SlideShow

  • Leveling the north leg of the Walton Blvd. / Sashabaw Rd. intersection ahead of paving in Waterford Township
  • New curb on the North leg of the Walton Blvd. / Sashabaw Rd. intersection as part of the Walton Blvd. reconstruct in Waterford Township
  • Leveling on the north leg of the Walton Blvd. / Sashabaw Rd. intersection ahead of paving in Waterford Township
  • Walton Blvd. / Sashabaw Rd. intersection north leg closed as part of the Walton Blvd. reconstruct in Waterford Township
  • Walton Blvd. paved between Sashabaw Rd. and Dixie Hwy. looking westbound in Waterford Township
  • Roller on Walton Blvd. with Frembes Rd. sign in background, in Waterford Township
  • Rollers on freshly paved Walton Blvd. with paver in the background in Waterford Township
  • Hot mix asphalt being dumped into paver on Walton Blvd. between Sashabaw Rd. and Dixie Hwy. in Waterford Township
  • Lining up the paver with new curbs on Walton Blvd. between Sashabw Rd. and Dixie Hwy. in Waterford Township
  • Paver on westbound Walton Blvd. between Sashabaw Rd. and Dixie Hwy. in Waterford Township
  • Rollers on freshly laid asphalt on westbound Walton Blvd. between Sashabaw Rd. and Dixie Hwy. in Waterford Township
  • Paving on westbound Walton Blvd. between Sashabaw Rd. and Dixie Hwy. in Waterford Township
  • 30 mph work zone speed limit sign on Walton Blvd. in Waterford Township
  • Westbound Walton Blvd. torn up for reconstruction just east of Sashabaw Rd. in Waterford Township
  • Curb reconstruction on Sashabaw Rd. just north of Walton Blvd. in Waterford Township
  • Newly constructed part of the Walton Blvd./Sashabaw Rd. intersection in Waterford Township
  • Grader and loaders on Walton Blvd. at the Sashabaw Rd. intersection in Waterford Township
  • New asphalt on reconstructed eastbound Walton Blvd. in Waterford Township
  • Westbound Walton Blvd. torn up for reconstruction just west of Sashabaw Rd. in Waterford Twp.
  • Walton Blvd. and Sashanaw Road intersection after south leg paved
  • Walton Blvd. and Sashabaw Road intersection after south leg paved
  • Looking east on Walton Blvd. as road reconstruction work continues.
  • Looking west on Walton Blvd. as road reconstruction work continues.
  • Looking north toward the Walton Blvd. and Sashabaw Rd. intersection after paving.
  • South leg of Walton Blvd. and Sashabaw Rd. intersection after paving.
  • Walton Blvd. / Sashabaw Road street sign
  • Westbound Walton Blvd. before road removal.
  • Eastbound Walton Blvd. old road removed and preparing for repaving (Looking west)
  • Eastbound Walton Blvd. old road removed and preparing for repaving. (Looking east)
  • Westbound Walton Blvd. before complete removal of the current road.

Show previous set of thumbnails

Show next set of thumbnails

◄ Back to 2021 Walton Blvd. Reconstruct photos