East Avon Road (PERMIT PROJECT) | Avon Road to Dequindre Road | Rochester Hills and Shelby Township | Great Lakes Water Authority (GLWA) water infrastructure improvements. The project includes reconstruction and widening of East Avon Rd and roundabout construction at 23 Mile and Dequindre Rd. | Yes. | Dequindre Rd to Hamlin Rd to Ryan Rd to 23 Mile Rd, back to Dequindre Rd and vice versa. | GLWA | 12/5/22 | Mid-August | Great Lakes Water Authority |
*Dequindre Road and 23 Mile Road (PERMIT PROJECT) Part of the East Avon Road Project | 23 Mile Road and Dequindre Road | Rochester Hills and Shelby Township | Great Lakes Water Authority (GLWA) water infrastructure improvements. The project includes reconstruction and widening of East Avon Rd and roundabout construction at 23 Mile and Dequindre Rd | Yes. | Dequindre Rd to Hamlin Rd to Ryan Rd to Shelby Rd to 24 Mile Rd, back to Dequindre Rd and vice versa. | GLWA | 3/20/23 | Mid-August | Great Lakes Water Authority |
Elizabeth Lake Road/ Teggerdine Road intersection (PHASE 1) | Elizabeth Lake Road/ Teggerdine Road intersection | White Lake Township | Single-lane roundabout construction with improved drainage, Americans with Disabilities Act-compliant crosswalks, sidewalks, asphalt paving at roundabout, street lighting, installation of some curbs and gutters. | Yes, the intersection will close to traffic. | Elizabeth Lake Rd to Pontiac Lake Rd to Highland Rd (M-59) to Bogie Lake Rd to Cooley Lake Rd to Oxbow Lake Rd, back to Elizabeth Lake Rd and vice versa. | Fonson Company Inc. | 3/13 | Early June | Elizabeth Lake Road Roundabouts (White Lake Township) |
Elizabeth Lake Road/Oxbow Lake Road intersection (PHASE 2) | Elizabeth Lake Road/Oxbow Lake Road intersection and resurfacing work on Elizabeth Lake Road from Teggerdine Road to Oxbow Lake Road | White Lake Township | Single-lane roundabout construction with improved drainage, Americans with Disabilities Act-compliant crosswalks, sidewalks, asphalt paving at roundabout, street lighting, resurfacing between the two roundabouts, curb and gutter installation. | Yes, the intersection will close to traffic once roundabout construction is completed at Elizabeth Lake Rd/Teggerdine Rd intersection and after school is out. | Elizabeth Lake Rd to Pontiac Lake Rd to Highland Rd (M-59) to Bogie Lake Rd to Cooley Lake Rd to Oxbow Lake Rd, back to Elizabeth Lake Rd and vice versa. | Fonson Company Inc. | June, TBA (after completion of the current school year and the roundabout construction at Elizabeth Lake Rd/Teggerdine Rd) | Early September | Elizabeth Lake Road Roundabouts (White Lake Township) |
Fourteen Mile Road | Barrington Road to Dequindre Road | Madison Heights and Troy | Asphalt resurfacing, concrete repairs, minor drainage improvements, Americans with Disabilities Act-compliant crosswalks, traffic signal upgrades, repairs to curbs and gutters. | No, expect lane closures. | No. Access from 14 Mile Rd to Minnesota St. is closed for watermain replacement work. Business access maintained from Elliott Ave. | Florence Cement | 3/6 | Mid-August | Fourteen Mile Road, Barrington to Dequindre Road |
*Novi Road | Nine Mile Road to Ten Mile Road | Novi | Asphalt resurfacing, some widening, Americans with Disabilities Act-compliant crosswalks, culvert/sewer crossing replacements, drainage improvements, traffic signal upgrades, concrete replacement and left-turn lane extension south of 10 Mile Rd. | The road will remain open during concrete replacement at Novi/Ten Mile Rd intersection. The road will close for approximately 35 days for culvert replacements. Once complete, the road will only be open to southbound traffic for the project’s duration. | Yes, starting approximately April 24. Nine Mile Road to Meadowbrook Rd to Ten Mile Rd, back to Novi Rd and vice versa. Residential and business access maintained. | Springline Excavating LLC | 3/20 | Late fall | Novi Road, Nine Mile to Ten Mile Road |
Ten Mile Road (PHASE 1) | Haggerty Road to Meadowbrook Road (closure is just west of Bethany Way to just west of Nilan Drive) | Novi | Remove and replace culverts under the road. Starting Jan. 5, the Ingersol Creek culvert located just west of Nilan Drive will be replaced. Once complete, Bishop Creek culvert, just west of Bethany Way, will be removed and replaced. | Yes. Residential and business access maintained east and west of the culverts. | Novi Rd to Grand River Ave to Haggerty Rd, back to Ten Mile Rd and vice versa. | Toebe Construction | 1/5 | 4/17 (approximate) The Ten Mile Road resurfacing project, Meadowbrook to Haggerty Road, will continue in the spring through fall. | Ten Mile Road |
Ten Mile Road (PHASE 2) | Haggerty Road to Meadowbrook Road | Novi | Resurfacing with asphalt, safety improvements (continuous center left-turn lane), Americans with Disabilities Act-compliant crosswalks, sidewalk on the south side of Ten Mile Rd, traffic signal upgrades, shoulder widening, curb and gutter repairs/replacement. | Yes, the road will close to westbound traffic and remain open to eastbound traffic. Business and residential access maintained. | Westbound traffic detour is Novi Rd to Grand River Ave to Haggerty Rd, back to Ten Mile Rd. | Toebe Construction | 4/17 (approximate) | Fall | Ten Mile Road |
*Waldon Road (PERMIT PROJECT) | Baldwin Road to Clintonville Road | Independence Township and Orion Township | Utility relocation is being done before gravel road paving and roundabout construction at Waldon Road and Clintonville Road. | No, expect periodic lane closures with flaggers directing traffic. | No | Various utilities | 3/6 | TBA | Waldon Road, Clintonville to Baldwin Road |