Napier Road-9 to 10 Mile


  • ROAD:  Napier Road Gravel Paving, 9 Mile to 10 Mile Road (work started on April 9, 2018)
  • Napier Road/10 Mile roundabout construction (2017 project)   COMPLETE
  • PROJECT LIMITS:  Napier Road from 9 Mile to 10 Mile Road 
  • COMMUNITIES:   Lyon Township and Novi
  • COMMENTS:   
    • Approximate $6.3 million (80% federal/10% RCOC/5% Lyon Twp./5% Novi) project includes:
      • Construction of a roundabout at Napier and 10 Mile Road COMPLETE
      • Paving the gravel section of Napier Road from 9 Mile to 10 Mile Road 
      • Improved drainage
      • Soil excavation (completed in 2017)
  • PHASE 2 START DATE:  April 2, 2018 APRIL 9, 2018
  • END DATE:  mid-July 2018  OPEN TO TRAFFIC ON 7/6/18
  • DETOUR:  Yes, for through traffic (residential access will be maintained)
  • NAPIER ROAD DETOUR & Map Link:  Eight Mile Road to Beck Road to 10 Mile Road, back to Napier and vice versa   Residential access will be maintained.

Check out the time lapse video of the Napier/10 Mile roundabout construction: Napier/10 Mile Road Roundabout

Additional Project Information:

Napier Road between 9 Mile and 10 Mile roads opens to traffic on July 6, 2018

WHMI 93.5 FM Napier Road closure set for April 9 (4/9/18)

Napier Road paving between 9 Mile and 10 Mile roads will begin April 9, 2018

WHMI 93.5 FM article on Napier Road paving (3/26/18)

Oakland Press article on Napier Road paving (3/21/18)

Hometown Life article on Napier Road paving (3/20/18)

Napier/10 Mile construction to start on July 5; road closure begins July 17 

Napier from 9 Mile to 10 Mile to close to through traffic on Nov. 14 

Hometown Life article on the closure of Napier between 9 & 10 Mile Road (11/6/17)
  
Napier Rd construction between 9 Mile Rd and 10 Mile Rd to start Nov. 10

Workzone Camera Installed at Napier/10 Mile Road

Oakland Press article on Napier/10 Mile Project (June 29, 2017)

WHMI 93.5 article (May 15, 2017)


Oakland Press article (May 5, 2017)

RCOC to Host Second Public Information Meeting on May 24 in the City of Novi

2017 Public Information Flier

Hometown Life Article (April 26, 2017)

MDEQ Permits Awaited for Napier/10 Mile Project (3/1/17 article)

Additional Safety Measures at Napier/10 Mile Road; Major Consturction in 2017
 
Public Information Meeting Scheduled for September 14 for Napier/10 Mile Intersection Improvements & Paving of Napier between 9 and 10 Mile Roads

Napier/10 Mile Construction Photo Album

***Napier, 9 Mile to 10 Mile Detour Map


Griswold/8 Mile temporary traffic signal article

Napier (between 9 Mile and 10 Mile) to close 11/14/17 through 1/5/18 for excavation work (WHMI 93.5)


10 Mile Napier roundabout2