Big Beaver Road (PERMIT PROJECT) | Westbound Big Beaver Road, just west of I-75. | Troy | AT&T utility work. | The westbound left (inside) lane is closed just west of I-75. Traffic is shifted to the open lanes in the work zone. | No. | AT&T | 7/17 | Early September | Permit Work and Short-Term Road Closures |
Cooley Lake Road culvert replacement over the Huron River | Carroll Lake Road and Bogie Lake Road (the culvert is just west of Carroll Lake Road). | Commerce Township and White Lake Township | Replace culverts with pre-cast concrete bridge, asphalt paving in the vicinity of the new bridge, new guardrail, storm sewer/drainage improvements and new concrete curbs and gutters in the vicinity of the bridge. | The road is closed between Carroll Lake Rd and Oxbow Lake Rd. Residential access maintained east and west of the work. | Carroll Lake Rd to Wise Rd to Bogie Lake Rd, back to Cooley Lake Rd and vice versa. | Anlaan Construction | 7/10 | Late October | Cooley Lake Road Culvert Replacement |
*Dutton Road Bridge Replacement | Between the north and south legs of Livernois Road over Paint Creek. | Rochester Hills and Oakland Township | Bridge replacement over the Paint Creek. Work also includes asphalt paving in the vicinity of the bridge, shoulder paving on the north side of Dutton Rd to the Paint Creek Trail parking lot, and new curbs, gutters and guardrails. | Dutton Rd, between the north and south legs of Livernois Rd, is closed to traffic. | Dutton Rd to Brewster Rd to Tienken Rd to Orion Rd, back to Dutton Rd and vice versa. | Grand River Construction, Inc. | 7/26 | Early November | Dutton Road Bridge Replacement |
East Avon Road, Dequindre Road to 23 Mile Road (PERMIT PROJECT) | 23 Mile Road and Dequindre Road | Rochester Hills and Shelby Township | Great Lakes Water Authority (GLWA) water infrastructure improvements. The project includes reconstruction and widening of East Avon Rd and roundabout construction at 23 Mile and Dequindre Rd. | Yes. | Dequindre Rd to Hamlin Rd to Ryan Rd to Shelby Rd to 24 Mile Rd, back to Dequindre Rd and vice versa. | GLWA | 12/5/22 | Mid-August | Great Lakes Water Authority |
Elizabeth Lake Road/Oxbow Lake Road intersection (PHASE 2) | Elizabeth Lake Road/Oxbow Lake Road intersection and resurfacing work on Elizabeth Lake Road from Teggerdine Road to Oxbow Lake Road | White Lake Township | Single-lane roundabout construction with improved drainage, Americans with Disabilities Act-compliant crosswalks, sidewalks, asphalt paving at the roundabout, street lighting, resurfacing between the two roundabouts, curb and gutter installation. | Yes, the intersection is closed. | Elizabeth Lake Rd to Pontiac Lake Rd to Highland Rd (M-59) to Bogie Lake Rd to Cooley Lake Rd to Oxbow Lake Rd, back to Elizabeth Lake Rd and vice versa. | Fonson Company Inc. | 6/19 | Early September | Elizabeth Lake Road Roundabouts (White Lake Township) |
Fourteen Mile Road | Barrington Road to Dequindre Road | Madison Heights and Troy | Asphalt resurfacing, concrete repairs, minor drainage improvements, Americans with Disabilities Act-compliant crosswalks, traffic signal upgrades, and repairs to curbs and gutters. | No, expect lane closures. | No. | Florence Cement | 3/6 | Mid-August | Fourteen Mile Road, Barrington to Dequindre Road |
*Franklin Road | Just south of Telegraph Road (US 24) to north Acorn Drive. | Bloomfield Township | Concrete removal and replacement. | Franklin Rd, south of Telegraph Rd, will completely close. Business access maintained by using Hickory Grove Rd to Franklin Rd and vice versa. | Telegraph Rd (US 24) to Hickory Grove Rd, back to Franklin Rd and vice versa. | Cipparrone Contracting, Inc. | 8/4 | 8/18 | Concrete Repairs |
Grand River Avenue culvert replacement (over the Kent Lake Tributary) | From Kent Lake Road to Kensington Blvd. | Lyon Township | Removal and replacement of culvert under the road. Work includes paving in the vicinity of the culvert, new guardrail and drainage improvements. | Yes. The road will completely close for 21 days at the culvert. Business and residential access maintained east and west of the culvert work. | Kent Lake Rd to Silver Lake Rd/Pontiac Trl to New Hudson Dr, back to Grand River Ave and vice versa. | Springline Excavating LLC | 8/7 | Late August | Grand River Avenue Culvert Replacement over the Kent Lake Tributary |
