*14 Mile Road (PERMIT PROJECT) | Eastbound 14 Mile Road, just east of I-75 from Concord Street to John R Road | Madison Heights and Troy | Consumers Energy gas main relocation. | EB 14 Mile Rd is closed between Concord St. and John R Rd. WB 14 Mile Rd remains open to traffic. Business access maintained off of Mandoline Ave. The EB 14 Mile crossover to Elliott St/Oakland Mall remains accessible. | EB 14 Mile Rd detour is Stephenson Hwy to 12 Mile Rd to John R Rd, back to 14 Mile Rd. | Consumers Energy | 11/17 | 12/9 | Consumers Energy |
*14 Mile Road (PERMIT PROJECT) | Just west of the Novi Road/Decker Road intersection to M-5. | Novi and Walled Lake | Great Lakes Water Authority pavement repairs from earlier watermain work. | No. Expect lane shifts. | No. | Great Lakes Water Authority | 10/3 | Mid-December | Great Lakes Water Authority |
*East Avon Road (PERMIT PROJECT) | Avon Road to Dequindre Road | Rochester Hills and Shelby Township | Great Lakes Water Authority (GLWA) water infrastructure improvements. The project includes reconstruction and widening of East Avon Rd and roundabout construction at 23 Mile and Dequindre Rd. | Yes. | Dequindre Rd to Hamlin Rd to Ryan Rd to 23 Mile Rd, back to Dequindre Rd and vice versa. | GLWA | 12/5/22 | Mid-August 2023 | Great Lakes Water Authority |
Hatchery Road
| Dixie Highway to Airport Road (the work is just west of Frembes Road)
| Waterford Township
| Bridge replacement over the Clinton River, culvert replacement west of the bridge, demolition of the wooden pedestrian bridge (new bridge will facilitate pedestrians) and new guardrails.
| No.
| No.
| Toebe Construction
| 6/13
| COMPLETE | Hatchery Road Bridge Replacement over the Clinton River |
Joint Repairs
| Various heavier traveled roads.
| Commerce Township, Highland Township, Novi, Troy and Wixom.
| Milling (grinding pavement) road joints and paving with asphalt.
| No. During the work, the roads will remain open with flaggers directing traffic.
| No
| Cadillac Asphalt
| 6/16
| COMPLETE | Joint Repairs |
*Long Lake Road (PERMIT PROJECT) | North and south legs of Franklin Road (closure is between Groton Road and Pine Tree Trail) | Bloomfield Township | Bloomfield Township sanitary sewer work. | Yes, Long Lake Rd, just east of the south leg of Franklin Rd, is closed. Residential and business access maintained. | Telegraph Rd to Lone Pine Rd to Franklin Rd, back to Long Lake Rd and vice versa. Pine Tree Trl and Groton Rd residential access maintained from Franklin Rd. | VIL Construction on behalf of Bloomfield Township | 9/19 | Late December | Bloomfield Township |
Maloney Street Bridge Replacement
| North of Drahner Road over Clear Lake and Long Lake
| Oxford Township
| Removal and replacement of a bridge.
| The waterway under the bridge is closed to boats and other recreational traffic during the project. Residential access maintained.
| No.
| F.H. Paschen
| 7/5
| The new bridge is open to traffic | Maloney Street Bridge Replacement |
Orchard Lake Road
| Middlebelt Road to Old Telegraph Road
| Sylvan Lake, West Bloomfield Township, Bloomfield Township and Pontiac
| Road resurfacing work including asphalt paving, concrete slab replacements, Americans with Disabilities Act-compliant crosswalks, traffic signal upgrades, drainage improvements and widening east of Middlebelt Rd to accommodate a center left-turn lane.
| No.
| No.
| Florence Cement
| 6/27
| COMPLETE | Orchard Lake Road, Middlebelt to Old Telegraph Road |
*Ten Mile Road | Haggerty Road to Meadowbrook Road (closure is west of Bethany Way to just west of Nilan Drive). | Novi | Remove and replace culverts under the road. Bishop Creek culvert, just west of Bethany Way, will be removed and replaced starting Jan. 2023 (date to be announced) followed by the Ingersol Creek culvert located just west of Nilan Drive. Projects will be done separately. | Yes. Residential and business access maintained east and west of the culverts. | Novi Rd to Grand River Ave to Haggerty Rd, back to Ten Mile Rd and vice versa. | Toebe Construction | January of 2023 (date will be announced) | 4/17 (approximate) The Ten Mile Road resurfacing project, Meadowbrook to Haggerty Road, will continue in the spring of 2023 through the fall. | Ten Mile Road |