south of Maple Road
| West Bloomfield Township
| Reconstruction of road to a 4-lane boulevard, elimination of service drive east of Orchard Lake Rd, pedestrian paths, ADA compliant crosswalks, improved drainage
| No, one lane open in each direction with a center left-turn lane (Powers Rd intersection will close for realignment at a date TBA)
| No
| Dan’s Excavating
| TBA (utility relocation work in progress)
| Late October
| Orchard Lake Road Construction
|
Silver Lake Road
| Dixie Hwy to Walton Blvd
| Waterford Township
| Preservation overlay
| No
| No
| Ajax
| 4/27/17
| COMPLETE
| Preservation Overlays
|
South Blvd./ Livernois Road intersection
| South Blvd./ Livernois Road
| Rochester Hills and Troy border
| Intersection safety improvement project includes widening, new traffic signal, ADA compliant cross walks and resurfacing
| No, intersection is open to traffic. Traffic signal is moving one approach at a time for duration of project.
| No
| Florence Cement
| 5/8/17
| Mid-September
| South Boulevard
|
Waldon Road
| Joslyn Road to Giddings Road
| Orion Township
| Preservation overlay (some milling and simple resurfacing); work is weather, material and equipment-dependent
| No, road will remain open to traffic (motorists can expect delays)
| No
| Ajax
| 5/10
| 5/24/17 (additional shoulder work scheduled for 5/25/17)
| Preservation Overlays
|
Williams Lake Road
| Elizabeth Lake Road to Pontiac Lake Road
| Waterford Township
| Micro-milling, chip and seal and complete with an asphalt overlay
| No, flaggers directing traffic
| No
| Cadillac Asphalt
| 5/15/17
| End of June
| Preservation Overlays
|