Greenfield Road/ Normandy Road/ Beverly Road intersection | Greenfield Road/ Normandy Road/ Beverly Road intersection | Village of Beverly Hills and Royal Oak | Construction of a "compact" one-lane roundabout, reconstruction of .19 miles of Normandy and Greenfield roads, drainage improvements, new sidewalks, permanent closure of Beverly Court at Greenfield Road, new curbs and gutters. | Yes, the intersection is closed. | For detours, visit https://www.rcocweb.org/655/GreenfieldNormandy-Beverly-Roundabout. | DiPonio Contracting | 6/12 | Late August | Greenfield/Normandy/Beverly Roundabout |
Novi Road | Nine Mile Road to Ten Mile Road | Novi | Asphalt resurfacing, some widening, Americans with Disabilities Act-compliant crosswalks, culvert/sewer crossing replacements, drainage improvements, traffic signal upgrades, concrete replacement and left-turn lane extension south of 10 Mile Rd. | Yes, northbound Novi Rd is closed. Southbound Novi Rd is open to traffic for the project’s duration. | The detour for the northbound closure is Nine Mile Rd to Meadowbrook Rd to Ten Mile Rd, back to Novi Rd. Residential and business access maintained by using southbound Novi Rd. | Springline Excavating LLC | 3/20 | Late fall | Novi Road, Nine Mile to Ten Mile Road |
Oakwood Road/Hadley Road intersection | Oakwood Road/Hadley Road intersection | Brandon Township | Intersection safety improvements including extending some turn lanes on Oakwood Rd, replacement of a culvert under the road, widening Oakwood Rd shoulders, storm sewer/drainage improvements, new curbs and gutters. | The intersection is closed. | Oakwood Rd traffic detour is Baldwin Rd to Seymour Lake Rd to Ortonville Rd (M-15) back to Oakwood Rd and vice versa. Hadley Rd detour is Seymour Lake Rd to Ortonville Rd (M-15) to Hegel Rd, back to Hadley Rd and vice versa. | Zito Construction | 6/19 | Early September | Oakwood Road/Hadley Road intersection |
Orchard Lake Road | Middlebelt Road to south of Commerce Road | Keego Harbor, Orchard Lake Village, Sylvan Lake and West Bloomfield Township | Paving with asphalt, converting the road to three through lanes with a continuous center left- turn lane, some reconstruction, sidewalk upgrades, Americans with Disabilities Act-compliant crosswalks and traffic signal upgrades. | Yes, Commerce Rd at Orchard Lake Rd is closed. NB/EB Orchard Lake Rd, Commerce Rd to Rycroft St is closed (SB and WB Orchard Lake Rd remains open). | Commerce Rd detour is Hiller Rd to Cooley Lake Rd to Cass Elizabeth Rd to Cass Lake Rd, back to Orchard Lake Rd and vice versa. NB/EB Orchard Lake Rd detour is Long Lake Rd to Middlebelt Rd, back to Orchard Lake Rd. | Cadillac Asphalt | 7/10 | Mid-November | Orchard Lake Road, Commerce Road to Middlebelt Road |
Orchard Lake Road-Commerce Road to Rycroft Street (part of the Orchard Lake Road project, south of Commerce Road to Middlebelt Road) | Commerce Road to Rycroft Street | Orchard Lake Village and Keego Harbor | Reconstruction of the road and drainage improvements. | NB/EB Orchard Lake Rd is closed from Commerce Rd to Rycroft St. SB/WB Orchard Lake Rd remains open to traffic. | NB and EB traffic detour is Long Lake Rd to Middlebelt Rd, back to Orchard Lake Rd. | Cadillac Asphalt | 7/10 | Early September | Orchard Lake Road, Commerce Road to Middlebelt Road |
Commerce Road/Orchard Lake Road (part of the Orchard Lake Road construction, south of Commerce Road to Middlebelt Road) | Commerce Road at Orchard Lake Road. | Orchard Lake Village and Keego Harbor | Intersection reconstruction. | Yes, Commerce Rd at Orchard Lake Rd is closed until approximately mid-August. | Orchard Lake Rd/Commerce Rd detours: NB/EB Orchard Lake Rd is Long Lake Rd to Middlebelt Rd, back to Orchard Lake Rd. Commerce Rd detour is Hiller Rd to Cooley Lake Rd to Cass Elizabeth Rd to Cass Lake Rd, back Orchard Lake Rd and vice versa. | Cadillac Asphalt | 7/10 | Mid-August | Orchard Lake Road, Commerce Road to Middlebelt Road |
Orion Road/Stoney Creek Road/Conklin Road intersection | Orion Road/Stoney Creek Road/Conklin Road intersection. | Orion Township | Safety improvements that include roundabout construction at the Orion Rd/Stoney Creek Rd intersection, a "T" intersection at Conklin Rd/Orion Rd, asphalt paving, drainage improvements, ADA-compliant pedestrian crosswalks, and intersection lighting. | Yes, the intersection will fully close to traffic. | Adams Rd to Silverbell Rd to Lapeer Rd (M-24) to Flint St to Miller Rd, back to Orion Rd and vice versa. | Pro-Line Asphalt | 8/7 | Early November | Orion/Stoney Creek/Conklin Roundabout |
Powers Road/Daly Road (PERMIT CLOSURE) | Powers Road, Orchard Lake Road to Daly Road and Daly Road, Powers Road to Chimney Hill Drive. | West Bloomfield Township | Orchard Lake Fine Art Show | Yes. Powers Rd is closed between Orchard Lake Rd and Daly Rd. Daly Rd to close south of Powers Rd to Chimney Hill Dr. | Orchard Lake Rd to Maple Rd to Daly Rd to Chimney Hill Dr back to Daly Rd and vice versa. | Hot Works LLC | 7/28 | 7/30 | Orchard Lake Fine Art Show |
Preservation Overlays (Simple Resurfacing) | Various heavier traveled roads throughout Oakland County | Various | Simple resurfacing with placing 2-2.5 inches of asphalt on the road surface; work is weather-dependent. | No, expect traffic delays. At least one lane will remain open on each road during the work, with flaggers directing traffic. | No | Cadillac Asphalt and Ace-Saginaw Paving | 4/25 | Fall, TBA | Simple Resurfacing (Preservation Overlays) |
Spot Resurfacing | Various heavier traveled roads in Oakland County | Various | Milling (grinding) of pavement on smaller sections of roads and paving with asphalt. Paving work is weather-dependent | No, work is done with flaggers directing traffic | No | Florence Cement and Pro-Line Asphalt | 5/2 | TBA | Spot Resurfacing |
*Ten Mile Road (PHASE 2) | Haggerty Road to Meadowbrook Road | Novi | Resurfacing with asphalt, safety improvements (continuous center left-turn lane), Americans with Disabilities Act-compliant crosswalks, sidewalk on the south side of Ten Mile Rd, traffic signal upgrades, shoulder widening, curb and gutter repairs/replacement. | Yes, the road is closed to westbound traffic and remains open to eastbound traffic. Business and residential access maintained. | Westbound traffic detour is Haggerty Rd to Grand River Ave to Meadowbrook Rd, back to Ten Mile Rd. | Toebe Construction | 5/22 | Fall (the road is expected to reopen to two-way traffic approximately early September) | Ten Mile Road |
Twelve Mile Road (PERMIT PROJECT) | Dartmouth Road to Stephenson Hwy. | Madison Heights | MDOT is constructing a diverging diamond interchange in conjunction with I-75 construction, 8 Mile Rd (M-102) to north of 13 Mile Road. | Yes | 12 Mile Rd to John R Rd to 13 Mile Rd to Stephenson Hwy., back to 12 Mile Rd and vice versa. | MDOT | 2/24 | 8/31 | Modernize 75 |
Waldon Road (PHASE 1) | Baldwin Road to Clintonville Road | Independence Township and Orion Township | A two-year project that includes gravel road paving with asphalt, replacement of culverts, shared-use pathway along a section of Waldon Rd, paved road shoulders and stream improvement. A roundabout at Clintonville/Waldon Rd will be built in 2024. | Yes, the road is closed. Access to homes and businesses maintained. | Baldwin Rd to Maybee Rd to Clintonville Rd, back to Waldon Rd and vice versa. | Dan's Excavating | 6/19 | Mid-November (Phase 2 construction will start in early 2024, date TBA) | Waldon Road, Clintonville to Baldwin Road |
*Walton Blvd. | Clintonville Road to the Pontiac city limits | Waterford Township | Removal of pavement, paving with asphalt, some curb/gutter repairs, traffic signal upgrade at Walton/Silver Lake Rd intersection and Americans with Disabilities Act-compliant crosswalks. | Two-way traffic maintained on Walton Blvd throughout the project. Silver Lake Rd will close at Walton Blvd on July 31 through Aug. 21 | Silver Lake Rd closure at Walton Blvd. starting July 31 - Aug. 21. Detours are: EB Walton Blvd to Silver Lake Rd is Sashabaw Rd to Dixie Hwy to Silver Lake Rd. WB Walton Blvd to Silver Lake Rd is Telegraph Rd to Dixie Hwy to Silver Lake Rd. | Florence Cement | 6/6 | Mid-November | Walton Blvd., Clintonville Road to the Pontiac city limits |